List of all BSC Change Proposals
CP1588 Mandating Calibration Checks for Main and Check Meters
This CP proposes to provide an assurance process to confirm whether a Meter Type is still operating within the allowed accuracy limits or is drifting towards, or beyond, the extreme end of the limits. It will also define the steps to be taken where an issue is identified mitigating the risk to Settlement. CP1588 originates from Issue 93 ‘Review of the BSC Metering Codes of Practice’.
CP1587 Obsolete Metering Equipment
Providing a process and transition period to remove unsupported assets and mitigate the risk to Settlement.
CP1586 Defining the requirements for Minimum Burden and CT ratios
In some cases, the Current Transformer (CT) ratios for the maximum current of the circuit is not appropriately selected, even though these ratios are vital for accurate energy settlement as they ensure safe and precise current conversion, maintain metering equipment within its optimal operating range, and uphold regulatory compliance standards. CP1586 originates from Issue 93 ‘Review of the BSC Metering Codes of Practice’.
CP1585 Submission of Half Hourly data for Embedded LDSO sites to Host LDSO
This CP proposes that the Half Hourly Data Collector send Half Hourly data for Embedded LDSO connected sites to the Host LDSO via D0275 and/or D0036 to improve the quality of forecasting and reduce manual effort.
CP1584 Allow non-BSC Parties to raise Change Proposals, add a CP withdrawal process and remove BCA/PACA concept
BSC Issue 102 ‘BSC Change Process Review’ identified several improvements to align and simplify BSC Change processes on solution ownership and recommended Elexon make changes to several current processes described within BSC Procedure (BSCP) BSCP40 “Change Management”.
CP1583 Rationalising publication of European Transparency Regulation (ETR) data on Elexon Systems
The ETR data published on the Balancing Mechanism Reporting Service (BMRS) was intended to provide additional insights to the market with approximately 40 reports currently available. This CP identifies several of these reports which are believed to be of minimal value to Elexon’s customers as the data is duplicated in other reports, has had no data reported, or has been superseded by subsequent regulatory changes.
CP1582 Update BSCP520 on Change of Measurement Class to ensure the UMSO send a D0388 with a zero charge code
CP1582 was originally raised as a housekeeping Change Proposal (CP) to update BSCP520 ‘Unmetered Supplies Registered in SMRS’ step 3.6.2.3, as introduced erroneously by P434 ‘Half Hourly Settlement for UMS Metering Systems’], states “UMSO confirms the de-energisation date to Supplier, NHHDC and MA”’ as Non Half Hourly (NHH) Unmetered Supply (UMS) sites don’t have a Meter Administrator (MA).
Following an objection to the CP as housekeeping, and subsequent consultation period, CP1582 has been expanded to provide greater clarity and alignment with industry process for BSCP520 where a Change of Measurement Class (CoMC) event has occurred.
CP1581 Recommendation to update BSCP18 following Issue 105
The Issue 105 ‘Further considerations following implementation of BSC Modification P448′ Workgroup has recommended a number of improvements to BSC Procedure (BSCP) 18 ‘Corrections to Bid-Offer Acceptance Related Data’.
CP1580 Making the Code Subsidiary Documents (CSDs) gender neutral and Housekeeping
CP1580 seeks to make the Code Subsidiary Documents (CSD) gender-neutral in line with the Balancing and Settlement Code (BSC) and present day legal drafting and to correct BSCP602 with a housekeeping change.
CP1579 Allowing HHDCs to undergo Protocol Approval before completing Qualification
This Change Proposal will allow Half Hourly Data Collectors (HHDCs) and Asset Metering Half Hourly Data Collectors (AMHHDCs) to undergo Protocol Approval before or during the Qualification process.