CP0972 – Review of BSCP71

Formal title: Review of BSCP71

Current Status

Submission
Assessment
CPC Consultation
Committee Decision
Rejected

Summary

Through operational experience it has become clear that the timescales referred to in BSCP71 are inaccurate. The timescales currently indicated in the BSCP need to be reviewed in light of operational practices. Further adjustments are required to some of the forms and interface timetables.

Progression

This CP was rejected

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.