CP0584 – BSCP26: Policing of Metering Systems for CVA

Formal title: BSCP26: Policing of Metering Systems for CVA

Current Status

Submission
Assessment
CPC Consultation
Committee Decision
Awaiting Implementation
Implemented

Summary

Section 1. 11: last paragraph: replace ‘to effectuate rectification’. Section 1. 11: re-word to “…configurable meter parameters (as detailed in the Meter Technical Details) are not…. ” Section 1. 14 below the bullets: replace with ‘Each month the TAA shall: ‘Table 3. 1: All Methods to order manual methods as email / fax/ letter

Progression

This CP was implemented on 13/08/2002

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.