BSC Changes impacting a CVA Meter Operator Agent

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a CVA Meter Operator Agent. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-18 of 18)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

P463 ‘Introduce a Standard Change Process’

To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.

If you are interested in joining the P463 Workgroup, please sign up via the Modification and Issue Workgroup sign-up webpage.

Read More

CP1587 ‘Obsolete Metering Equipment’

Providing a process and transition period to remove unsupported assets and mitigate the risk to Settlement. 

Read More

P453 ‘Metering Dispensation process improvements and clarification to the CoPs’

This Modification seeks to progress two recommendations from Issue 93 ‘Review of the BSC metering Codes of Practice’. The first recommendation clarifies the relevant Code of Practice (CoP) for circuits embedded behind the Boundary Point Metering System or Defined Metering Point (DMP). The second recommendation eliminates the need for Metering Dispensations when the Actual Metering Point (AMP) does not coincide with the DMP, but there is no impact on Settlement accuracy.

Read More

P456 ‘Enable Elexon to procure ancillary Technology Services for use by BSC Agents’

Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.

Read More

CP1575 ‘Permitting the use of busbar voltage transformers within metering Codes of Practice 1 and 2’

This CP seeks to implement the recommendation from the Issue 87 ‘Busbar voltage transformer (VT) metering for Offshore wind farms under OFTO arrangements’ Workgroup by updating Code of Practice 1 and Code of Practice 2 to allow busbar VTs to be used at Offshore and onshore wind farms. 

Read More

CP1572 ‘Specifying the requirements to provide SLDs for HV and EHV sites’

Currently there is no requirement in the BSC to produce SLDs despite a number of BSC processes requiring one to be submitted. Without the requirement to produce SLDs being specified, some Parties have not felt incentivised to create them.

Read More

P427: Publication of Performance Assurance Parties’ impact on Settlement Risk

This Modification seeks to amend BSC Section Z to allow the Performance Assurance Board (PAB) to recommend that the Panel publish notices to industry in respect of Performance Assurance Parties’ (PAPs’) contribution to Settlement Risk along with relevant risk data.

Read More

P437 ‘Allowing non-BSC Parties to request Metering Dispensations’

This Modification proposes to introduce a provision in Section L ‘Metering’ to allow the relevant Meter Operator Agent to apply for Metering Dispensations on behalf of a non-BSC Party.

Read More

CP1566 ‘Introducing the CVA Commissioning End to End Check (CEEC) process’

CP1566 seeks to formalise the Central Volume Allocation (CVA) Commissioning End to End Check (CEEC) process in BSCP02, BSCP20, BSCP38, CoP4 and CDCA Service Description for new and existing CVA Metering Systems.

Read More

CP1550: Updates to monitoring of voltage failure alarms requirements

This Change Proposal looks to simplify the management of phase failures and update the requirements of voltage failure alarms.

Read More

CP1554 ‘Future proofing the measurement transformer standards’

CP1554 looks to future proof the  measurement transformer standards in Code of Practices 1, 2, 3, 4, 5 and 10

Read More

CP1553: Meters and Current Transformers minimum accuracy classes

This Change proposal looks to tighten the requirements for Meters and Current Transformers in the Code of Practice.

Read More

P429 ‘Switching off Participant-Reported PARMS Serials’

P429 will permanently cease the operation of, and remove the obligations associated with, participant-reported Performance Assurance Reporting and Monitoring System (PARMS) Serials and associated Supplier Charges.

Read More

CP1545 ‘Introducing Technical Assurance of Metering (TAM) Central Volume Allocation (CVA) Specific Sample audits’

Read More

CP1544 ‘BSCCo Approved EFR Representative sign-off required for any EFR plan following escalation’

Read More

P423 ‘Market-wide Half Hourly Settlement (MHHS) Implementation and Governance Arrangements’

Read More

CP1537 ‘Extending the Timescales for agreeing Technical Assurance of Performance Assurance Parties (TAPAP) Findings Reports’

Read More

CP1540 ‘Strengthening the Qualification – Change of Ownership Process’

Strengthening the Qualification - Change of Ownership Process
Read More