CP1500: SVA Qualification requirement for Smart Meter Configuration
Amend the BSCP537 Appendices to add a requirement for Suppliers and MOAs to demonstrate the ability to send and receive Smart Meter Configuration details
CP1499: SVA Qualification Self-Assessment for Suppliers
Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Suppliers on Meter Operation Code of Practice Agreement Accreditation for Meter Operator Agents
CP1498: SVA Qualification Self-Assessment for MOAs
Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Meter Operator Agents on Meter Operation Code of Practice Agreement Accreditation
CP1497: Commissioning information data flows for HHMOAs
Introduction of data flows for Half Hourly Meter Operator Agents to pass on Commissioning information when there is a Change of Agent
CP1496: Data flows
Introduction of two new dataflows for Commissioning in the Metering System process for LDSOs, Suppliers and MOAs. Use of Data Transfer Network
CP1495: Rejection response dataflow for a D0170
Introduction of a rejection response dataflow for a D0170 ‘Request for Meter System Related Details’ request from the Meter Operator Agent to the Licensed Distribution System Operator where a D0215 ‘Provision of Site Technical Details’ response is required.
CP1494 – Introduction of an objection window for Housekeeping Change Proposals
Introduction of an objection window for Housekeeping Change Proposals
CP1493 – Add a form and associated process steps to BSCP15 for registering Non-Standard BM Unit configurations
Add a form and associated process steps to BSCP15 for registering Non-Standard BM Unit configurations
CP1492 – Causes and treatment of large Line Loss Factors
Causes and treatment of large Line Loss Factors
CP1491 – Lack of clarification surrounding the timeliness of Proving Tests and documentation for CVA MOA in BSCP02
Lack of clarification surrounding the timeliness of Proving Tests and documentation for CVA MOA in BSCP02
CP1490 – Changes to BSCP27 and Technical Assurance Agent Service Descriptions to remove constraints to service improvement
Changes to BSCP27 and Technical Assurance Agent Service Descriptions to remove constraints to service improvement
CP1489 – Amendments to BSCP128 to align with BSCP68 timescales for LLF submissions for BM Units transferring from SMRS to CMRS and vice versa
Amendments to BSCP128 to align with BSCP68 timescales for LLF submissions for BM Units transferring from SMRS to CMRS and vice versa
CP1488 – Align the NETA IDD spreadsheets with the live implementation of the SAA-I014 flow
Align the NETA IDD spreadsheets with the live implementation of the SAA-I014 flow
CP1487 – Remove the exclusion of Change of Measurement Classes in BSCP533 Appendix B
Remove the exclusion of Change of Measurement Classes in BSCP533 Appendix B
CP1486 – Removing example Advice Notes, Backing Sheets and Confirmation Notices from BSCP301
Removing example Advice Notes, Backing Sheets and Confirmation Notices from BSCP301
CP1485 – Validation of power transformer and cable/line loss adjustments
Validation of power transformer and cable/line loss adjustments
CP1484 – Introduction of Additional SVAA Validation at SVA Run time
Introduction of Additional SVAA Validation at SVA Run time
CP1483 – Changes to BSCP550 – Shared Metering Arrangements
Changes to BSCP550 – Shared Metering Arrangements
CP1482 – Upgrade of NHHDA and EAC/AA systems from Oracle 11g to version 12c
Upgrade of NHHDA and EAC/AA systems from Oracle 11g to version 12c
CP1481 – Housekeeping Change to BSCP536 following approval of P339
Housekeeping Change to BSCP536 following approval of P339
CP1480 – Creation of a new authorisation category for corrections to BOA related data
Creation of a new authorisation category for corrections to BOA related data
CP1479 – Updates to the Defined Metering Points in Codes of Practice 1, 2, 3, 5 and 10
Updates to the Defined Metering Points in Codes of Practice 1, 2, 3, 5 and 10
CP1478 – Automate the loading of the DF Matrix
Automate the loading of the DF Matrix
CP1477 – Updates to BSCP537 Appendix 1 as a result of P283
Updates to BSCP537 Appendix 1 as a result of P283
CP1476 – Facilitation of Incremental LLFs
Facilitation of Incremental LLFs
CP1475 – Remove obligation to re-date final NHH Meter readings on CoMC
Remove obligation to re-date final NHH Meter readings on CoMC
CP1474 – Updating the CoMC processes to facilitate the elective HH Settlement of SMETS Meters
CP1474 proposes to create new Change of Measurement Class processes for smart Meters.
