BSC Changes impacting a HH Data Collector

This page shows which Modifications and Change Proposals have been identified as impacting a Half Hourly Data Collector. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-10 of 24)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

CP1562 ‘Amendments to the approved IDD changes for P375’

CP1562 seeks to update the New Electricity Trading Arrangement (NETA) Interface Definition Documents(IDD) Part 1 and 2 that were approved under P375, to provide clarity to the relevant Parties that make use of the document.

Read More

P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’

P375 will allow Metering Equipment situated ‘behind’ the defined Boundary Point to be used for Settlement purposes in place of the Boundary Point Meter. Primarily, this will allow balancing-related services on-site from smaller assets to be separated from current imbalance-related activities, more accurately reflecting the balancing-energy volumes provided by the Balancing Service Provider (BSP).

Read More

P429 ‘Switching off Participant-Reported PARMS Serials’

P429 will permanently cease the operation of, and remove the obligations associated with, participant-reported Performance Assurance Reporting and Monitoring System (PARMS) Serials and associated Supplier Charges.

Read More

P434 ‘Half Hourly Settlement for UMS Metering Systems’

This Modification will require a period of mandatory Change of Measurement Class (CoMC) activity for all Non-Half Hourly (NHH) Unmetered Supplies (UMS) Metering Systems running from October 2023 to October 2024. It will also require all new UMS connections to be settled Half Hourly (HH) from October 2023. 

Read More

P427: Publication of Performance Assurance Parties’ impact on Settlement Risk

This Modification seeks to amend BSC Section Z to allow the Performance Assurance Board (PAB) to recommend that the Panel publish notices to industry in respect of Performance Assurance Parties’ (PAPs’) contribution to Settlement Risk along with relevant risk data.

Read More

P425 ‘Single Supplier Shared SVA Meter Arrangements’

This Modification aims to reduce the requirement from two or more Suppliers, to one or more Suppliers, to be involved in a Shared Supplier Volume Allocation (SVA) Metering Arrangement.

Read More

P432 ‘Half Hourly Settlement for CT Advanced Metering Systems’

This Modification proposes to align the BSC definition of an Advanced Meter with that in the Standard License Conditions (SLC) and to set explicit Half Hourly (HH) Settlement obligations for Current Transformer (CT) Advanced Meters ahead of the migration to Market-wide Half-Hourly Settlement (MHHS). 

Read More

P436 ‘Consequential BSC changes for Switching SCR (REC 3.0)’

Ofgem’s Switching Significant Code Review (SCR) will introduce the new Central Switching Service (CSS) and version 3.0 of the Retail Energy Code (REC 3.0). P436 progresses the consequential BSC changes needed to align with REC 3.0. 

Read More

CP1560 ‘Demand Control Event Process Clarifications’

This CP seeks to clarify the processes that take place after a Demand Control Event by amending the relevant Code Subsidiary Documents to ensure clarity and consistency. 

Read More

CP1559 ‘Complex Sites Process Improvements’

This Change Proposal will deliver improvements to the Complex Sites process.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training videos and services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or