CP1507

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1506

New Interconnector fuel type
Read More

CP1505

Allowing ‘off site’ Commissioning of current transformers preinstalled in cut outs or switchgear at manufacture for use in low voltage (LV) installations
Read More

CP1504

Amend BSCP201’s references to dual/single pricing following implementation of P305
Read More

CP1503

Changes to European Transparency Regulation data to align with latest ENTSO-e Manual of Procedures
Read More

CP1502

Removal of the requirement to submit sampling data for Profile Classes 5-8 following the implementation of P272
Read More

CP1501

Correction to P302 footnote in BSCP504
Read More

CP1500

Amend the BSCP537 Appendices to add a requirement for Suppliers and MOAs to demonstrate the ability to send and receive Smart Meter Configuration details
Read More

CP1499

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Suppliers on Meter Operation Code of Practice Agreement Accreditation for Meter Operator Agents
Read More

CP1498

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Meter Operator Agents on Meter Operation Code of Practice Agreement Accreditation
Read More

CP1497

Introduction of data flows for Half Hourly Meter Operator Agents to pass on Commissioning information when there is a Change of Agent
Read More

CP1496

Introduction of two data flows for the Commissioning process for Half Hourly (HH) Supplier Volume Allocation (SVA) Current Transformer (CT) operated Metering Systems
Read More

CP1495

Introduction of a rejection response dataflow for a D0170 ‘Request for Meter System Related Details’ request from the Meter Operator Agent to the Licensed Distribution System Operator where a D0215 ‘Provision of Site Technical Details’ response is required.
Read More

CP1494

Introduction of an objection window for Housekeeping Change Proposals
Read More

CP1493

Add a form and associated process steps to BSCP15 for registering Non-Standard BM Unit configurations
Read More

CP1492

Causes and treatment of large Line Loss Factors
Read More

CP1491

Lack of clarification surrounding the timeliness of Proving Tests and documentation for CVA MOA in BSCP02
Read More

CP1490

Changes to BSCP27 and Technical Assurance Agent Service Descriptions to remove constraints to service improvement
Read More

CP1489

Amendments to BSCP128 to align with BSCP68 timescales for LLF submissions for BM Units transferring from SMRS to CMRS and vice versa
Read More

CP1488

Align the NETA IDD spreadsheets with the live implementation of the SAA-I014 flow
Read More

CP1487

Remove the exclusion of Change of Measurement Classes in BSCP533 Appendix B
Read More

CP1486

Removing example Advice Notes, Backing Sheets and Confirmation Notices from BSCP301
Read More

CP1485

Validation of power transformer and cable/line loss adjustments
Read More

CP1484

Introduction of Additional SVAA Validation at SVA Run time
Read More

CP1483

Changes to BSCP550 – Shared Metering Arrangements
Read More

CP1482

Upgrade of NHHDA and EAC/AA systems from Oracle 11g to version 12c
Read More

CP1481

Housekeeping Change to BSCP536 following approval of P339
Read More

CP1480

Creation of a new authorisation category for corrections to BOA related data
Read More

CP1479

Updates to the Defined Metering Points in Codes of Practice 1, 2, 3, 5 and 10
Read More

CP1478

Automate the loading of the DF Matrix
Read More

CP1477

Updates to BSCP537 Appendix 1 as a result of P283
Read More

CP1476

Facilitation of Incremental LLFs
Read More

CP1475

Remove obligation to re-date final NHH Meter readings on CoMC
Read More

CP1474

Updating the CoMC processes to facilitate the elective HH Settlement of SMETS Meters
Read More

CP1473

Changes to the Long Term Vacant Entry Criteria
Read More

CP1472

Removal of SVA proving tests for Meters with a pulse multiplier of one
Read More

CP1471

Alignment of the CRA URS to the NETA IDD
Read More

CP1470

Housekeeping Change to CoPs 1, 2, 3 and 5 following P266
Read More

CP1469

Changes to support the implementation of the SRAG’s recommendations
Read More

CP1468

Adoption of a standard template for raising Modifications
Read More

CP1467

Inclusion of site ID data within the BSCP11/07 'TDC Trading Dispute Findings' form
Read More

CP1466

Removing SMETS compliant Meters from the scope of BSCP601
Read More

CP1465

Sending revised MTDs following a change of NHHMOA
Read More

CP1464

Requiring HH consumption data to be processed to appropriate precision
Read More

CP1463

Process for ELEXON to calculate category 1 non-compliance materiality
Read More

CP1462

Allow the CDCA to break and remake Metering Equipment seals to access local interrogation port
Read More

CP1461

Amending BSCP128 to reflect a new simple SVA file format for LDSO LLF submissions
Read More

CP1460

Timely inclusion of SBR Actions into imbalance cashout
Read More

CP1459

Amendments to the process for performing a Post-Final Settlement Run
Read More

CP1458

Introduction of timescales for the P283 Commissioning process for SVA CT operated Metering Systems
Read More

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

Big Six suffer in supplier rhyme time

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or