P419 ‘Extension of P383 to include non-final Demand’

This Modification seeks to enable BSC Systems to aggregate the Import data of all non-Final Demand sites for exclusion from Balancing Services and Use of System (BSUoS) charges.

Read More

CP1554 ‘Future proofing the measurement transformer standards’

CP1554 looks to future proof the  measurement transformer standards in Code of Practices 1, 2, 3, 4, 5 and 10

Read More

CP1552 ‘Reflecting BSCP501 timeframes in BSCP520 processes’

CP1552 seeks to provide clarity to market participants about the timeframes for various processes in BSCP520 ‘Unmetered Supplies Registered in SMRS’. 

Read More

CP1556 ‘Improving the CVA Qualification Testing experience for VLPs and AMVLPs’

CP1556 looks to update BSCP70 ‘CVA Qualification Testing for Parties and Party Agents’ and the Communication Requirements Document to include a test request process and a list of P-flows for VLPs and AMVLPs.

Read More

P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’

P375 will allow Metering Equipment situated ‘behind’ the defined Boundary Point to be used for Settlement purposes in place of the Boundary Point Meter. Primarily, this will allow balancing-related services on-site from smaller assets to be separated from current imbalance-related activities, more accurately reflecting the balancing-energy volumes provided by the Balancing Service Provider (BSP).

Read More

P429 ‘Switching off Participant-Reported PARMS Serials’

P429 will permanently cease the operation of, and remove the obligations associated with, participant-reported Performance Assurance Reporting and Monitoring System (PARMS) Serials and associated Supplier Charges.

Read More

P434 ‘Half Hourly Settlement for UMS Metering Systems’

This Modification will require a period of mandatory Change of Measurement Class (CoMC) activity for all Non-Half Hourly (NHH) Unmetered Supplies (UMS) Metering Systems running from October 2023 to October 2024. It will also require all new UMS connections to be settled Half Hourly (HH) from October 2023. 

Read More

P440 ‘Enabling Elexon to administer the Capacity Market Advisory Group’

The BSC does not currently allow Elexon to undertake administrative activities that would support the Capacity Market Advisory Group (CMAG). This does not align to Ofgem’s decision to appoint Elexon to undertake the CMAG administrative activities on its behalf.

Read More

P427: Publication of Performance Assurance Parties’ impact on Settlement Risk

This Modification seeks to amend BSC Section Z to allow the Performance Assurance Board (PAB) to recommend that the Panel publish notices to industry in respect of Performance Assurance Parties’ (PAPs’) contribution to Settlement Risk along with relevant risk data.

Read More

P425 ‘Single Supplier Shared SVA Meter Arrangements’

This Modification aims to reduce the requirement from two or more Suppliers, to one or more Suppliers, to be involved in a Shared Supplier Volume Allocation (SVA) Metering Arrangement.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training videos and services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or