Help
Print This Page
Change Process
The purpose of the Change Process is to maintain the integrity and robustness of the Code Subsidiary Documents, Balancing and Settlement Code (BSC) Systems and other Configurable Items and to ensure that all changes are introduced in a controlled and auditable manner.
This is achieved by:
- Implementing the Change Management Procedures within the BSC;
- Assessing all proposed changes and assisting the Panel Committees in making informed decisions;
- Implementing new, or revisions to existing, products; and
- Producing Baseline Statements
Details of the Change Process can be found within
BSCP40(204Kb)
.
For an overview of the Change Process refer to the related link alongside. Select an option from the table below or from the options on the left to view Change Process documents.
| Section | Description |
| Change Proposals | Key documentation relating to all Change Proposals (CPs). This section also includes guidance information on submitting a CP and the submission form. |
| Draft Change Proposals | Key documentation relating to all Draft Change Proposals (DCPs). This section also includes guidance information on submitting a DCP and the submission form. |
| Issues | Key documentation relating to all issues. This section also includes guidance information on submitting an issue and the submission form. |
| Assessment and Timetabling | Contains details regarding Change Proposal Circulars (CPCs), batching timetable and Impact Matrices |
| Change Proposal Circulars | Contains all of the CPCs issued by ELEXON |
| Progress Reports | Includes the Change Report, Change Register, the Release Plan and the Baseline statement |
| Conformed Category 1 Documents | Conformed Documents are Code Subsidiary Documents that include approved redlined changes for Change Proposals and/or Modifications that are awaiting implementation |