List of all BSC Change Proposals

These pages list all Change Proposals (CP) issued since 2001. These are detailed proposals which are raised to amend CSDs and/or BSC Systems, but would not alter the BSC. They must have a clear aim, a single defined solution and contain the relevant redlined documentation changes.

(Showing items 1-100 of 1076)

Show 10 | 20 | 50 | 100 | All

CP1593 ‘New Interconnector Fuel Type Category: Greenlink’

Changes are needed to the Insights Solution to ensure data relating to the new Greenlink Interconnector is provided to market participants alongside existing data relating to Settlement arrangements in the Great Britain (GB) electricity market.

Read More

CP1592 ‘Upgrade of NHHDA and EAC/AA systems from Oracle 12c to version 19.21’

Upgrade NHHDA and EAC/AA systems to the latest available version of Oracle 19.21. 

Read More

CP1591 ‘New Site Visit Check Code Valid Set value’

The implementation of Distribution Connection and Use of System Agreement (DCUSA) Modification DCP411 ‘Charging De-energised sites’ involves updating the J0024 data set by adding a new Enumeration Value.

Read More

CP1590 ‘Enabling use of DTN agent appointments process for P434’

Enabling suppliers who may be considering the use of DTN derived Dataflows to meet the requirements to migrate their Unmetered Supply (UMS) portfolios over the 12 months up to the UMS mandate go live date.

Read More

CP1589 ‘Create Additional Market Participant Role Codes’

Market Participant Role Code’ is a single character alphanumeric value which is used as a unique identifier for certain Market Roles. There are 36 possible Role Codes to be allocated to different Market Participant Roles, which are defined in the Market Domain Data (MDD). In order for new Market Roles to be created in the future, a change to the format of the ‘Market Participant Role Code’ Data Item is required to increase the number of available Role Codes. Moving to a two-character alphanumeric value would provide hundreds of new potential Market Participant Role Codes.

Read More

CP1588 ‘Mandating Calibration Checks for Main and Check Meters’

This CP proposes to provide an assurance process to confirm whether a Meter Type is still operating within the allowed accuracy limits or is drifting towards, or beyond, the extreme end of the limits. It will also define the steps to be taken where an issue is identified mitigating the risk to Settlement. CP1588 originates from Issue 93 ‘Review of the BSC Metering Codes of Practice’. 

Read More

CP1587 ‘Obsolete Metering Equipment’

Providing a process and transition period to remove unsupported assets and mitigate the risk to Settlement. 

Read More

CP1586 ‘Defining the requirements for Minimum Burden and CT ratios’

In some cases, the Current Transformer (CT) ratios for the maximum current of the circuit is not appropriately selected, even though these ratios are vital for accurate energy settlement as they ensure safe and precise current conversion, maintain metering equipment within its optimal operating range, and uphold regulatory compliance standards. CP1586 originates from Issue 93 ‘Review of the BSC Metering Codes of Practice’.

Read More

CP1585 ‘Submission of Half Hourly data for Embedded LDSO sites to Host LDSO’

This CP proposes that the Half Hourly Data Collector send Half Hourly data for Embedded LDSO connected sites to the Host LDSO via D0275 and/or D0036 to improve the quality of forecasting and reduce manual effort. 

Read More

CP1584 ‘Allow non-BSC Parties to raise Change Proposals, add a CP withdrawal process and remove BCA/PACA concept’

BSC Issue 102 ‘BSC Change Process Review’ identified several improvements to align and simplify BSC Change processes on solution ownership and recommended Elexon make changes to several current processes described within BSC Procedure (BSCP) BSCP40 “Change Management”.

Read More

CP1583 ‘Rationalising publication of European Transparency Regulation (ETR) data on Elexon Systems’

The ETR data published on the Balancing Mechanism Reporting Service (BMRS) was intended to provide additional insights to the market with approximately 40 reports currently available. This CP identifies several of these reports which are believed to be of minimal  value to Elexon’s customers as the data is duplicated in other reports, has had no data reported, or has been superseded by subsequent regulatory changes.

Read More

CP1582 ‘Update BSCP520 on Change of Measurement Class to ensure the UMSO send a D0388 with a zero charge code’

CP1582 was originally raised as a housekeeping Change Proposal (CP) to update BSCP520 ‘Unmetered Supplies Registered in SMRS’ step 3.6.2.3, as introduced erroneously by P434 ‘Half Hourly Settlement for UMS Metering Systems’], states “UMSO confirms the de-energisation date to Supplier, NHHDC and MA”’ as Non Half Hourly (NHH) Unmetered Supply (UMS) sites don’t have a Meter Administrator (MA).

