Glossary Term: Total Output Usable

Total Output Usable is the national total generation and interconnector capacity that is expected to be available, and is provided by the System Operator.

This data is available over a range of forecast periods:

  • NOU2T14D     2-14 days ahead (daily peak half hour MW value)
  • NOU2T52W     2-52 weeks ahead (weekly peak half hour MW value)
  • NOU2T3YW     2-156 weeks ahead (weekly peak half hour MW value)

Suggest content changes

Glossary A-Z

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.