CP1527 ‘Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’

Formal title: 'Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’

Current Status

Submission
Assessment
CPC Consultation
Committee Decision
Awaiting Implementation
Implemented

Summary

CP1527 proposes the following changes:

  • Increase the minimum data storage capacity for Settlement Outstations to 250 days per Outstation channel, at 30 minutes integration periods, for CoPs 1, 2, 3, 5 and 10; and
  • Mandate specific, selectable, integration periods for CoPs 3, 5, and 10 (i.e. 30, 20, 15, 10 and 5 minutes) and add a test for this requirement (and for CoPs 1 and 2) into BSCP601.

Podcast

Listen to the complete increasing the minimum data storage capacity for Settlement Outstations podcast:

If you would like a transcript for the CP1527 podcast then please email bsc.change@elexon.co.uk.

Progression

CP1527 was raised by ELEXON on behalf of the Issue 80 Workgroup. CP1527 was published for industry consultation over the period 10 February 2020 to 6 March 2020.

 

Next Events

The CP1527 Assessment Report will be presented to the ISG and SVG at their respective meetings on 7 April 2020.

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of ELEXON insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or