Following an objection to the CP as housekeeping, and subsequent consultation period, CP1582 has been expanded to provide greater clarity and alignment with industry process for BSCP520 where a Change of Measurement Class (CoMC) event has occurred.

Read More

CP1581 ‘Recommendation to update BSCP18 following Issue 105’

The Issue 105 ‘Further considerations following implementation of BSC Modification P448′ Workgroup has recommended a number of improvements to BSC Procedure (BSCP) 18 ‘Corrections to Bid-Offer Acceptance Related Data’.

Read More

CP1580 ‘Making the Code Subsidiary Documents (CSDs) gender neutral and Housekeeping’

CP1580 seeks to make the Code Subsidiary Documents (CSD) gender-neutral in line with the Balancing and Settlement Code (BSC) and present day legal drafting and to correct BSCP602 with a housekeeping change.

Read More

CP1579 ‘Allowing HHDCs to undergo Protocol Approval before completing Qualification’

This Change Proposal will allow Half Hourly Data Collectors (HHDCs) and Asset Metering Half Hourly Data Collectors (AMHHDCs) to undergo Protocol Approval before or during the Qualification process.

Read More

CP1578 ‘Enabling Embedded LDSOs to submit Site Specific LLFs’

This CP proposes updates to remove issues that may stop Embedded LDSOs from submitting Site Specific LLFs. These updates will define the process for submitting Site Specific LLFs, including establishing deadlines and requirements for the Embedded and Host LDSOs.

Read More

CP1577 ‘To clarify the sending of a D0151 is required for all COS NHH loss processes’

BSCP504 requires the outgoing supplier to send a D0151 to terminate their NHHDC appointment on Change of Supply. The positioning of clause 3.2.6.4(a) implies this is only required for non DCC serviced metering systems, whereas this should be a requirement for all metering systems. This CP amend BSCP504 to clarify that 3.2.6.4(a) applies to all Metering Systems.

Read More

CP1576 ‘New Interconnector Fuel Type Category: Viking Link’

Changes are needed to the Balancing Mechanism Reporting Service (BMRS) to ensure data relating to the new Viking Link Interconnector is provided to market participants alongside existing data relating to Settlement arrangements in the Great Britain (GB) electricity market.

Read More

CP1575 ‘Permitting the use of busbar voltage transformers within metering Codes of Practice 1 and 2’

This CP seeks to implement the recommendation from the Issue 87 ‘Busbar voltage transformer (VT) metering for Offshore wind farms under OFTO arrangements’ Workgroup by updating Code of Practice 1 and Code of Practice 2 to allow busbar VTs to be used at Offshore and onshore wind farms. 

Read More

CP1574 ‘Improving the use of the D0215 data flow in the relevant industry processes’

This CP seeks to implement the recommendation from the Issue 99 Workgroup, which involves updating Balancing and Settlement Code Procedure (BSCP) 515 ‘Licensed Distribution’ and the Retail Energy Code (REC) Meter Operator Schedule 14 documents to streamline the use of the D0215 flow in its associated processes.

Read More

CP1573 ‘Amendments to the IDD Pt 1 Spreadsheet, SVA DC and REC EMAR Data Specification for P376’

This Change Proposal seeks to amend the IDD Part 1 Spreadsheet, SVA Data Catalogue Volume 2 and the Retail Energy Code’s’ EMAR Data Specification to ensure that the BSC Configurable Items accurately reflect the P376 solution.

Read More

CP1572 ‘Specifying the requirements to provide SLDs for HV and EHV sites’

Currently there is no requirement in the BSC to produce SLDs despite a number of BSC processes requiring one to be submitted. Without the requirement to produce SLDs being specified, some Parties have not felt incentivised to create them.

Read More

CP1571 ‘Clarify the number of Meter measuring elements and measurement transformers’

The Metering Codes of Practice (CoPs) specify the number of measuring elements required to be metered in relation to the number of primary system conductors. However, the requirements don’t appear to be sufficiently clear or are not being complied with.

Read More

CP1570 ‘Housekeeping amendments to include reference to ‘Asset Metering Virtual Lead Party’’

CP1570 is a Housekeeping change seeking to correct minor errors identified during the preparation for implementation of Approved Modification P375 ‘Settlement of Secondary Balancing Mechanism (BM) Units using metering behind the site Boundary Point’ as part of the June 2022 BSC Release.

Read More

CP1569 ‘Amendments to the IDD documentation to align with SAA migration’

This Change Proposal will seek to amend the IDD documentation to reflect SAA no longer having access to a shared database with CRA and CDCA plus will document the interface ‘BM Unit Period Metered Volume’.

