List of all BSC Change Proposals

(Showing items 101-200 of 1083)

Show 10 | 20 | 50 | 100 | All

CP1500: SVA Qualification requirement for Smart Meter Configuration

Amend the BSCP537 Appendices to add a requirement for Suppliers and MOAs to demonstrate the ability to send and receive Smart Meter Configuration details
Read More

CP1499: SVA Qualification Self-Assessment for Suppliers

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Suppliers on Meter Operation Code of Practice Agreement Accreditation for Meter Operator Agents
Read More

CP1498: SVA Qualification Self-Assessment for MOAs

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Meter Operator Agents on Meter Operation Code of Practice Agreement Accreditation
Read More

CP1497: Commissioning information data flows for HHMOAs

Introduction of data flows for Half Hourly Meter Operator Agents to pass on Commissioning information when there is a Change of Agent
Read More

CP1496: Data flows

Introduction of two new dataflows for Commissioning in the Metering System process for LDSOs, Suppliers and MOAs. Use of Data Transfer Network

Read More

CP1495: Rejection response dataflow for a D0170

Introduction of a rejection response dataflow for a D0170 ‘Request for Meter System Related Details’ request from the Meter Operator Agent to the Licensed Distribution System Operator where a D0215 ‘Provision of Site Technical Details’ response is required.
Read More

CP1494 – Introduction of an objection window for Housekeeping Change Proposals

Introduction of an objection window for Housekeeping Change Proposals
Read More

CP1493 – Add a form and associated process steps to BSCP15 for registering Non-Standard BM Unit configurations

Add a form and associated process steps to BSCP15 for registering Non-Standard BM Unit configurations
Read More

CP1492 – Causes and treatment of large Line Loss Factors

Causes and treatment of large Line Loss Factors
Read More

CP1491 – Lack of clarification surrounding the timeliness of Proving Tests and documentation for CVA MOA in BSCP02

Lack of clarification surrounding the timeliness of Proving Tests and documentation for CVA MOA in BSCP02
Read More

CP1490 – Changes to BSCP27 and Technical Assurance Agent Service Descriptions to remove constraints to service improvement

Changes to BSCP27 and Technical Assurance Agent Service Descriptions to remove constraints to service improvement
Read More

CP1489 – Amendments to BSCP128 to align with BSCP68 timescales for LLF submissions for BM Units transferring from SMRS to CMRS and vice versa

Amendments to BSCP128 to align with BSCP68 timescales for LLF submissions for BM Units transferring from SMRS to CMRS and vice versa
Read More

CP1488 – Align the NETA IDD spreadsheets with the live implementation of the SAA-I014 flow

Align the NETA IDD spreadsheets with the live implementation of the SAA-I014 flow
Read More

CP1487 – Remove the exclusion of Change of Measurement Classes in BSCP533 Appendix B

Remove the exclusion of Change of Measurement Classes in BSCP533 Appendix B
Read More

CP1486 – Removing example Advice Notes, Backing Sheets and Confirmation Notices from BSCP301

Removing example Advice Notes, Backing Sheets and Confirmation Notices from BSCP301
Read More

CP1485 – Validation of power transformer and cable/line loss adjustments

Validation of power transformer and cable/line loss adjustments
Read More

CP1484 – Introduction of Additional SVAA Validation at SVA Run time

Introduction of Additional SVAA Validation at SVA Run time
Read More

CP1483 – Changes to BSCP550 – Shared Metering Arrangements

Changes to BSCP550 – Shared Metering Arrangements
Read More

CP1482 – Upgrade of NHHDA and EAC/AA systems from Oracle 11g to version 12c

Upgrade of NHHDA and EAC/AA systems from Oracle 11g to version 12c
Read More

CP1481 – Housekeeping Change to BSCP536 following approval of P339

Housekeeping Change to BSCP536 following approval of P339
Read More

CP1480 – Creation of a new authorisation category for corrections to BOA related data

Creation of a new authorisation category for corrections to BOA related data
Read More

CP1479 – Updates to the Defined Metering Points in Codes of Practice 1, 2, 3, 5 and 10

Updates to the Defined Metering Points in Codes of Practice 1, 2, 3, 5 and 10
Read More

CP1478 – Automate the loading of the DF Matrix

Automate the loading of the DF Matrix
Read More

CP1477 – Updates to BSCP537 Appendix 1 as a result of P283

Updates to BSCP537 Appendix 1 as a result of P283
Read More

CP1476 – Facilitation of Incremental LLFs

Facilitation of Incremental LLFs
Read More

CP1475 – Remove obligation to re-date final NHH Meter readings on CoMC

Remove obligation to re-date final NHH Meter readings on CoMC
Read More

CP1474 – Updating the CoMC processes to facilitate the elective HH Settlement of SMETS Meters

CP1474 proposes to create new Change of Measurement Class processes for smart Meters.

