BSC Changes impacting a SVA Meter Operator Agent
This page shows which Modifications and Change Proposals have been identified as impacting a SVA Meter Operator Agent. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.
P463 ‘Introduce a Standard Change Process’
To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.
If you are interested in joining the P463 Workgroup, please sign up via the Modification and Issue Workgroup sign-up webpage.
CP1588 ‘Mandating Calibration Checks for Main and Check Meters’
This CP proposes to provide an assurance process to confirm whether a Meter Type is still operating within the allowed accuracy limits or is drifting towards, or beyond, the extreme end of the limits. It will also define the steps to be taken where an issue is identified mitigating the risk to Settlement. CP1588 originates from Issue 93 ‘Review of the BSC Metering Codes of Practice’.
P432 ‘Half Hourly Settlement for CT Advanced Metering Systems’
This Modification proposes to align the BSC definition of an Advanced Meter with that in the Standard License Conditions (SLC) and to set explicit Half Hourly (HH) Settlement obligations for Current Transformer (CT) Advanced Meters ahead of the migration to Market-wide Half-Hourly Settlement (MHHS).
P453 ‘Metering Dispensation process improvements and clarification to the CoPs’
This Modification seeks to progress two recommendations from Issue 93 ‘Review of the BSC metering Codes of Practice’. The first recommendation clarifies the relevant Code of Practice (CoP) for circuits embedded behind the Boundary Point Metering System or Defined Metering Point (DMP). The second recommendation eliminates the need for Metering Dispensations when the Actual Metering Point (AMP) does not coincide with the DMP, but there is no impact on Settlement accuracy.
P456 ‘Enable Elexon to procure ancillary Technology Services for use by BSC Agents’
Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.