BSC Changes impacting a Supplier

This page shows which Modifications and Change Proposals have been identified as impacting a Supplier. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-10 of 45)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

CP1567 ‘New BSC Procedure (BSCP) for Assurance Information Requests (AIRs)’

The AIR is a Performance Assurance Technique (PAT) which was introduced in May 2022. Currently there is no related BSCP for an AIR, therefore when issuing an AIR, there is no written obligation on Parties to adhere to the request.

Read More

CP1559 ‘Complex Sites Process Improvements’

This Change Proposal will deliver improvements to the Complex Sites process.

Read More

P441 ‘Creation of Complex Site Classes’

This Modification looks to progress a recommendation of the Issue 88 Workgroup to introduce Complex Site classes. These classes would categorise the types of Complex Site, each having clearly defined criteria within the BSC. A new “type” of Complex Site (referred to as a Class 6 Complex Site) to allow approval of ”non-standard” complex sites would also be introduced.
P441 would also clarify when the netting of Imports from Exports for multiple Metering Systems registered in Supplier Volume Allocation (SVA) is permitted.

This change would facilitate consistency across the market and as so called “Local Energy Schemes” become more popular, rules for when netting are permitted would be clearly defined going forward.

Read More

P427: Publication of Performance Assurance Parties’ impact on Settlement Risk

This Modification seeks to amend BSC Section Z to allow the Performance Assurance Board (PAB) to recommend that the Panel publish notices to industry in respect of Performance Assurance Parties’ (PAPs’) contribution to Settlement Risk along with relevant risk data.

Read More

P426 ‘Combining related BSC Parties’ Energy Indebtedness positions for the Credit Cover Percentage calculation’

This Modification proposes to remove inefficiencies with the Credit Cover calculation by allowing related BSC Parties to combine their Energy Indebtedness prior to calculating the Credit Cover Percentage.

Read More

P440 ‘Enabling Elexon to administer the Capacity Market Advisory Group’

The BSC does not currently allow Elexon to undertake administrative activities that would support the Capacity Market Advisory Group (CMAG). This does not align to Ofgem’s decision to appoint Elexon to undertake the CMAG administrative activities on its behalf.

Read More

P425 ‘Single Supplier Shared SVA Meter Arrangements’

This Modification aims to reduce the requirement from two or more Suppliers, to one or more Suppliers, to be involved in a Shared Supplier Volume Allocation (SVA) Metering Arrangement.

Read More

CP1565 ‘Updates to address Central Management System issues’

This CP seeks to update BSCP520 to contain clearly outlined processes for approval and fault reporting of Central Management Systems.

Read More

P438 ‘Amending the BSC to address sanction orders’

This Modification would allow Elexon to seamlessly give effect to sanctions orders.

Read More

P412 ‘Ensuring non-BM Balancing Services providers pay for non-delivery imbalances at a price that reflects the real-time value of energy’

This Modification will introduce imbalance charges for non-Balancing Mechanism (BM) Balancing Services providers, where their delivery does not match instructed volumes. This will mean the GB market more effectively meets the requirements of the Clean Energy Package.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training videos and services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or