Read More

CP1568 ‘Inclusion of new LDSO-mastered SMRS data items’

This Change Proposal will include new LDSO-mastered SMRS data items in the SVA Data Catalogue, the REC EMAR Data Specification and BSCP604. 

Read More

CP1567 ‘New BSC Procedure (BSCP) for Assurance Information Requests (AIRs)’

The AIR is a Performance Assurance Technique (PAT) which was introduced in May 2022. Currently there is no related BSCP for an AIR, therefore when issuing an AIR, there is no written obligation on Parties to adhere to the request.

Read More

CP1566 ‘Introducing the CVA Commissioning End to End Check (CEEC) process’

CP1566 seeks to formalise the Central Volume Allocation (CVA) Commissioning End to End Check (CEEC) process in BSCP02, BSCP20, BSCP38, CoP4 and CDCA Service Description for new and existing CVA Metering Systems.

Read More

CP1565 ‘Updates to address Central Management System issues’

This CP seeks to update BSCP520 to contain clearly outlined processes for approval and fault reporting of Central Management Systems.

Read More

CP1564 ‘Amendments to the approved IDD spreadsheets for P399’

CP1564 is a Housekeeping change seeking to update the the New Electricity Trading Arrangements (NETA) Interface Definition Documents Part 1 and 2 that were approved under P399 ‘Making the identity of Balancing Service providers visible in the Balancing Services Adjustment Data’  to correct a defect impacting sub-flows 3 & 4 of the SAA-I014 Settlement Reports.

Read More

CP1563 ‘Altering the Trigger Point and subsequent Timescales for Commissioning SVA CT Operated Metering Systems and issue of Data Flow’

CP1563 seeks to update some of the trigger points for Current Transformer (CT) Commissioning and subsequent sending of data flows as the Proposer considers that they are not appropriate for CT operated metering systems of all types.

Read More

CP1562 ‘Amendments to the approved IDD changes for P375’

CP1562 seeks to update the New Electricity Trading Arrangement (NETA) Interface Definition Documents(IDD) Part 1 and 2 that were approved under P375, to provide clarity to the relevant Parties that make use of the document.

Read More

CP1561 ‘Updating SVA DC Volume 1 and 2 for CP1546’

CP1561 looks to update the Supplier Volume Allocation (SVA) Catalogue Volume 1 and 2 to include the approved data flows and data items from CP1546.

Read More

CP1560 ‘Demand Control Event Process Clarifications’

This CP seeks to clarify the processes that take place after a Demand Control Event by amending the relevant Code Subsidiary Documents to ensure clarity and consistency. 

Read More

CP1559 ‘Complex Sites Process Improvements’

This Change Proposal will deliver improvements to the Complex Sites process.

Read More

CP1558 ‘New Registration data items to facilitate MHHS’

This Change Proposal will introduce new Registration Service data items and supporting BSC processes into existing Supplier Meter Registration Service (SMRS) systems. 

Read More

CP1557: Housekeeping change to update CP1532 solution

CP1557 makes non-material changes to update the CP1532 solution to reflect changes made to BSCP502 ‘Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’ following the implementation of P420.

Read More

CP1556 ‘Improving the CVA Qualification Testing experience for VLPs and AMVLPs’

CP1556 looks to update BSCP70 ‘CVA Qualification Testing for Parties and Party Agents’ and the Communication Requirements Document to include a test request process and a list of P-flows for VLPs and AMVLPs.

Read More

CP1555 ‘Consumption data for Measurement Classes G and F’

This CP proposes to update the requirements in BSCP502 to require HHDCs to send D0036 or D0275 for non-Data Communications Company (DCC) enrolled Metering Systems and/or D0380 for DCC enrolled Metering Systems to Licenced Distribution System Operators (LDSOs).

Read More

CP1554 ‘Future proofing the measurement transformer standards’

CP1554 looks to future proof the  measurement transformer standards in Code of Practices 1, 2, 3, 4, 5 and 10

Read More

CP1553: Meters and Current Transformers minimum accuracy classes

This Change proposal looks to tighten the requirements for Meters and Current Transformers in the Code of Practice.

Read More

CP1552 ‘Reflecting BSCP501 timeframes in BSCP520 processes’

CP1552 seeks to provide clarity to market participants about the timeframes for various processes in BSCP520 ‘Unmetered Supplies Registered in SMRS’. 

Read More

CP1551 ‘Measuring Instruments Regulations – updates to BSCP601’

CP1551 seeks to update BSCP601 ‘Metering Protocol Approval and Compliance Testing’ so it aligns with new Government legislation for new Meters being placed on the GB market.

