Print This Page Print This Page

Modification Documents

To view documentation associated with a current Modification Proposal select a link from the table below.

Where the Authority has passed a decision on a Modification Proposal the 'status' will change to that of Approved or Rejected. ‘Pending’ Modifications refer to those that are in being progressed as part of the Modification process or are with the Authority awaiting decision.

To filter the table below according to the status of the Modification, select the required status from the drop-down list.

Enter a Modification number of the format, PXXX OR enter a keyword to search on a title.

Show table containing 20 50 100 items

No.TitleStatus
P254Removal of Main and SVA Specified Charge Amounts from the CodePending
P253Improving the accuracy of the credit calculation for SVA participantsPending
P252Removal of Trading Parties’ ability to submit two votes at elections of BSC Panel industry membersPending
P251Revision of the election process for BSC Panel Industry MembersPending
P250Prevention of 'Timing Out' of Authority decisions on Modification ProposalsPending
P249Revision of banking arrangements under the BSCPending
P247Proposer ‘ownership’ of Modification ProposalsPending
P245Changes to Long Term vacant Sites TimescalesPending
P229Introduction of a seasonal Zonal Transmission Losses schemePending
   

ELEXON strives to provide sufficient information so the industry can make informed responses and decisions. To assist in the continuous improvement of our Modification and Change documentation, we welcome your feedback. It is especially helpful to receive examples on where documentation is falling short: please email examples to change_delivery_admin@elexon.co.uk attention to ELEXON Contact Chris Rowell, Head of Change Delivery.

Registered office: 4th Floor 350 Euston Road London NW1 3AW   Reg Co No: 3782949 Registered in England and Wales