BSC Changes impacting a Generator
This page shows which Modifications and Change Proposals have been identified as impacting a Generator. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.
P472 ‘Amendment to provisions for Parties to bring claims against BSC Agents in BSC Section E’
This Modification proposes to amend BSC Section E to remove the requirement for Parties to be able to bring claims against BSC Agents. An industry Workgroup will be formed to consider what other measures (if any) might be appropriate to mitigate the impact of this on Parties.
P467 ‘Enduring Solution in an event of a Gas Deficit Emergency (GDE)’
This is a follow on Modification from Issue 105 and provides an enduring solution in an event of a Gas Deficit Emergency (GDE).
P412 ‘Ensuring non-BM Balancing Services providers pay for non-delivery imbalances at a price that reflects the real-time value of energy’
This Modification will introduce imbalance charges for non-Balancing Mechanism (BM) Balancing Services providers, where their delivery does not match instructed volumes. This will mean the GB market more effectively meets the requirements of the Clean Energy Package.
CP1594 ‘Creating an Approval Process for New and Legacy Communication Types’
Older metering communication types are quickly becoming redundant and are being replaced by newer communication types. Elexon are proposing to create an approvals process to allow for the managed end dating of older technologies, such as Public Switched Telephone Network (PSTN), Circuit Switched Data (CSD) and subsequently 2G.
P455 ‘On-Site Aggregation as a method to facilitate Third Party Access’
This Modification seeks to establish a more cost effective and efficient method for delivering Third Party Access on private networks that include domestic and small business customers. It does so by enabling aggregated meter data from sub meters on private networks to be submitted into Settlement in lieu of data from Settlement meters installed at the Boundary Point.
P470 ‘Protecting the Imbalance Price from IOLC related distortions’
P470 seeks to reprice Offer prices in the Imbalance Settlement Price calculation where those Offers were impacted by price restrictions introduced by the Inflexible Offers Licence Condition (IOLC).
P451 ‘Updating BSC Black Start provisions and compensation arrangements’
P451 seeks to facilitate the implementation of NGESO’s new approach to Black Start, termed System Restoration. In doing so, it proposes to update all BSC references to “Black Start” to “System Restoration”, and enable contracted Restoration Service Providers who are non-BSC parties to claim BSC Black Start compensation.
P463 ‘Introduce a Standard Change Process’
To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.
If you are interested in joining the P463 Workgroup, please sign up via the Modification and Issue Workgroup sign-up webpage.
P454 ‘Removal of BSC obligations to provide BMRS Data via TIBCO and the High Grade Service’
This Modification would remove the existing requirement within BSC Section V ‘Reporting’ for the Balancing Mechanism Reporting Agent (BMRA) to provide BMR Service (BMRS) data via the legacy High Grade Service, otherwise referred to as the TIBCO service.
P454 is a recommendation from BSC Issue 95, which considered the impacts associated with maintaining the legacy TIBCO service.
P469 ‘Credit Default Refusal and Rejection Period’
P469 proposal seeks to delay the Credit Default Refusal and Rejection Periods. This change would give parties a two-hour window from the Level 2 Credit Default notification until the time when any Energy Contract Volume Notifications (ECVN) related to a defaulting party are rejected.
To implement the proposed Solution, this Modification aims to change BSC Section M, 3.3.3 a (i) and (ii).