Read More

CP1473 – Changes to the Long Term Vacant Entry Criteria

Changes to the Long Term Vacant Entry Criteria
Read More

CP1472 – Removal of SVA proving tests for Meters with a pulse multiplier of one

Removal of SVA proving tests for Meters with a pulse multiplier of one
Read More

CP1471 – Alignment of the CRA URS to the NETA IDD

Alignment of the CRA URS to the NETA IDD
Read More

CP1470 – Housekeeping Change to CoPs 1, 2, 3 and 5 following P266

Housekeeping Change to CoPs 1, 2, 3 and 5 following P266
Read More

CP1469 – Changes to support the implementation of the SRAG’s recommendations

Changes to support the implementation of the SRAG’s recommendations
Read More

CP1468 – Adoption of a standard template for raising Modifications

Adoption of a standard template for raising Modifications
Read More

CP1467 – Inclusion of site ID data within the BSCP11/07 ‘TDC Trading Dispute Findings’ form

Inclusion of site ID data within the BSCP11/07 'TDC Trading Dispute Findings' form
Read More

CP1466 – Removing SMETS compliant Meters from the scope of BSCP601

Removing SMETS compliant Meters from the scope of BSCP601
Read More

CP1465 – Sending revised MTDs following a change of NHHMOA

Sending revised MTDs following a change of NHHMOA
Read More

CP1464 – Requiring HH consumption data to be processed to appropriate precision

Requiring HH consumption data to be processed to appropriate precision
Read More

CP1463 – Process for Elexon to calculate category 1 non-compliance materiality

Process for Elexon to calculate category 1 non-compliance materiality
Read More

CP1462 – Allow the CDCA to break and remake Metering Equipment seals to access local interrogation port

Allow the CDCA to break and remake Metering Equipment seals to access local interrogation port
Read More

CP1461 – Amending BSCP128 to reflect a new simple SVA file format for LDSO LLF submissions

Amending BSCP128 to reflect a new simple SVA file format for LDSO LLF submissions
Read More

CP1460 – Timely inclusion of SBR Actions into imbalance cashout

Timely inclusion of SBR Actions into imbalance cashout
Read More

CP1459 – Amendments to the process for performing a Post-Final Settlement Run

Amendments to the process for performing a Post-Final Settlement Run
Read More

CP1458 – Introduction of timescales for the P283 Commissioning process for SVA CT operated Metering Systems

Introduction of timescales for the P283 Commissioning process for SVA CT operated Metering Systems
Read More

CP1457 – Changes to BSCP520 to support the introduction of Generic LED Charge Codes

Changes to BSCP520 to support the introduction of Generic LED Charge Codes
Read More

CP1456 – Clarification to BSCP514 regarding the sending of Meter Technical Details on receipt of a D0170 data flow

Clarification to BSCP514 regarding the sending of Meter Technical Details on receipt of a D0170 data flow
Read More

CP1455 – Sending revised Meter Technical Details following a change of Meter Operator Agent

Sending revised Meter Technical Details following a change of Meter Operator Agent
Read More

CP1454 – Amendment to the Category 1 Materiality Calculation

Amendment to the Category 1 Materiality Calculation
Read More

CP1453 – Changes to SAA Service Description and SAA URS for P269 systems fix

Changes to SAA Service Description and SAA URS for P269 systems fix
Read More

CP1452 – Aligning BSCP502 with amendments to the Electricity Supply Licence

Aligning BSCP502 with amendments to the Electricity Supply Licence
Read More

CP1451 – Allowing HH Default EACs for all HH Measurement Classes

Allowing HH Default EACs for all HH Measurement Classes
Read More

CP1450 – Security Requirements for CoP10 Metering Equipment

Security Requirements for CoP10 Metering Equipment
Read More

CP1449 – Updates to BSCP520 and the SVA Data Catalogue following a review

Updates to BSCP520 and the SVA Data Catalogue following a review
Read More

CP1448 – Changes to allowable software for Method 3 Proving Tests

Changes to allowable software for Method 3 Proving Tests
Read More

CP1447 – Amendment to the timescales for sending the D0010 from Supplier to NHHDC on a Smart Change of Supply event

Amendment to the timescales for sending the D0010 from Supplier to NHHDC on a Smart Change of Supply event
Read More

CP1446 – Allow smart CoS agreed Disputed Reads to be entered into Settlement

Allow smart CoS agreed Disputed Reads to be entered into Settlement
Read More

CP1445 – BSCP516 alignment with revised P272 Implementation Date

BSCP516 alignment with revised P272 Implementation Date
Read More

CP1444 – Extend the timescale of CoP10 Proving Tests until the implementation of P272

Extend the timescale of CoP10 Proving Tests until the implementation of P272
Read More

CP1443 – Standard Settlement Configurations for smart and advanced Meters

Standard Settlement Configurations for smart and advanced Meters
Read More

CP1442 – Clarifying the application process for Metering Dispensations

Clarifying the application process for Metering Dispensations
Read More

CP1441 – Allowing the Peer Comparison technique to be reported on a Supplier Agent level

Allowing the Peer Comparison technique to be reported on a Supplier Agent level
Read More