CP1473 – Changes to the Long Term Vacant Entry Criteria
Changes to the Long Term Vacant Entry Criteria
CP1472 – Removal of SVA proving tests for Meters with a pulse multiplier of one
Removal of SVA proving tests for Meters with a pulse multiplier of one
CP1471 – Alignment of the CRA URS to the NETA IDD
Alignment of the CRA URS to the NETA IDD
CP1470 – Housekeeping Change to CoPs 1, 2, 3 and 5 following P266
Housekeeping Change to CoPs 1, 2, 3 and 5 following P266
CP1469 – Changes to support the implementation of the SRAG’s recommendations
Changes to support the implementation of the SRAG’s recommendations
CP1468 – Adoption of a standard template for raising Modifications
Adoption of a standard template for raising Modifications
CP1467 – Inclusion of site ID data within the BSCP11/07 ‘TDC Trading Dispute Findings’ form
Inclusion of site ID data within the BSCP11/07 'TDC Trading Dispute Findings' form
CP1466 – Removing SMETS compliant Meters from the scope of BSCP601
Removing SMETS compliant Meters from the scope of BSCP601
CP1465 – Sending revised MTDs following a change of NHHMOA
Sending revised MTDs following a change of NHHMOA
CP1464 – Requiring HH consumption data to be processed to appropriate precision
Requiring HH consumption data to be processed to appropriate precision
CP1463 – Process for Elexon to calculate category 1 non-compliance materiality
Process for Elexon to calculate category 1 non-compliance materiality
CP1462 – Allow the CDCA to break and remake Metering Equipment seals to access local interrogation port
Allow the CDCA to break and remake Metering Equipment seals to access local interrogation port
CP1461 – Amending BSCP128 to reflect a new simple SVA file format for LDSO LLF submissions
Amending BSCP128 to reflect a new simple SVA file format for LDSO LLF submissions
CP1460 – Timely inclusion of SBR Actions into imbalance cashout
Timely inclusion of SBR Actions into imbalance cashout
CP1459 – Amendments to the process for performing a Post-Final Settlement Run
Amendments to the process for performing a Post-Final Settlement Run
CP1458 – Introduction of timescales for the P283 Commissioning process for SVA CT operated Metering Systems
Introduction of timescales for the P283 Commissioning process for SVA CT operated Metering Systems
CP1457 – Changes to BSCP520 to support the introduction of Generic LED Charge Codes
Changes to BSCP520 to support the introduction of Generic LED Charge Codes
CP1456 – Clarification to BSCP514 regarding the sending of Meter Technical Details on receipt of a D0170 data flow
Clarification to BSCP514 regarding the sending of Meter Technical Details on receipt of a D0170 data flow
CP1455 – Sending revised Meter Technical Details following a change of Meter Operator Agent
Sending revised Meter Technical Details following a change of Meter Operator Agent
CP1454 – Amendment to the Category 1 Materiality Calculation
Amendment to the Category 1 Materiality Calculation
CP1453 – Changes to SAA Service Description and SAA URS for P269 systems fix
Changes to SAA Service Description and SAA URS for P269 systems fix
CP1452 – Aligning BSCP502 with amendments to the Electricity Supply Licence
Aligning BSCP502 with amendments to the Electricity Supply Licence
CP1451 – Allowing HH Default EACs for all HH Measurement Classes
Allowing HH Default EACs for all HH Measurement Classes
CP1450 – Security Requirements for CoP10 Metering Equipment
Security Requirements for CoP10 Metering Equipment
CP1449 – Updates to BSCP520 and the SVA Data Catalogue following a review
Updates to BSCP520 and the SVA Data Catalogue following a review
CP1448 – Changes to allowable software for Method 3 Proving Tests
Changes to allowable software for Method 3 Proving Tests
CP1447 – Amendment to the timescales for sending the D0010 from Supplier to NHHDC on a Smart Change of Supply event
Amendment to the timescales for sending the D0010 from Supplier to NHHDC on a Smart Change of Supply event
CP1446 – Allow smart CoS agreed Disputed Reads to be entered into Settlement
Allow smart CoS agreed Disputed Reads to be entered into Settlement
CP1445 – BSCP516 alignment with revised P272 Implementation Date
BSCP516 alignment with revised P272 Implementation Date
CP1444 – Extend the timescale of CoP10 Proving Tests until the implementation of P272
Extend the timescale of CoP10 Proving Tests until the implementation of P272
CP1443 – Standard Settlement Configurations for smart and advanced Meters
Standard Settlement Configurations for smart and advanced Meters
CP1442 – Clarifying the application process for Metering Dispensations
Clarifying the application process for Metering Dispensations
CP1441 – Allowing the Peer Comparison technique to be reported on a Supplier Agent level
Allowing the Peer Comparison technique to be reported on a Supplier Agent level
