List of all BSC Change Proposals

These pages list all Change Proposals (CP) issued since 2010. These are detailed proposals which are raised to amend CSDs and/or BSC Systems, but would not alter the BSC. They must have a clear aim, a single defined solution and contain the relevant redlined documentation changes.

(Showing items 1-100 of 1038)

Show 10 | 20 | 50 | 100 | All

CP1555: Consumption data for Measurement Classes G and F

Read More

CP1554: Future proofing the measurement transformer standards

CP1554 looks to future proof the  measurement transformer standards in Code of Practices 1, 2, 3, 4, 5 and 10

Read More

CP1553: Meters and Current Transformers minimum accuracy classes

This Change proposal looks to tighten the requirements for Meters and Current Transformers in the Code of Practice.

Read More

CP1552: Reflecting BSCP501 timeframes in BSCP520 processes

CP1552 seeks to provide clarity to market participants about the timeframes for various processes in BSCP520. 

Read More

CP1551: Measuring Instruments Regulations – updates to BSCP601

CP1551 seeks to update BSCP601 so it aligns with new Government legislation for new Meters being placed on the GB market.

Read More

CP1550: Updates to monitoring of voltage failure alarms requirements

This Change Proposal looks to simplify the management of phase failures and update the requirements of voltage failure alarms.

Read More

CP1549: Amendment of BSCP516 to clarify the criteria for Non-Domestic SVA Metering Systems

CP1549 seeks to remove the text from BSCP516 that suggests a Change of Measurement Class from HH to NHH PCs 3 or 4 is not possible from BSCP516 so that it aligns with the correct interpretation of the rules set out in the BSC.

Read More

CP1548 ‘Remove constraint requiring BMRS to publish data files in a specific CSV format and structure’

This change proposal, CP1548, seeks to remove the specification of particular download formats in NETA IDD Part 1 Document paragraph 4.13 and be housed and maintained in the BMRS API and Data Push User Guide

Read More

CP1547 Clarification on Site Specific LLF Calculation Process for Embedded LDSOs

CP1547 seeks to provide clarity for Embedded LDSOs that choose to calculate Site Specific Line Loss Factors rather than Mirroring, through updates to BSCP128. 

Read More

CP1546 ‘Introducing DTC flows to transfer UMS Summary Inventories and Control files’

Read More

CP1545 ‘Introducing Technical Assurance of Metering (TAM) Central Volume Allocation (CVA) Specific Sample audits’

Read More

CP1544 ‘BSCCo Approved EFR Representative sign-off required for any EFR plan following escalation’

Read More

CP1543 ‘Use of DTC dataflow D0051 in the Half Hourly sector’

Read More

CP1542 ‘Transfer the obligation to visit de-energised sites annually from Data Collector to Supplier’

Read More

CP1541 ‘Use of D0004 in BSCP502’

Read More

CP1540 ‘Strengthening the Qualification – Change of Ownership Process’

Strengthening the Qualification - Change of Ownership Process
Read More

CP1539 ‘Inclusion of LCCC as an Affected party in Metering Dispensation applications’

Read More

CP1538 Correct Specification of TERRE Tibco messages

The Assessment Report for CP1538 was presented to the  ISG on 2 February 2021, where it was approved for implementation in the April 2021 ad-hoc BSC release

Read More

CP1537 ‘Extending the Timescales for agreeing Technical Assurance of Performance Assurance Parties (TAPAP) Findings Reports’

Read More

CP1536 ‘Use of DTC data flow D0379 for submission of unmetered Half Hourly data’

Read More

CP1535 ‘Interconnector Fuel Type Category update to BMRS’

CP1535 seeks to Add the North Sea Link (NSL) Interconnector to the BMRS. CP1535 will also enable the withdrawal of the CP1516 interim solution to incorporate data from IFA2 and ElecLink Interconnectors on the BMRS.

Read More

CP1534 ‘Introduce Change of Supplier (CoS) – No Meter Process’

Read More

CP1533 ‘Mandatory Sending of D0052 for DCC serviced SVA NHH Metering Systems’

CP1533 intends to update clause 3.2.6.50 in BSCP504 to remove instances of the word “new” in order to make it clear that D0052s shall be sent in all instances.

