CP0811 – Clarify the timescales associated with steps 3.2.5.6 and 3.2.5.7 within BSCP550
Formal title: Clarify the timescales associated with steps 3.2.5.6 and 3.2.5.7 within BSCP550
Current Status
Summary
Process 3. 2. 5 ‘Removal of a Secondary Supplier(s) to a Shared SVA Metering System with a Multiple Fixed Block Allocation Schedule’ of BSCP550 ‘Shared SVA Meter Arrangement’ has two timescales within it referring to ‘contract SSD’. The references to ‘contract SSD’ are incorrect in the context of this process which has nothing to do with the change of supplier process. This is covered elsewhere in BSCP550.
Progression
This CP was implemented