myELEXON
I'm not logged inWelcome
Email:

Password:
Print This Page Print This Page

Modification Proposal P251

Revision of the election process for BSC Panel Industry Members (Rejected)

Current Status

The Authority rejected both the Proposed and Alternative P251 Modifications on 16 June.

High Level Summary

The current Panel election process is complicated, with several voting rounds and the ability for voters to give up to three (non-transferable) candidate preferences. Arguably, it can lead to results which are not reflective of voters’ first choice of candidates, and which can potentially be influenced by tactical voting. 

P251 proposed a change to the BSC Panel Election procedure for the Industry Members of the BSC Panel, through adopting a standard Single Transferable Voting System.

Proposer: Esther Sutton (E.ON UK)

Current Phase: Rejected

Modification's Lifecycle

Below is a chronology of this Modification’s lifecycle. If you require further information, please email modifications@elexon.co.uk. To download documentation relating to this Modification Proposal please use the document basket.

Refer to the drop-down menu below to view the details of a different Modification Proposal.

Select Modification:
DateEventDocument TitleDocument StatusStatus Documents to add to basket Notifying of updated documents
01/02/2010Modification Proposal P251 raisedP251 Modification Proposal (155Kb) Confirmed
11/02/2010Initial Written Assessment (IWA) presented to the BSC PanelP251 Initial Written Assessment (329Kb) Confirmed
09/03/2010Assessment Procedure Consultation issuedP251 Assessment Procedure Consultation (878Kb) Confirmed
09/03/2010Request for Transmission Company analysis issuedP251 Transmission Company Analysis (870Kb) Confirmed
22/03/2010Assessment Consultation Responses returnedP251 Assessment Procedure Consultation Responses (219Kb) Confirmed
22/03/2010Transmission Company Analysis returnedP251 Transmission Company Analysis Response (161Kb) Confirmed
23/03/2010Second Assessment Modification Group meeting held No document neededConfirmed
08/04/2010Assessment Report presented to the BSC PanelP251 Assessment Report documents (789Kb) Confirmed
15/04/2010Report Phase Consultation issuedP251 Report Phase Consultation Documents (1.1Mb) Confirmed
30/04/2010Report Phase Consultation Responses returnedP251 Report Phase Consultation Responses (217Kb) Confirmed
13/05/2010Draft Modification Report presented to the PanelP251 Draft Modification Report (494Kb) Confirmed
17/05/2010Final Modification Report issued to the Authority for decisionP251 Final Modification Report (1.2Mb) Confirmed
16/06/2010P251 Authority Decision RejectedP251 Authority Decision - Signed (181Kb) Confirmed
18/06/2010P251 Authority Decision RejectedP251 NGET Notice (19Kb) Confirmed
Registered office: 4th Floor 350 Euston Road London NW1 3AW   Reg Co No: 3782949 Registered in England and Wales