CP1440 – Exempting Metering Systems in Measurement Class F from proving tests

Exempting Metering Systems in Measurement Class F from proving tests
Read More

CP1439 – Proving Test Permissible Software

Proving Test Permissible Software
Read More

CP1438 – Clarification of information required for raising a Trading Dispute

Clarification of information required for raising a Trading Dispute
Read More

CP1437 – Recommended amendments to BSCP68

Recommended amendments to BSCP68
Read More

CP1436 – EAC/AA and NHHDA Applications – Windows Server upgrade

EAC/AA and NHHDA Applications – Windows Server upgrade
Read More

CP1435 – Amendments to the SAA-I042 flow

Amendments to the SAA-I042 flow
Read More

CP1434 – Amend the three digit numeric Line Loss Factor Class (LLFC) Id to an Alphanumeric LLFC Id

Amend the three digit numeric Line Loss Factor Class (LLFC) Id to an Alphanumeric LLFC Id
Read More

CP1433 – Clarification of which Metering Systems are captured by the P272 requirements

Clarification of which Metering Systems are captured by the P272 requirements
Read More

CP1432 – HH Default EAC by Measurement Class

HH Default EAC by Measurement Class
Read More

CP1431 – Extend Site Check Exemption to Measurement Classes F and G

Extend Site Check Exemption to Measurement Classes F and G
Read More

CP1430 – Clarification to the ECVN/MVRN processes

Clarification to the ECVN/MVRN processes
Read More

CP1429 – Proving Test timescales

Proving Test timescales
Read More

CP1428 – Inclusion of Party Agents in the event of Post Final Settlement Runs

Inclusion of Party Agents in the event of Post Final Settlement Runs
Read More

CP1427 – Housekeeping change to BSCP503 for EMR

Housekeeping change to BSCP503 for EMR
Read More

CP1426 – Receipt of the D0296 flow at II

Receipt of the D0296 flow at II
Read More

CP1425 – Consequential changes to BSCP201 following EMR

Consequential changes to BSCP201 following EMR
Read More

CP1424 – Amending the requirement for Data Aggregators to perform annual Full SMRS refreshes

Amending the requirement for Data Aggregators to perform annual Full SMRS refreshes
Read More

CP1423 – Amendments to BSCP68 following a review

Amendments to BSCP68 following a review
Read More

CP1422 – Add a Defined Metering Point for an Offshore Transmission Connection Point to the HH Codes of Practice

Add a Defined Metering Point for an Offshore Transmission Connection Point to the HH Codes of Practice
Read More

CP1421 – Linking BSCP520 obligations to the Operational Information Document

Linking BSCP520 obligations to the Operational Information Document
Read More

CP1420 – Allowance of mid-year LLF resubmissions due to material consumption or generation changes

Allowance of mid-year LLF resubmissions due to material consumption or generation changes
Read More

CP1419 – Improving data accuracy by enabling the D0312 flow to be sent on a Change of Supplier

Improving data accuracy by enabling the D0312 flow to be sent on a Change of Supplier
Read More

CP1418 – Validation of D0041 flows

Validation of D0041 flows
Read More

CP1417 – Reading validation for smart Meters

Reading validation for smart Meters
Read More

CP1416 – Remotely disabled smart Meters

Remotely disabled smart Meters
Read More

CP1415 – Reading submission frequency for smart Meters

Reading submission frequency for smart Meters
Read More

CP1414 – Combining LDSO and Embedded LDSOs UMS Inventories on to single LDSO MSID

Combining LDSO and Embedded LDSOs UMS Inventories on to single LDSO MSID
Read More

CP1413 – Amendments to BSCP535 ‘Technical Assurance’ following a review

Amendments to BSCP535 ‘Technical Assurance’ following a review
Read More

CP1412 – Reporting of deleted BOAs within the SAA-I014 report

Reporting of deleted BOAs within the SAA-I014 report
Read More

CP1411 – Remove exemption from Proving Tests for Code of Practice 10 Metering Systems

Remove exemption from Proving Tests for Code of Practice 10 Metering Systems
Read More

CP1410 – Transfer of Outstation Level 3 Passwords for advanced Meters

Transfer of Outstation Level 3 Passwords for advanced Meters
Read More

CP1409 – Change of Measurement Class process for advanced Meters

Change of Measurement Class process for advanced Meters
Read More

CP1408 – Excessively Large EAC/AA Control Points

Excessively Large EAC/AA Control Points
Read More

CP1407 – Updates to current LLF audit templates

Updates to current LLF audit templates
Read More

CP1406 – Electronic version of the Self Assessment Document

Electronic version of the Self Assessment Document
Read More

CP1405 – Facilitating Faster Switching in the NHH Market

Facilitating Faster Switching in the NHH Market
Read More

CP1404 – Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points

Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points
Read More

CP1403 – Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections

Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections
Read More

CP1402 – Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract

Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract
Read More

CP1401 – Replace residual negative EACs for pre-RF Settlement Days without affecting post-RF data

Replace residual negative EACs for pre-RF Settlement Days without affecting post-RF data
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.