List of all BSC Change Proposals
CP1545 ‘Introducing Technical Assurance of Metering (TAM) Central Volume Allocation (CVA) Specific Sample audits’
CP1544 ‘BSCCo Approved EFR Representative sign-off required for any EFR plan following escalation’
CP1543 ‘Use of DTC dataflow D0051 in the Half Hourly sector’
CP1542 ‘Transfer the obligation to visit de-energised sites annually from Data Collector to Supplier’
CP1541 ‘Use of D0004 in BSCP502’
CP1540 ‘Strengthening the Qualification – Change of Ownership Process’
CP1539 ‘Inclusion of LCCC as an Affected party in Metering Dispensation applications’
CP1538 Correct Specification of TERRE Tibco messages
The Assessment Report for CP1538 was presented to the ISG on 2 February 2021, where it was approved for implementation in the April 2021 ad-hoc BSC release
CP1537 ‘Extending the Timescales for agreeing Technical Assurance of Performance Assurance Parties (TAPAP) Findings Reports’
CP1536 ‘Use of DTC data flow D0379 for submission of unmetered Half Hourly data’
CP1535 ‘Interconnector Fuel Type Category update to BMRS’
CP1535 seeks to Add the North Sea Link (NSL) Interconnector to the BMRS. CP1535 will also enable the withdrawal of the CP1516 interim solution to incorporate data from IFA2 and ElecLink Interconnectors on the BMRS.
CP1534 ‘Introduce Change of Supplier (CoS) – No Meter Process’
CP1533 ‘Mandatory Sending of D0052 for DCC serviced SVA NHH Metering Systems’
CP1533 intends to update clause 3.2.6.50 in BSCP504 to remove instances of the word “new” in order to make it clear that D0052s shall be sent in all instances.
CP1532 ‘Reduce Half Hourly Change of Supplier timelines to meet the Initial Settlement Run’
CP1531 ‘Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run’
Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run
CP1530 ‘Introduction of a formalised process for the validation of measurement transformer ratios by Elexon’
CP1529 ‘Earlier initiation of Supplier Agreed Meter Readings process’
CP1528 ‘CoP4 clarification of BSC Party responsibility for Commissioning of measurement transformers that the BSC Party adopts’
CP1527 ‘Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’
CP1526 ‘Introduction of Service Level Agreements for rectifying Meter faults’
CP1526 seeks to introduce formal Service Level Agreements that should be adhered to by Meter Operator Agents (MOAs) and Licensed Distribution System Operators (LDSOs) when rectifying Half Hourly Meter faults to ensure continued overall accountability of rectifying faults on Metering Equipment.
CP1525 ‘Improving the involvement of the LDSO in the fault resolution process’
CP1525 seeks to define a new process that would place obligations on Licensed Distribution System Operators (LDSOs) to rectify Half Hourly Meter faults where the fault is with Metering Equipment owned by the LDSO.
CP1524 ‘Improving the communication methods in the fault rectification process’
CP1524 seeks to implement changes to the communication process used by parties involved in rectifying faults on Half Hourly Metering Equipment.
CP1523 ‘D0312 Process Alignment’
CP1522 ‘Updates to BSCP520 to align with working practices and UMSUG recommendations’
CP1521 ‘BSCP70 Amendments for IA and IEA’
This Change Proposal seeks to amend BSCP70 to remove the statement excluding Interconnector Administrator (IA) and Interconnector Error Administrator (IEA) roles from the requirement to undergo CVA Qualification Testing.
CP1520 Clarification to ‘Change of Ownership’ process in BSCP537
CP1519 ‘Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations’
CP1518: Housekeeping change to address errors in the approved changes to BSCP514 for CP1515
CP1517: Changes to BSC Configurable Items for the TERRE Final Implementation Date
CP1516: New Interconnector Fuel Type Categories: ElecLink & IFA2
CP1515: Faster Switching
CP1514: Number of register digits for smart Meters
CP1513: Inconsistencies in BSCP601, CoP3 and CoP5
CP1512: Improving the format of BSCP11 forms
CP1511: Configurable Items
CP1510: Allow the online management of registrations, Market Entry and Market Exit
CP1509: Amend BSCP503 to add new recipients of the D0355 data flow
CP1508: Updating standards in the CoPs and BSCP601
CP1507: Updates to BSCP520 to align with working practices
CP1506: New Interconnector fuel type
CP1505: Off site Commissioning of current transformers
CP1504: amend BSCP201’s references to dual/single pricing
CP1503: Changes to European Transparency Regulation data
CP1502: Removal of Profile Classes 5-8 sampling data requirement
CP1501: Clarification of change of Supplier process
CP1500: SVA Qualification requirement for Smart Meter Configuration
CP1499: SVA Qualification Self-Assessment for Suppliers
CP1498: SVA Qualification Self-Assessment for MOAs
CP1497: Commissioning information data flows for HHMOAs
CP1496: Data flows
Introduction of two new dataflows for Commissioning in the Metering System process for LDSOs, Suppliers and MOAs. Use of Data Transfer Network