CP1440 – Exempting Metering Systems in Measurement Class F from proving tests
Exempting Metering Systems in Measurement Class F from proving tests
CP1439 – Proving Test Permissible Software
Proving Test Permissible Software
CP1438 – Clarification of information required for raising a Trading Dispute
Clarification of information required for raising a Trading Dispute
CP1437 – Recommended amendments to BSCP68
Recommended amendments to BSCP68
CP1436 – EAC/AA and NHHDA Applications – Windows Server upgrade
EAC/AA and NHHDA Applications – Windows Server upgrade
CP1435 – Amendments to the SAA-I042 flow
Amendments to the SAA-I042 flow
CP1434 – Amend the three digit numeric Line Loss Factor Class (LLFC) Id to an Alphanumeric LLFC Id
Amend the three digit numeric Line Loss Factor Class (LLFC) Id to an Alphanumeric LLFC Id
CP1433 – Clarification of which Metering Systems are captured by the P272 requirements
Clarification of which Metering Systems are captured by the P272 requirements
CP1432 – HH Default EAC by Measurement Class
HH Default EAC by Measurement Class
CP1431 – Extend Site Check Exemption to Measurement Classes F and G
Extend Site Check Exemption to Measurement Classes F and G
CP1430 – Clarification to the ECVN/MVRN processes
Clarification to the ECVN/MVRN processes
CP1429 – Proving Test timescales
Proving Test timescales
CP1428 – Inclusion of Party Agents in the event of Post Final Settlement Runs
Inclusion of Party Agents in the event of Post Final Settlement Runs
CP1427 – Housekeeping change to BSCP503 for EMR
Housekeeping change to BSCP503 for EMR
CP1426 – Receipt of the D0296 flow at II
Receipt of the D0296 flow at II
CP1425 – Consequential changes to BSCP201 following EMR
Consequential changes to BSCP201 following EMR
CP1424 – Amending the requirement for Data Aggregators to perform annual Full SMRS refreshes
Amending the requirement for Data Aggregators to perform annual Full SMRS refreshes
CP1423 – Amendments to BSCP68 following a review
Amendments to BSCP68 following a review
CP1422 – Add a Defined Metering Point for an Offshore Transmission Connection Point to the HH Codes of Practice
Add a Defined Metering Point for an Offshore Transmission Connection Point to the HH Codes of Practice
CP1421 – Linking BSCP520 obligations to the Operational Information Document
Linking BSCP520 obligations to the Operational Information Document
CP1420 – Allowance of mid-year LLF resubmissions due to material consumption or generation changes
Allowance of mid-year LLF resubmissions due to material consumption or generation changes
CP1419 – Improving data accuracy by enabling the D0312 flow to be sent on a Change of Supplier
Improving data accuracy by enabling the D0312 flow to be sent on a Change of Supplier
CP1418 – Validation of D0041 flows
Validation of D0041 flows
CP1417 – Reading validation for smart Meters
Reading validation for smart Meters
CP1416 – Remotely disabled smart Meters
Remotely disabled smart Meters
CP1415 – Reading submission frequency for smart Meters
Reading submission frequency for smart Meters
CP1414 – Combining LDSO and Embedded LDSOs UMS Inventories on to single LDSO MSID
Combining LDSO and Embedded LDSOs UMS Inventories on to single LDSO MSID
CP1413 – Amendments to BSCP535 ‘Technical Assurance’ following a review
Amendments to BSCP535 ‘Technical Assurance’ following a review
CP1412 – Reporting of deleted BOAs within the SAA-I014 report
Reporting of deleted BOAs within the SAA-I014 report
CP1411 – Remove exemption from Proving Tests for Code of Practice 10 Metering Systems
Remove exemption from Proving Tests for Code of Practice 10 Metering Systems
CP1410 – Transfer of Outstation Level 3 Passwords for advanced Meters
Transfer of Outstation Level 3 Passwords for advanced Meters
CP1409 – Change of Measurement Class process for advanced Meters
Change of Measurement Class process for advanced Meters
CP1408 – Excessively Large EAC/AA Control Points
Excessively Large EAC/AA Control Points
CP1407 – Updates to current LLF audit templates
Updates to current LLF audit templates
CP1406 – Electronic version of the Self Assessment Document
Electronic version of the Self Assessment Document
CP1405 – Facilitating Faster Switching in the NHH Market
Facilitating Faster Switching in the NHH Market
CP1404 – Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points
Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points
CP1403 – Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections
Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections
CP1402 – Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract
Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract
CP1401 – Replace residual negative EACs for pre-RF Settlement Days without affecting post-RF data