BSC Changes impacting a HH Data Collector
This page shows which Modifications and Change Proposals have been identified as impacting a Half Hourly Data Collector. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.
P463 ‘Introduce a Standard Change Process’
To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.
If you are interested in joining the P463 Workgroup, please sign up via the Modification and Issue Workgroup sign-up webpage.
P455 ‘On-Site Aggregation as a method to facilitate Third Party Access’
This Modification seeks to establish a more cost effective and efficient method for delivering Third Party Access on private networks that include domestic and small business customers. It does so by enabling aggregated meter data from sub meters on private networks to be submitted into Settlement in lieu of data from Settlement meters installed at the Boundary Point.
P459 ‘Allowing different Supplier Agents to be appointed to Import and Export MSIDs’
This Modification would allow Suppliers to appoint different Supplier Volume Allocation (SVA), Meter Operator Agents (MOAs) and Data Collectors (DCs) for the Import and Export Metering System Identifiers (MSIDs) where Data Communications Company (DCC) adopted smart meters are installed. Being able to appoint different Supplier Agents across Import/Export MSIDs will remove a barrier preventing the use of Export MSIDs for small-scale micro-generation, which currently disbenefits Suppliers, sales and operators of micro-generation, and electricity consumers.
P442 ‘Reporting chargeable volumes for exempt and licensed supply’
This Modification seeks to allow correct reporting of chargeable volumes to the EMRS company for SVA Metering Systems that record both exempt supply and licensed supply through the addition of a new third party role, the “Exempt Supply Notification Agent”.
P432 ‘Half Hourly Settlement for CT Advanced Metering Systems’
This Modification proposes to align the BSC definition of an Advanced Meter with that in the Standard License Conditions (SLC) and to set explicit Half Hourly (HH) Settlement obligations for Current Transformer (CT) Advanced Meters ahead of the migration to Market-wide Half-Hourly Settlement (MHHS).
P456 ‘Enable Elexon to procure ancillary Technology Services for use by BSC Agents’
Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.
CP1579 ‘Allowing HHDCs to undergo Protocol Approval before completing Qualification’
This Change Proposal will allow Half Hourly Data Collectors (HHDCs) and Asset Metering Half Hourly Data Collectors (AMHHDCs) to undergo Protocol Approval before or during the Qualification process.
CP1575 ‘Permitting the use of busbar voltage transformers within metering Codes of Practice 1 and 2’
This CP seeks to implement the recommendation from the Issue 87 ‘Busbar voltage transformer (VT) metering for Offshore wind farms under OFTO arrangements’ Workgroup by updating Code of Practice 1 and Code of Practice 2 to allow busbar VTs to be used at Offshore and onshore wind farms.
CP1585 ‘Submission of Half Hourly data for Embedded LDSO sites to Host LDSO’
This CP proposes that the Half Hourly Data Collector send Half Hourly data for Embedded LDSO connected sites to the Host LDSO via D0275 and/or D0036 to improve the quality of forecasting and reduce manual effort.
P441 ‘Creation of Complex Site Classes’
This Modification looks to progress a recommendation of the Issue 88 Workgroup to introduce Complex Site classes. These classes would categorise the types of Complex Site, each having clearly defined criteria within the BSC. A new “type” of Complex Site (referred to as a Class 6 Complex Site) to allow approval of ”non-standard” complex sites would also be introduced.
P441 would also clarify when the netting of Imports from Exports for multiple Metering Systems registered in Supplier Volume Allocation (SVA) is permitted.
This change would facilitate consistency across the market and as so called “Local Energy Schemes” become more popular, rules for when netting are permitted would be clearly defined going forward.