CP0865 – BSCP68 Clarification
Formal title: BSCP68 Clarification
Current Status
Summary
The following minor documentation change is required to BSCP68 ‘Transfer of Registration of Metering Systems between SMRS and CMRS’. Section 3. 1. 1. 16 states within the Action box that the: ‘CVA MOA registers the Meter Technical Details with the CDCA in accordance with BSCP20 ref 3. 1. 7 & 3. 1. 8 and submits form BSCP20/4. 3a, b, c Registration of Meter Technical Details with proposed REFD) to the CDCA and Transfer Co-ordinator for information’. This should be altered to: ‘CVA MOA registers the Meter Technical Details with the CDCA in accordance with BSCP20 ref 3. 1. 7 & 3. 1. 8 and submits form BSCP20/4. 3a, b, c Registration of Meter Technical Details with proposed REFD) to the CDCA PDSO and Transfer Co-ordinator for information’.
It should be noted that the CVA MOA sends these forms to the CDCA/PDSO and Transfer Co-ordinator as indicated within the ‘From’ and ‘To’ columns.
Progression
This CP was implemented