Read More

CP1532 ‘Reduce Half Hourly Change of Supplier timelines to meet the Initial Settlement Run’

Read More

CP1531 ‘Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run’

Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run

Read More

CP1530 ‘Introduction of a formalised process for the validation of measurement transformer ratios by Elexon’

Read More

CP1529 ‘Earlier initiation of Supplier Agreed Meter Readings process’

Earlier initiation of Supplier Agreed Meter Readings process
Read More

CP1528 ‘CoP4 clarification of BSC Party responsibility for Commissioning of measurement transformers that the BSC Party adopts’

‘CoP4 clarification of BSC Party responsibility for Commissioning of measurement transformers that the BSC Party adopts’
Read More

CP1527 ‘Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’

'Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’
Read More

CP1526 ‘Introduction of Service Level Agreements for rectifying Meter faults’

CP1526 seeks to introduce formal Service Level Agreements that should be adhered to by Meter Operator Agents (MOAs) and Licensed Distribution System Operators (LDSOs) when rectifying Half Hourly Meter faults to ensure continued overall accountability of rectifying faults on Metering Equipment.

Read More

CP1525 ‘Improving the involvement of the LDSO in the fault resolution process’

CP1525 seeks to define a new process that would place obligations on Licensed Distribution System Operators (LDSOs) to rectify Half Hourly Meter faults where the fault is with Metering Equipment owned by the LDSO.

Read More

CP1524 ‘Improving the communication methods in the fault rectification process’

CP1524 seeks to implement changes to the communication process used by parties involved in rectifying faults on Half Hourly Metering Equipment.

Read More

CP1523 ‘D0312 Process Alignment’

BSCP501 Amendments to clarify the D0312 process
Read More

CP1522 ‘Updates to BSCP520 to align with working practices and UMSUG recommendations’

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1521 ‘BSCP70 Amendments for IA and IEA’

This Change Proposal seeks to amend BSCP70 to remove the statement excluding  Interconnector Administrator (IA) and Interconnector Error Administrator (IEA) roles from the requirement to undergo CVA Qualification Testing.

Read More

CP1520 Clarification to ‘Change of Ownership’ process in BSCP537

Clarification to 'Change of Ownership' process in BSCP537
Read More

CP1519 ‘Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations’

Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations
Read More

CP1518: Housekeeping change to address errors in the approved changes to BSCP514 for CP1515

Housekeeping change to address errors in the approved changes to BSCP514 for CP1515
Read More

CP1517: Changes to BSC Configurable Items for the TERRE Final Implementation Date

Changes to BSC Configurable Items for the TERRE Final Implementation Date
Read More

CP1516: New Interconnector Fuel Type Categories: ElecLink & IFA2

New Interconnector Fuel Type Categories: ElecLink & IFA2
Read More

CP1515: Faster Switching

Meter Operator Agents to send Metering System Data to SMRS instead of ECOES for the Faster Switching Programme
Read More

CP1514: Number of register digits for smart Meters

Number of register digits for smart Meters
Read More

CP1513: Inconsistencies in BSCP601, CoP3 and CoP5

Updates removing inconsistencies within and between BSCP601, CoP3 and CoP5
Read More

CP1512: Improving the format of BSCP11 forms

Improving the format of BSCP11 forms
Read More

CP1511: Configurable Items

Clarification of BSCP40 definitions and processes
Read More

CP1510: Allow the online management of registrations, Market Entry and Market Exit

Allow the online management of registrations, Market Entry and Market Exit
Read More

CP1509: Amend BSCP503 to add new recipients of the D0355 data flow

Amend BSCP503 to add new recipients of the D0355 data flow
Read More

CP1508: Updating standards in the CoPs and BSCP601

Updating references to the British and International Standards within the relevant Code Subsidiary Documents.
Read More

CP1507: Updates to BSCP520 to align with working practices

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1506: New Interconnector fuel type

New Interconnector fuel type
Read More

CP1505: Off site Commissioning of current transformers

Allowing ‘off site’ Commissioning of current transformers preinstalled in cut outs or switchgear at manufacture for use in low voltage (LV) installations
Read More

CP1504: amend BSCP201’s references to dual/single pricing

Amend BSCP201’s references to dual/single pricing following implementation of P305
Read More

CP1503: Changes to European Transparency Regulation data

Changes to European Transparency Regulation data to align with latest ENTSO-e Manual of Procedures
Read More

CP1502

Removal of the requirement to submit sampling data for Profile Classes 5-8 following the implementation of P272
Read More

CP1501

Correction to P302 footnote in BSCP504
Read More

CP1500

Amend the BSCP537 Appendices to add a requirement for Suppliers and MOAs to demonstrate the ability to send and receive Smart Meter Configuration details
Read More

