CP0842 – Revision to Non-Half Historical Data Transfer Requirements

Formal title: Revision to Non-Half Historical Data Transfer Requirements

Current Status

Submission
Assessment
CPC Consultation
Committee Decision
Rejected

Summary

Revise the current flexibility relating to the transfer of non-half hourly historical data (i. e. meter readings and Annualised Advance / Estimated Annual Consumption) between old and new Non-Half Hourly Data Collectors (NHHDCs). The non-half hourly historical data requirements are described in Appendix 4. 8 ‘Historical Data Requirements’ of BSCP504 ‘Non-Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’. Appendix 4. 8 specifies the minimum historical data transfer requirement which will be triggered in one of the following business events: • A change of NHHDC; and
• A coincident change of NHHDC and Supplier.
Therefore the old NHHDC can choose to send more than the minimum specified in Appendix 4. 8 of BSCP504.

Progression

This CP was rejected

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.