BSC Changes impacting a CVA Meter Operator Agent

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a CVA Meter Operator Agent. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-5 of 18)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

P463 ‘Introduce a Standard Change Process’

To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.

If you are interested in joining the P463 Workgroup, please sign up via the Modification and Issue Workgroup sign-up webpage.

Read More

CP1587 ‘Obsolete Metering Equipment’

Providing a process and transition period to remove unsupported assets and mitigate the risk to Settlement. 

Read More

P453 ‘Metering Dispensation process improvements and clarification to the CoPs’

This Modification seeks to progress two recommendations from Issue 93 ‘Review of the BSC metering Codes of Practice’. The first recommendation clarifies the relevant Code of Practice (CoP) for circuits embedded behind the Boundary Point Metering System or Defined Metering Point (DMP). The second recommendation eliminates the need for Metering Dispensations when the Actual Metering Point (AMP) does not coincide with the DMP, but there is no impact on Settlement accuracy.

Read More

P456 ‘Enable Elexon to procure ancillary Technology Services for use by BSC Agents’

Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.

Read More

CP1575 ‘Permitting the use of busbar voltage transformers within metering Codes of Practice 1 and 2’

This CP seeks to implement the recommendation from the Issue 87 ‘Busbar voltage transformer (VT) metering for Offshore wind farms under OFTO arrangements’ Workgroup by updating Code of Practice 1 and Code of Practice 2 to allow busbar VTs to be used at Offshore and onshore wind farms. 

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.