Industry Insights

ELEXON Responses to Industry Consultations

We monitor and respond to consultations that may have an impact on the provisions in the BSC, on ELEXON, or – through ELEXON – on our customers. We respond to consultations if we think that an area of the BSC may be affected or where clarification of the BSC provisions is of benefit to the consultation. Some of these consultations also elicit a response from the BSC Panel.

See the Consultations page for consultations issued by ELEXON for industry response.

If you are aware of consultations which you feel warrant a response from us, please email communications@elexon.co.uk

Show 5 | 10 | 20 | All

Filter by

All Industry Insights
(Showing items 1-5 of 156)

ELEXON’s response to Ofgem’s consultations on its Forward Work Programme & Simplification Plan 2017/18 [Closed]

  • Issue Date: 18 January 2017
  • Response Date: 15 February 2017

Summary

This is ELEXON’s response to the following two consultations:

Ofgem’s consultation on its draft Forward Work Programme for 2017/18

Ofgem’s consultation on its Simplification Plan for 2017/18

Both consultations closed on 15 February 2017.

Documents

ELEXON's response to Ofgem's Forward Work Programme & Simplification Plan  [131.8 Kb]

ELEXON’s response to DCUSA Change Proposal 282 – ‘Embedded Distribution Network Operator (EDNO) UMSO’ [Closed]

  • Issue Date: 16 December 2016
  • Response Date: 12 January 2017

Summary

This is ELEXON’s response to DCP282. The CP intends to facilitate management/trading of Unmetered Supplies (UMS) apparatus connected to EDNO networks via the ‘host’ Distributor’s UMS Operator (UMSO) service on one combined inventory, where requested by the customer.

Documents

ELEXON's response to DCUSA CP282  [25.1 Kb]

ELEXON’s response to the National Infrastructure Commission’s Report on the Impact of Technological Change on Future Infrastructure Supply and Demand [Closed]

  • Issue Date: 9 December 2016
  • Response Date: 8 February 2017

Summary

This is ELEXON’s response to the National Infrastructure Commission’s Report on the Impact of Technological Change on Future Infrastructure Supply and Demand.

Documents

ELEXON's response to the NIC's Report on Technlogical Change  [116.1 Kb]

ELEXON’s response to Ofgem’s consultation on mandatory half-hourly settlement: aims and timetable for reform [Closed]

  • Issue Date: 11 November 2016
  • Response Date: 6 January 2017

Summary

This is ELEXON’s response to Ofgem’s consultation on its plan for moving to mandatory Half Hourly Settlement. The consultation seeks views on the aim of the reforms, timing considerations, the regulatory interventions to consider before implementing Half Hourly Settlement, and who should design and approve such interventions.

Documents

ELEXON's response to Ofgem's consultation on its plan for moving to mandatory Half Hourly Settlement  [263.6 Kb]

ELEXON’s response to the BEIS/Ofgem call for evidence on a smart, flexible energy system [Closed]

  • Issue Date: 10 November 2016
  • Response Date: 12 January 2017

Summary

This is ELEXON’s response to the joint BEIS/Ofgem call for evidence on a smart, flexible energy system. BEIS/Ofgem have considered a range of options including:

  • removing barriers to energy storage and Demand Side Response
  • improving price signals to allow more flexibility
  • catalysing innovation, so that new solutions can emerge and compete in the market
  • assessing changes to roles and responsibilities in the energy system

Documents

ELEXON's response to the BEIS/Ofgem call for evidence on a smart, flexible energy system  [209.8 Kb]