ELEXON Home Page
0870 010 6950

ELEXON response to Industry consultation

ELEXON Responses to Industry Consultations

We monitor and respond to consultations that may have an impact on the provisions in the BSC, on ELEXON, or – through ELEXON – on our customers. We respond to consultations if we think that an area of the BSC may be affected or where clarification of the BSC provisions is of benefit to the consultation. Some of these consultations also elicit a response from the BSC Panel.

See the Consultations page for consultations issued by ELEXON for industry response.

If you are aware of consultations which you feel warrant a response from us, please email communications@elexon.co.uk

Show 5 | 10 | 20 | All

Filter by

All Industry Insights
(Showing items 1-5 of 170)

ELEXON’s response to National Grid’s consultation on the regulatory and incentives framework for the future Electricity System Operator [Closed]

  • Issue Date: 22 September 2017
  • Response Date: 6 October 2017

Summary

This is ELEXON’s response to National Grid’s consultation ‘The future of the Electricity System Operator: Viewpoint on the regulatory and incentives framework’.

Documents

ELEXON's response to National Grid's consultation on the future ESO regulatory and incentives framework  [26.7 Kb]

ELEXON comments on National Grid’s viewpoint on the regulatory and incentives framework for the Electricity System Operator (ESO) [Open]

  • Issue Date: 22 September 2017
  • Response Date: 16 October 2017

Summary

This is ELEXON’s response to National Grid’s viewpoint on the regulatory and incentives framework for the Electricity System Operator (ESO)

Documents

ELEXON comments National Grid’s ESO regulation viewpoint  [26.3 Kb]

ELEXON’s response to the ENA’s consultation on Promoting Access to Markets for Distributed Energy Resources [Closed]

  • Issue Date: 17 August 2017
  • Response Date: 29 September 2017

Summary

This is ELEXON’s response to the Energy Networks Association’s consultation ‘Commercial Principles for Contracted Flexibility: Promoting Access to Markets for Distributed Energy Resources’.

Documents

ELEXON's response to the ENA's consultation on promoting distributed energy  [171.7 Kb]

ELEXON’s response to ENTSO-E’s draft Work Programme [Closed]

  • Issue Date: 8 August 2017
  • Response Date: 20 September 2017

Summary

ELEXON’s response gives some specific examples of where ENTSO-E could help us and industry through increased engagement with stakeholders.

Documents

ELEXON’s response to ENTSO-E’s draft Work Programme  [169.7 Kb]

ELEXON’s response to Ofgem’s consultation on UK Link and proposed Central Switching Service [Closed]

  • Issue Date: 27 July 2017
  • Response Date: 28 September 2017

Summary

This is ELEXON’s response to Ofgem’s consultation on UK Link and the proposed Central Switching Service.

Documents

ELEXON’s response to Ofgem's consultation on UK Link and proposed Central Switching Service  [147.7 Kb]