Release Implementation
The Implementation Date for the November 11 Release is Thursday 3 November 2011. All Configurable Items amended for the Release, including software systems and Code Subsidiary Documents, will become effective on this date.
Scope of the Release
The November 11 Release currently includes one Approved Modification and five approved Change Proposals.
This includes changes to the Pool Application software for CP1325 and changes to the SVA Data catalogue Volume 1 for CP1325 and CP1334. CP1325 removed obsolete PARMS Serials in the November 10 Release and CP1334 delivered some new PARMS serials and rendered other PARMS Serials obsolete in the June 11 Release. These changes to the Pool Application and the SVA Data Catalogue relate to the obsolete PARMS Serials, as a run-off period was required after the implementation of these changes before they could be fully removed. CP1348 reduced the required run-off period for the PARMS Serials rendered obsolete in the June 11 Release.
We’re also developing the software solution to CP1347 during this release, to save costs by using the existing test environment, but they won’t become effective until 23 February 2012. We’ll provide test files to LDSOs, for use in their testing, later this year.
In addition, the Release includes a small change to the BMRA Website, to provide more accurate Indicative Triad Demand data on the Market View page. This change does not require a Change Proposal. It is listed in the table below as a Service Improvement.
For conformed documents containing all approved changes, please see the Changes Awaiting Implementation page.
P253 | Improving the accuracy of the credit calculation for SVA participants | Section R
Section S
Section S Annex-S2
Section T
Section U
SAA software
SVAA software (new II VAR)
CDCA software
Pool Application software
BSCP01
BSCP502
BSCP503
BSCP505
BSCP508
BSCP509 Appendix MDD Entity Forms
SAA Service Description
CDCA Service Description
SVAA Service Description
IDD Parts 1 & 2 (not spreadsheets)
SAA URS
NHHDA Design Specification
NHHDA Logical Data Design
NHHDA System Management Guide
SVAA (ISRA) Technical Specification
ISRA (SVAA) Conceptual Process Model
ISRA (SVAA) Logical Data Design
ISRA (SVAA) Function Definition
SAA Settlement Calendar
SVAA Settlement Calendar
|
CP1325 | Removal of Obsolete PARMS Serials | Pool Application
SVA Data Catalogue Volume 1
|
CP1334 | New PARMS Serials | SVA Data Catalogue
|
CP1335 | Mandating use of Auxiliary Meter Technical Details Data flow | BSCP504
BSCP514
BSCP537 Appendix 1
BSCP537 Appendix 2
SVA Data Catalogue Volume 1
SVA Data Catalogue Volume 2
|
CP1345 | Migration of interface between National Grid and BMRA/SAA/ECVAA from CSV to XML file format | IDD Part 2 (Word Document)
|
CP1346 | Proving tests shall not be based on verbal Meter Technical Details | BSCP02
|
CP1347 | Enhancements to SVAA Process for Distribution of Consumption Data for Embedded Networks | SQL Script for SVAA (not effective until Feb 12)
|
| Service Improvement: Misleading Triad Data on BMRS | BMRA Website
|
NHHDA Upgrade Scripts and test files
NHHDA Upgrade Script
This script inserts the II Run into the NHHDA database.
Download the upgrade and backout scripts and instructions.
This script should be:
- tested by running it against a test instance of NHHDA in a test environment, using the test data provided below; and then
- deployed to live by running it against the live NHHDA system prior to the MDD Publish on 12 October 2011. If this is not done, the D0286 issued on 12 October will be rejected.
HHDA Upgrade
Each HHDA will need to create their own script to insert the II Run into their system’s database.
Data Aggregator Test Files
Download test files for each Data Aggregator in a zip file.
There is no issue with commercial confidentiality, as the test data is the same for each DA, and is not actual production data.
P253 Business Requirements Solution
The P253 Business Requirements Solution (BRS) is the definitive statement of the full solution to be delivered on 3 November 2011, and all of the impacts on BSC Parties, Party Agents and BSC Agents.
P253 BRS [306.9 Kb]
- Version: 1.0
- Issued On: 17 June 2011
- Status: Final Version
Impact Matrix
The Impact Matrix lists all Code Subsidiary Documents and Configurable Items which are impacted by the Release and all CPs in the Release and shows which CP(s) impact them.
Impact Matrix [87.5 Kb]
- Version: v0.1
- Last Updated On: 24 June 2011
Key Dates
SAA & SVAA Settlement Calendars amended for P253 published | 17 June 2011 |
NHHDA Upgrade Script available from ELEXON Portal | 8 July 2011 |
Industry Review of amended Configurable Items | 15 July 2011 |
ISG Approval of amended Configurable Items | 23 August 2011 |
SVG Approval of amended Configurable Items | 30 August 2011 |
First MDD Publish including P253 SVAA Settlement Calendar | 12 October 2011 |
Implementation Date | 3 November 2011 |
SAA & SVAA Settlement Calendars amended for P253
Amended Configurable Items
The following Code Subsidiary Documents and Configurable Items are now available for review. Please return any comments to releases@elexon.co.uk by 5:00pm on Friday 29 July 2011.