BSC Changes impacting Meter Administrators

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting Meter Administrators. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-5 of 12)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

P463 ‘Introduce a Standard Change Process’

To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.

If you are interested in joining the P463 Workgroup, please sign up via the Modification and Issue Workgroup sign-up webpage.

Read More

P456 ‘Enable Elexon to procure ancillary Technology Services for use by BSC Agents’

Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.

Read More

P427: Publication of Performance Assurance Parties’ impact on Settlement Risk

This Modification seeks to amend BSC Section Z to allow the Performance Assurance Board (PAB) to recommend that the Panel publish notices to industry in respect of Performance Assurance Parties’ (PAPs’) contribution to Settlement Risk along with relevant risk data.

Read More

CP1567 ‘New BSC Procedure (BSCP) for Assurance Information Requests (AIRs)’

The AIR is a Performance Assurance Technique (PAT) which was introduced in May 2022. Currently there is no related BSCP for an AIR, therefore when issuing an AIR, there is no written obligation on Parties to adhere to the request.

Read More

P434 ‘Half Hourly Settlement for UMS Metering Systems’

This Modification will require a period of mandatory Change of Measurement Class (CoMC) activity for all Non-Half Hourly (NHH) Unmetered Supplies (UMS) Metering Systems to complete before the Market Wide Half Hourly Settlement (MHHS) migration to the Target Operating Model (Milestone 11 (M11) in the MHHS Timetable). At the time of writing, this would need to complete by October 2024. It will also require all new UMS connections to be settled Half Hourly (HH) from 12 months prior to M11, currently October 2023.

Read More