CP1499

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Suppliers on Meter Operation Code of Practice Agreement Accreditation for Meter Operator Agents
Read More

CP1498

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Meter Operator Agents on Meter Operation Code of Practice Agreement Accreditation
Read More

CP1497

Introduction of data flows for Half Hourly Meter Operator Agents to pass on Commissioning information when there is a Change of Agent
Read More

CP1496: Data flows

Introduction of two new dataflows for Commissioning in the Metering System process for LDSOs, Suppliers and MOAs. Use of Data Transfer Network

Read More

CP1495: Rejection response dataflow for a D0170

Introduction of a rejection response dataflow for a D0170 ‘Request for Meter System Related Details’ request from the Meter Operator Agent to the Licensed Distribution System Operator where a D0215 ‘Provision of Site Technical Details’ response is required.
Read More

CP1494

Introduction of an objection window for Housekeeping Change Proposals
Read More

CP1493

Add a form and associated process steps to BSCP15 for registering Non-Standard BM Unit configurations
Read More

CP1492

Causes and treatment of large Line Loss Factors
Read More

CP1491

Lack of clarification surrounding the timeliness of Proving Tests and documentation for CVA MOA in BSCP02
Read More

CP1490

Changes to BSCP27 and Technical Assurance Agent Service Descriptions to remove constraints to service improvement
Read More

CP1489

Amendments to BSCP128 to align with BSCP68 timescales for LLF submissions for BM Units transferring from SMRS to CMRS and vice versa
Read More

CP1488

Align the NETA IDD spreadsheets with the live implementation of the SAA-I014 flow
Read More

CP1487

Remove the exclusion of Change of Measurement Classes in BSCP533 Appendix B
Read More

CP1486

Removing example Advice Notes, Backing Sheets and Confirmation Notices from BSCP301
Read More

CP1485

Validation of power transformer and cable/line loss adjustments
Read More

CP1484

Introduction of Additional SVAA Validation at SVA Run time
Read More

CP1483

Changes to BSCP550 – Shared Metering Arrangements
Read More

CP1482

Upgrade of NHHDA and EAC/AA systems from Oracle 11g to version 12c
Read More

CP1481

Housekeeping Change to BSCP536 following approval of P339
Read More

CP1480

Creation of a new authorisation category for corrections to BOA related data
Read More

CP1479

Updates to the Defined Metering Points in Codes of Practice 1, 2, 3, 5 and 10
Read More

CP1478

Automate the loading of the DF Matrix
Read More

CP1477

Updates to BSCP537 Appendix 1 as a result of P283
Read More

CP1476

Facilitation of Incremental LLFs
Read More

CP1475

Remove obligation to re-date final NHH Meter readings on CoMC
Read More

CP1474

CP1474 proposes to create new Change of Measurement Class processes for smart Meters.

Read More

CP1473

Changes to the Long Term Vacant Entry Criteria
Read More

CP1472

Removal of SVA proving tests for Meters with a pulse multiplier of one
Read More

CP1471

Alignment of the CRA URS to the NETA IDD
Read More

CP1470

Housekeeping Change to CoPs 1, 2, 3 and 5 following P266
Read More

CP1469

Changes to support the implementation of the SRAG’s recommendations
Read More

CP1468

Adoption of a standard template for raising Modifications
Read More

CP1467

Inclusion of site ID data within the BSCP11/07 'TDC Trading Dispute Findings' form
Read More

CP1466

Removing SMETS compliant Meters from the scope of BSCP601
Read More

CP1465

Sending revised MTDs following a change of NHHMOA
Read More

CP1464

Requiring HH consumption data to be processed to appropriate precision
Read More

CP1463

Process for Elexon to calculate category 1 non-compliance materiality
Read More

CP1462

Allow the CDCA to break and remake Metering Equipment seals to access local interrogation port
Read More

CP1461

Amending BSCP128 to reflect a new simple SVA file format for LDSO LLF submissions
Read More

CP1460

Timely inclusion of SBR Actions into imbalance cashout
Read More

CP1459

Amendments to the process for performing a Post-Final Settlement Run
Read More

CP1458

Introduction of timescales for the P283 Commissioning process for SVA CT operated Metering Systems
Read More

CP1457

Changes to BSCP520 to support the introduction of Generic LED Charge Codes
Read More

CP1456

Clarification to BSCP514 regarding the sending of Meter Technical Details on receipt of a D0170 data flow
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training videos and services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or