BSCPs

BSCPs define the relationships, timescales and interactions between participants and specify the information or other outputs to be exchanged between them.

For all Agent/Administrator contact details for which you should send BSCP forms, please refer to Related Content on the right-hand side of this page.

The latest conformed versions of BSCPs awaiting implementation are available on the Changes Awaiting Implementation page.

(Showing items 1-50 of 65)

Show 10 | 20 | 50 | All

BSCP 01 - Overview of Trading Arrangements

This overview describes the component activities of the Trading Arrangements detailed in the Code, from submission of trading data prior to Gate Closure through to final exchange of funds up to fourteen months later. This is in the form of a set of overview process diagrams and a schedule of trading activities (i.e., the Settlement process timetable).

Read More

BSCP 02 - Proving Test Requirements for Central Volume Allocation Metering Systems

This BSCP defines the minimum requirements for the proving of new, and changes to existing, Metering Systems. In order to maintain the integrity of Settlement every Metering System is required to go through a full ‘end-to-end’ set of commissioning and Proving Tests when it is first registered for Settlement purposes in the Central Meter Registration Service (CMRS).

Read More

BSCP 03 - Data Estimation and Substitution for Central Volume Allocation

This procedure describes the process for agreeing the appropriate metered data values associated with Active Energy meters to be used for CVA when there is a problem with the values obtained via the normal metered data collection process. This procedure also describes in section 3.3 the process for the Lead Party of BM Units in a Switching Group to request the correction of errors in the BM Unit Metered Volumes arising from technical constraints in the CDCA System.

Read More

BSCP 04 - BM Unit Metered Volumes for Interconnector Users

This procedure defines the process by which the Settlement Administration Agent (SAA) receives BM Unit metered data for each Interconnector User (IU) from the Interconnector Administrator (IA).

Read More

BSCP 05 - Meter Advance Reconciliation for Central Volume Allocation

This procedure covers the processing, agreement and authorisation of Meter readings in accordance with Section R paragraph 6.2 of the Code. This process provides verification of the accumulation of the half hourly metered data collected by the Central Data Collection Agent (CDCA) for the purposes of Settlement.

Read More

BSCP 06 - CVA Meter Operations for Metering Systems Registered in CMRS

This procedure defines the obligations on the Meter Operator Agent (MOA) in relation to the work of Meter operations for Central Volume Allocation (CVA) Metering Systems registered in Central Meter Registration Service (CMRS). It also outlines the responsibilities of the MOA, Central Data Collection Agent (CDCA) and Registrant with regard to notification of work and of the sealing and re-sealing of CVA Metering Equipment.

Read More

BSCP 11 - Trading Disputes

This BSC Procedure (BSCP) deals with the raising, resolution and rectification of all Trading Disputes, in accordance with Section W of the Balancing and Settlement Code (the Code).

Read More

BSCP 14 - Processing of Manifest Error Claims

This Procedure describes the steps to be taken in order to process a Manifest Error claim, from the initial raising of such a claim by the Lead Party of an affected BM Unit or the Transmission Company, to the final settlement of any payments in relation to the claim.

Read More

BSCP 15 - BM Unit Registration

This BSCP defines the key interfaces, interdependencies and timetable for the registration and de-registration of BM Units by the Party.

Read More

BSCP 18 - Corrections to Bid-Offer Acceptance Related Data

This BSC Procedure (BSCP) defines the processes that BSCCo, the Settlement Administration Agent (SAA), the Transmission Company (TC) and BSC Parties will use. This is specifically to input corrections to erroneous Final Physical Notification (FPN), Bid-Offer Data (BOD), Quiescent Physical Notification (QPN), Bid-Offer Acceptance Level (BOAL) and Bid-Offer Acceptance Level Flagged (BOALF) data (collectively referred to as the ‘Bid-Offer Acceptance Related Data’) within the Settlement Administration Agent (SAA) systems or Balancing Mechanism Reporting Agent (BMRA) systems.

Read More

BSCP 20 - Registration of Metering Systems for Central Volume Allocation

Read More

BSCP 25 - Registration of Transmission System Boundary Points, Grid Supply Points, GSP Groups and Distribution Systems Connection Points

Read More

BSCP 27 - Technical Assurance of Half Hourly Metering Systems for Settlement Purposes

Read More

BSCP 31 - Registration of Trading Units

Read More

BSCP 32 - Metering Dispensations

Read More

BSCP 38 - Authorisations

Read More

BSCP 40 - Change Management

Read More

BSCP 41 - Report Requests and Authorisations

Read More

BSCP 65 - Registration of Parties and Exit Procedures

Read More

BSCP 68 - Transfer of Registration of Metering Systems between CMRS and SMRS

Read More

BSCP 70 - CVA Qualification Testing for Parties and Party Agents

Read More

BSCP 71 - Submission of ECVNs and MVRNs

Read More

BSCP 75 - Registration of Meter Aggregation Rules for Volume Allocation Units

Read More

BSCP 128 - Production, Submission, Audit and Approval of Line Loss Factors

Read More

BSCP 128 - Appendix 1: Methodology of Self Assessment Document (MSAD) for Host LDSOs and Embedded LDSOs that do not Mirror

Read More

BSCP 128 - Appx 10 Calculation Self-Assessment Document (CSAD) for mid-year LLF submissions

Read More

BSCP 128 - Appendix 2: Methodology of Self Assessment Document (MSAD) for Host LDSOs and Embedded LDSOs that Mirror

Read More

BSCP 128 - Appendix 3: Calculation Self Assessment Document (CSAD) for Host LDSOs and Embedded LDSOs that do not Mirror

Read More

BSCP 128 - Appendix 4: Calculation Self Assessment Document (CSAD) for Host LDSOs and Embedded LDSOs that Mirror

Read More

BSCP 128 - Appendix 5 CSAD 2.1 and 2.2 tables for all Host and Embedded Submissions

Read More

BSCP 128 - Appendix 6 CVA Long and Short Format data files

Read More

BSCP 128 - Appendix 7 SVA Format data file (D0265)

Read More

BSCP 128 - Appendix 8 SVA Summary Report

Read More

BSCP 128 - Appendix 9 Site Specific LLF Calculation Audit Evidence Template

Read More

BSCP 201 - Black Start and Fuel Security Contingency Provisions and Claims Processes

Read More

BSCP 301 - Clearing, Invoicing and Payment

Read More

BSCP 501 - Supplier Meter Registration Service

Read More

BSCP 502 - Half Hourly Data Collection for SVA Metering Systems Registered in SMRS

Read More

BSCP 503 - Half Hourly Data Aggregation for SVA Metering Systems Registered in SMRS

Read More

BSCP 504 - Non Half Hourly Data Collection for SVA Metering Systems Registered in SMRS

Read More

BSCP 505 - Non Half Hourly Data Aggregation for SVA Metering Systems Registered in SMRS

Read More

BSCP 507 - Supplier Volume Allocation Standing Data Changes

Read More

BSCP 508 - Supplier Volume Allocation Agent

Read More

BSCP 509 - Changes to Market Domain Data

Read More

BSCP 509 - Appendix 1: MDD Entity Change Request Forms

Read More

BSCP 509 - Appendix 2: MDD Change Request Entity Validation

Read More

BSCP 510 - The Provision of Sampling Data to the Profile Administrator

Read More

BSCP 513 - Bulk Change of NHH Supplier Agent

Read More

BSCP 514 - SVA Meter Operations for Metering Systems Registered in SMRS

Read More

BSCP 515 - Licensed Distribution

Read More

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

ELEXON insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or