Standing Modification Group Issue 42
Black Start Generator – Defining a ‘Local Shutdown’
[Closed]
Summary
The P231 Workgroup previously highlighted that an instruction to a single Black Start Station (e.g. during a localised shutdown) could result in the suspension of normal BSC market operations. National Grid has raised this Standing Issue to facilitate further industry discussion of this issue, and whether any changes are needed to the BSC and/or Grid Code.
History
The final Issue 42 report was presented to the BSC Panel at it meeting on 11 August 2011. The Panel agreed to close Issue 42.