BSC Changes impacting a SVA HH Meter Operator Agent

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a SVA Half Hourly Meter Operator Agent. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-10 of 15)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

CP1534 ‘Introduce Change of Supplier (CoS) – No Meter Process’

Read More

CP1530 ‘Introduction of a formalised process for the validation of measurement transformer ratios by Elexon’

Read More

P420 ‘Retail Code Consolidation Significant Code Review’

Read More

P423 ‘Market-wide Half Hourly Settlement (MHHS) Implementation and Governance Arrangements’

Read More

P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’

P375 will allow Metering Equipment situated ‘behind’ the defined Boundary Point to be used for Settlement purposes in place of the Boundary Point Meter. Primarily, this will allow balancing-related services on-site from smaller assets to be separated from current imbalance-related activities, more accurately reflecting the balancing-energy volumes provided by the Balancing Service Provider (BSP).

Read More

CP1532 ‘Reduce Half Hourly Change of Supplier timelines to meet the Initial Settlement Run’

Read More

P430 ‘Extension of P375 to include Suppliers’

P430 seeks to extend the solution to Approved Modification P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’ to allow Suppliers to register Asset Meters and allocate Asset Metering System Identifier (AMSID) Pairs to Secondary Balancing Mechanism Units (SBMUs).

Read More

P436 ‘Consequential BSC changes for Switching SCR (REC 3.0)’

Ofgem’s Switching Significant Code Review (SCR) will introduce the new Central Switching Service (CSS) and version 3.0 of the Retail Energy Code (REC 3.0). P436 progresses the consequential BSC changes needed to align with REC 3.0. 

Read More

CP1563 ‘Altering the Trigger Point and subsequent Timescales for Commissioning SVA CT Operated Metering Systems and issue of Data Flow’

CP1563 seeks to update some of the trigger points for Current Transformer (CT) Commissioning and subsequent sending of data flows as the Proposer considers that they are not appropriate for CT operated metering systems of all types.

Read More

P456 ‘Enable Elexon to procure ancillary Technology Services for use by BSC Agents’

Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.