CP1598 Amending the EMDS to add missing Scenario Variants for P375

Formal title: Amending the EMDS to add missing Scenario Variants for P375

This CP seeks to update the EMDS to add missing Scenario Variants for P375. It also seeks to correct some references in the SVA Data Catalogue. 

The Retail Energy Code (REC) Energy Market Data Specification (EMDS) contains a number of Market Message Scenario Variants used in BSC processes.

Elexon has become aware that six Scenario Variants of Market Messages specified in BSCP603, which was introduced by P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’, were omitted in error from Panel paper 318/06 Attachment B.

As these Scenario Variants are not captured in the EMDS, the relevant Market Participants won’t be able to use the Data Transfer Network (DTN) to exchange the relevant data, which would result in them having to use a less secure mechanism to send and receive data.

The Supplier Volume Allocation (SVA) Data Catalogue Volume 1 Data Interfaces also contains some references to BSCP502 ‘Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’ for HHDC Asset Metering Activities and some references to BSCP514 ‘SVA Meter Operations for Metering Systems Registered in SMRS’ for Meter Operator Agent (MOA) Asset Metering Activities, which should be references to BSCP603.

Current Status

Submission
Change Proposal Consultation
Committee Decision
Awaiting Implementation
Implemented

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.