BSC Changes identified as having no impact

Glossary

This page shows which Modifications and Change Proposals have been identified as having no impact on BSC Parties or Party Agents. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-10 of 42)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

CP1531 ‘Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run’

Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run

Read More

CP1539 ‘Inclusion of LCCC as an Affected party in Metering Dispensation applications’

Read More

CP1548 ‘Remove constraint requiring BMRS to publish data files in a specific CSV format and structure’

This change proposal, CP1548, seeks to remove the specification of particular download formats in NETA IDD Part 1 Document paragraph 4.13 and be housed and maintained in the BMRS API and Data Push User Guide

Read More

CP1547 ‘Clarification on Site Specific LLF Calculation Process for Embedded LDSOs’

CP1547 seeks to provide clarity for Embedded LDSOs that choose to calculate Site Specific Line Loss Factors rather than Mirroring, through updates to BSCP128. 

Read More

CP1551 ‘Measuring Instruments Regulations – updates to BSCP601’

CP1551 seeks to update BSCP601 ‘Metering Protocol Approval and Compliance Testing’ so it aligns with new Government legislation for new Meters being placed on the GB market.

Read More

CP1557: Housekeeping change to update CP1532 solution

CP1557 makes non-material changes to update the CP1532 solution to reflect changes made to BSCP502 ‘Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’ following the implementation of P420.

Read More

CP1561 ‘Updating SVA DC Volume 1 and 2 for CP1546’

CP1561 looks to update the Supplier Volume Allocation (SVA) Catalogue Volume 1 and 2 to include the approved data flows and data items from CP1546.

Read More

CP1546 ‘Introducing DTC flows to transfer UMS Summary Inventories and Control files’

Read More

P447 ‘Avoiding impact of Winter Contingency actions on cash-out prices’

This Modification would prevent negative impacts to the cash-out price if NGESO’s Winter Contingency service is used.

Read More

CP1566 ‘Introducing the CVA Commissioning End to End Check (CEEC) process’

CP1566 seeks to formalise the Central Volume Allocation (CVA) Commissioning End to End Check (CEEC) process in BSCP02, BSCP20, BSCP38, CoP4 and CDCA Service Description for new and existing CVA Metering Systems.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.