BSC Changes impacting a SVA HH Meter Operator

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a SVA Half Hourly Meter Operator. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-5 of 7)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

CP1369 – Increased Flexibility in BSCP550 Data Splitting Algorithms

Increased Flexibility in BSCP550 Data Splitting Algorithms
Read More

P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’

P375 will allow Metering Equipment situated ‘behind’ the defined Boundary Point to be used for Settlement purposes in place of the Boundary Point Meter. Primarily, this will allow balancing-related services on-site from smaller assets to be separated from current imbalance-related activities, more accurately reflecting the balancing-energy volumes provided by the Balancing Service Provider (BSP).

Read More

P425 Single Supplier Shared SVA Meter Arrangements

This Modification aims to reduce the requirement from two or more Suppliers, to one or more Suppliers, to be involved in a Shared Supplier Volume Allocation (SVA) Metering Arrangement.

Read More

P456 Enable Elexon to procure ancillary Technology Services for use by BSC Agents

Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.

Read More

P474 Governance, funding and operation of the DIP

This Modification proposes changes to the BSC to enable the ongoing governance, funding and operation of the Data Integration Platform (DIP).

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.