Read More

CP1550: Updates to monitoring of voltage failure alarms requirements

This Change Proposal looks to simplify the management of phase failures and update the requirements of voltage failure alarms.

Read More

CP1549 ‘Amendment of BSCP516 to clarify the criteria for Non-Domestic SVA Metering Systems’

CP1549 seeks to remove the text from BSCP516 ‘Allocation of Profile Classes and SSC’s for Non Half Hourly SVA Metering Systems Registered in SMRS’ that suggests a Change of Measurement Class from HH to NHH Profile Classes 3 or 4 is not possible so that it aligns with the correct interpretation of the rules set out in the BSC.

Read More

CP1548 ‘Remove constraint requiring BMRS to publish data files in a specific CSV format and structure’

This change proposal, CP1548, seeks to remove the specification of particular download formats in NETA IDD Part 1 Document paragraph 4.13 and be housed and maintained in the BMRS API and Data Push User Guide

Read More

CP1547 ‘Clarification on Site Specific LLF Calculation Process for Embedded LDSOs’

CP1547 seeks to provide clarity for Embedded LDSOs that choose to calculate Site Specific Line Loss Factors rather than Mirroring, through updates to BSCP128. 

Read More

CP1546 ‘Introducing DTC flows to transfer UMS Summary Inventories and Control files’

Read More

CP1545 ‘Introducing Technical Assurance of Metering (TAM) Central Volume Allocation (CVA) Specific Sample audits’

Read More

CP1544 ‘BSCCo Approved EFR Representative sign-off required for any EFR plan following escalation’

Read More

CP1543 ‘Use of DTC dataflow D0051 in the Half Hourly sector’

Read More

CP1542 ‘Transfer the obligation to visit de-energised sites annually from Data Collector to Supplier’

Read More

CP1541 ‘Use of D0004 in BSCP502’

Read More

CP1540 ‘Strengthening the Qualification – Change of Ownership Process’

Strengthening the Qualification - Change of Ownership Process
Read More

CP1539 ‘Inclusion of LCCC as an Affected party in Metering Dispensation applications’

Read More

CP1538 Correct Specification of TERRE Tibco messages

The Assessment Report for CP1538 was presented to the  ISG on 2 February 2021, where it was approved for implementation in the April 2021 ad-hoc BSC release

Read More

CP1537 ‘Extending the Timescales for agreeing Technical Assurance of Performance Assurance Parties (TAPAP) Findings Reports’

Read More

CP1536 ‘Use of DTC data flow D0379 for submission of unmetered Half Hourly data’

Read More

CP1535 ‘Interconnector Fuel Type Category update to BMRS’

CP1535 seeks to Add the North Sea Link (NSL) Interconnector to the BMRS. CP1535 will also enable the withdrawal of the CP1516 interim solution to incorporate data from IFA2 and ElecLink Interconnectors on the BMRS.

Read More

CP1534 ‘Introduce Change of Supplier (CoS) – No Meter Process’

Read More

CP1533 ‘Mandatory Sending of D0052 for DCC serviced SVA NHH Metering Systems’

CP1533 intends to update clause 3.2.6.50 in BSCP504 to remove instances of the word “new” in order to make it clear that D0052s shall be sent in all instances.

Read More

CP1532 ‘Reduce Half Hourly Change of Supplier timelines to meet the Initial Settlement Run’

Read More

CP1531 ‘Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run’

Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run

Read More

CP1530 ‘Introduction of a formalised process for the validation of measurement transformer ratios by Elexon’

Read More

CP1529 ‘Earlier initiation of Supplier Agreed Meter Readings process’

Earlier initiation of Supplier Agreed Meter Readings process
Read More

CP1528 ‘CoP4 clarification of BSC Party responsibility for Commissioning of measurement transformers that the BSC Party adopts’

‘CoP4 clarification of BSC Party responsibility for Commissioning of measurement transformers that the BSC Party adopts’
Read More

CP1527 ‘Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’

'Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’
Read More

CP1526 ‘Introduction of Service Level Agreements for rectifying Meter faults’

CP1526 seeks to introduce formal Service Level Agreements that should be adhered to by Meter Operator Agents (MOAs) and Licensed Distribution System Operators (LDSOs) when rectifying Half Hourly Meter faults to ensure continued overall accountability of rectifying faults on Metering Equipment.

Read More

CP1525 ‘Improving the involvement of the LDSO in the fault resolution process’

CP1525 seeks to define a new process that would place obligations on Licensed Distribution System Operators (LDSOs) to rectify Half Hourly Meter faults where the fault is with Metering Equipment owned by the LDSO.

