ELEXON responses to Industry consultations

ELEXON monitors and responds to industry wide consultations that may have an impact on the provisions in the BSC, on ELEXON, or – through ELEXON – on our customers.

We respond to these consultations if we think that an area of the BSC may be affected or where clarification of the BSC provisions is required. Some consultations also require a response from the BSC Panel.

Show 5 | 10 | 20 | All

Filter by

All Industry Insights
(Showing items 1-5 of 187)

ELEXON response to Ofgem Forward Work Programme 2018-2019 [Closed]

  • Issue Date: 12 February 2018
  • Response Date: 16 February 2018

Summary

ELEXON’s response to Ofgem’s consultation notes observations on several of the workstreams under two of four Key Priorities: Priority 1 – Enabling a better functioning retail market; and Priority 2 – Facilitating change in the energy system

Documents

ELEXON response to Ofgem Forward Work Programme 2018-2019 (16 Feb 2018)  [194.8 Kb]

ELEXON’s response to ENTSO-E’s 2017 stakeholder satisfaction survey [Closed]

  • Issue Date: 11 January 2018
  • Response Date: 31 January 2018

Summary

This is ELEXON’s response to ENTSO-E’s (EU Transmission System Operators) 2017 stakeholder satisfaction survey.

Documents

ELEXON’s response to ENTSO-E’s 2017 stakeholder satisfaction survey  [151.6 Kb]

ELEXON’s response to Ofgem’s ‘minded to’ assignments of TSO obligations under the European Electricity Balancing Guideline [Closed]

  • Issue Date: 10 January 2018
  • Response Date: 25 January 2018

Summary

This is ELEXON’s response to Ofgem’s ‘minded to’ assignments, in particular to clarify our respective obligations where there are dual assignments to both ELEXON and National Grid.

Documents

ELEXON's response to Ofgem's 'minded to' assignments of TSO obligations under the Electricity Balancing Guideline  [152.8 Kb]

ELEXON’s response to National Grid’s survey on establishing an IS User Group [Closed]

  • Issue Date: 22 December 2017
  • Response Date: 12 January 2018

Summary

This is ELEXON’s response to National Grid’s survey on establishing a System Operator IS User Group.

Documents

ELEXON's response to National Grid on its IS User Group  [174.0 Kb]

ELEXON’s response to Ofgem’s informal consultation on Electricity System Operator Licence Drafting [Closed]

  • Issue Date: 19 December 2017
  • Response Date: 26 January 2018

Summary

This is ELEXON’s response to Ofgem’s informal consultation on the Electricity System Operator (ESO) licence drafting as part of the ESO future arrangements and regulatory framework.

Documents

ELEXON’s response to Ofgem’s informal consultation on Electricity System Operator Licence Drafting  [154.8 Kb]