BSC Changes impacting a CVA Meter Operator Agent

This page shows which Modifications and Change Proposals have been identified as impacting a CVA Meter Operator Agent. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-5 of 12)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

P437 ‘Allowing non-BSC Parties to request Metering Dispensations’

This Modification proposes to introduce a provision in Section L ‘Metering’ to allow the relevant Meter Operator Agent to apply for Metering Dispensations on behalf of a non-BSC Party.

Read More

P427: Publication of Performance Assurance Parties’ impact on Settlement Risk

This Modification seeks to amend BSC Section Z to allow the Performance Assurance Board (PAB) to recommend that the Panel publish notices to industry in respect of Performance Assurance Parties’ (PAPs’) contribution to Settlement Risk along with relevant risk data.

Read More

CP1566 ‘Introducing the CVA Commissioning End to End Check (CEEC) process’

CP1566 seeks to formalise the Central Volume Allocation (CVA) Commissioning End to End Check (CEEC) process in BSCP02, BSCP20, BSCP38, CoP4 and CDCA Service Description for new and existing CVA Metering Systems.

Read More

CP1554 ‘Future proofing the measurement transformer standards’

CP1554 looks to future proof the  measurement transformer standards in Code of Practices 1, 2, 3, 4, 5 and 10

Read More

CP1553: Meters and Current Transformers minimum accuracy classes

This Change proposal looks to tighten the requirements for Meters and Current Transformers in the Code of Practice.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training videos and services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or