Read More

CP1524 ‘Improving the communication methods in the fault rectification process’

CP1524 seeks to implement changes to the communication process used by parties involved in rectifying faults on Half Hourly Metering Equipment.

Read More

CP1523 ‘D0312 Process Alignment’

BSCP501 Amendments to clarify the D0312 process
Read More

CP1522 ‘Updates to BSCP520 to align with working practices and UMSUG recommendations’

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1521 ‘BSCP70 Amendments for IA and IEA’

This Change Proposal seeks to amend BSCP70 to remove the statement excluding  Interconnector Administrator (IA) and Interconnector Error Administrator (IEA) roles from the requirement to undergo CVA Qualification Testing.

Read More

CP1520 Clarification to ‘Change of Ownership’ process in BSCP537

Clarification to 'Change of Ownership' process in BSCP537
Read More

CP1519 ‘Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations’

Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations
Read More

CP1518: Housekeeping change to address errors in the approved changes to BSCP514 for CP1515

Housekeeping change to address errors in the approved changes to BSCP514 for CP1515
Read More

CP1517: Changes to BSC Configurable Items for the TERRE Final Implementation Date

Changes to BSC Configurable Items for the TERRE Final Implementation Date
Read More

CP1516: New Interconnector Fuel Type Categories: ElecLink & IFA2

New Interconnector Fuel Type Categories: ElecLink & IFA2
Read More

CP1515: Faster Switching

Meter Operator Agents to send Metering System Data to SMRS instead of ECOES for the Faster Switching Programme
Read More

CP1514: Number of register digits for smart Meters

Number of register digits for smart Meters
Read More

CP1513: Inconsistencies in BSCP601, CoP3 and CoP5

Updates removing inconsistencies within and between BSCP601, CoP3 and CoP5
Read More

CP1512: Improving the format of BSCP11 forms

Improving the format of BSCP11 forms
Read More

CP1511: Configurable Items

Clarification of BSCP40 definitions and processes
Read More

CP1510: Allow the online management of registrations, Market Entry and Market Exit

Allow the online management of registrations, Market Entry and Market Exit
Read More

CP1509: Amend BSCP503 to add new recipients of the D0355 data flow

Amend BSCP503 to add new recipients of the D0355 data flow
Read More

CP1508: Updating standards in the CoPs and BSCP601

Updating references to the British and International Standards within the relevant Code Subsidiary Documents.
Read More

CP1507: Updates to BSCP520 to align with working practices

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1506: New Interconnector fuel type

New Interconnector fuel type
Read More

CP1505: Off site Commissioning of current transformers

Allowing ‘off site’ Commissioning of current transformers preinstalled in cut outs or switchgear at manufacture for use in low voltage (LV) installations
Read More

CP1504: amend BSCP201’s references to dual/single pricing

Amend BSCP201’s references to dual/single pricing following implementation of P305
Read More

CP1503: Changes to European Transparency Regulation data

Changes to European Transparency Regulation data to align with latest ENTSO-e Manual of Procedures
Read More

CP1502: Removal of Profile Classes 5-8 sampling data requirement

Removal of the requirement to submit sampling data for Profile Classes 5-8 following the implementation of P272
Read More

CP1501: Clarification of change of Supplier process

Correction to P302 footnote in BSCP504
Read More

CP1500: SVA Qualification requirement for Smart Meter Configuration

Amend the BSCP537 Appendices to add a requirement for Suppliers and MOAs to demonstrate the ability to send and receive Smart Meter Configuration details
Read More

CP1499: SVA Qualification Self-Assessment for Suppliers

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Suppliers on Meter Operation Code of Practice Agreement Accreditation for Meter Operator Agents
Read More

CP1498: SVA Qualification Self-Assessment for MOAs

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Meter Operator Agents on Meter Operation Code of Practice Agreement Accreditation
Read More

CP1497: Commissioning information data flows for HHMOAs

Introduction of data flows for Half Hourly Meter Operator Agents to pass on Commissioning information when there is a Change of Agent
Read More

CP1496: Data flows

Introduction of two new dataflows for Commissioning in the Metering System process for LDSOs, Suppliers and MOAs. Use of Data Transfer Network

Read More

CP1495: Rejection response dataflow for a D0170

Introduction of a rejection response dataflow for a D0170 ‘Request for Meter System Related Details’ request from the Meter Operator Agent to the Licensed Distribution System Operator where a D0215 ‘Provision of Site Technical Details’ response is required.
Read More

CP1494 – Introduction of an objection window for Housekeeping Change Proposals

Introduction of an objection window for Housekeeping Change Proposals
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.