List of all BSC Change Proposals

(Showing items 51-100 of 1083)

Show 10 | 20 | 50 | 100 | All

CP1550 Updates to monitoring of voltage failure alarms requirements

This Change Proposal looks to simplify the management of phase failures and update the requirements of voltage failure alarms.

Read More

CP1549 ‘Amendment of BSCP516 to clarify the criteria for Non-Domestic SVA Metering Systems’

CP1549 seeks to remove the text from BSCP516 ‘Allocation of Profile Classes and SSC’s for Non Half Hourly SVA Metering Systems Registered in SMRS’ that suggests a Change of Measurement Class from HH to NHH Profile Classes 3 or 4 is not possible so that it aligns with the correct interpretation of the rules set out in the BSC.

Read More

CP1548 ‘Remove constraint requiring BMRS to publish data files in a specific CSV format and structure’

This change proposal, CP1548, seeks to remove the specification of particular download formats in NETA IDD Part 1 Document paragraph 4.13 and be housed and maintained in the BMRS API and Data Push User Guide

Read More

CP1547 ‘Clarification on Site Specific LLF Calculation Process for Embedded LDSOs’

CP1547 seeks to provide clarity for Embedded LDSOs that choose to calculate Site Specific Line Loss Factors rather than Mirroring, through updates to BSCP128. 

Read More

CP1546 ‘Introducing DTC flows to transfer UMS Summary Inventories and Control files’

Read More

CP1545 ‘Introducing Technical Assurance of Metering (TAM) Central Volume Allocation (CVA) Specific Sample audits’

Read More

CP1544 ‘BSCCo Approved EFR Representative sign-off required for any EFR plan following escalation’

Read More

CP1543 ‘Use of DTC dataflow D0051 in the Half Hourly sector’

Read More

CP1542 ‘Transfer the obligation to visit de-energised sites annually from Data Collector to Supplier’

Read More

CP1541 ‘Use of D0004 in BSCP502’

Read More

CP1540 ‘Strengthening the Qualification – Change of Ownership Process’

Strengthening the Qualification - Change of Ownership Process
Read More

CP1539 ‘Inclusion of LCCC as an Affected party in Metering Dispensation applications’

Read More

CP1538 Correct Specification of TERRE Tibco messages

The Assessment Report for CP1538 was presented to the  ISG on 2 February 2021, where it was approved for implementation in the April 2021 ad-hoc BSC release

Read More

CP1537 ‘Extending the Timescales for agreeing Technical Assurance of Performance Assurance Parties (TAPAP) Findings Reports’

Read More

CP1536 ‘Use of DTC data flow D0379 for submission of unmetered Half Hourly data’

Read More

CP1535 ‘Interconnector Fuel Type Category update to BMRS’

CP1535 seeks to Add the North Sea Link (NSL) Interconnector to the BMRS. CP1535 will also enable the withdrawal of the CP1516 interim solution to incorporate data from IFA2 and ElecLink Interconnectors on the BMRS.

Read More

CP1534 ‘Introduce Change of Supplier (CoS) – No Meter Process’

Read More

CP1533 ‘Mandatory Sending of D0052 for DCC serviced SVA NHH Metering Systems’

CP1533 intends to update clause 3.2.6.50 in BSCP504 to remove instances of the word “new” in order to make it clear that D0052s shall be sent in all instances.

Read More

CP1532 ‘Reduce Half Hourly Change of Supplier timelines to meet the Initial Settlement Run’

Read More

CP1531 ‘Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run’

Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run

Read More

CP1530 ‘Introduction of a formalised process for the validation of measurement transformer ratios by Elexon’

Read More

CP1529 ‘Earlier initiation of Supplier Agreed Meter Readings process’

Earlier initiation of Supplier Agreed Meter Readings process
Read More

CP1528 ‘CoP4 clarification of BSC Party responsibility for Commissioning of measurement transformers that the BSC Party adopts’

‘CoP4 clarification of BSC Party responsibility for Commissioning of measurement transformers that the BSC Party adopts’
Read More

CP1527 ‘Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’

'Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’
Read More

CP1526 ‘Introduction of Service Level Agreements for rectifying Meter faults’

CP1526 seeks to introduce formal Service Level Agreements that should be adhered to by Meter Operator Agents (MOAs) and Licensed Distribution System Operators (LDSOs) when rectifying Half Hourly Meter faults to ensure continued overall accountability of rectifying faults on Metering Equipment.

Read More

CP1525 ‘Improving the involvement of the LDSO in the fault resolution process’

CP1525 seeks to define a new process that would place obligations on Licensed Distribution System Operators (LDSOs) to rectify Half Hourly Meter faults where the fault is with Metering Equipment owned by the LDSO.

Read More

CP1524 ‘Improving the communication methods in the fault rectification process’

CP1524 seeks to implement changes to the communication process used by parties involved in rectifying faults on Half Hourly Metering Equipment.

Read More

CP1523 ‘D0312 Process Alignment’

BSCP501 Amendments to clarify the D0312 process
Read More

CP1522 ‘Updates to BSCP520 to align with working practices and UMSUG recommendations’

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1521 ‘BSCP70 Amendments for IA and IEA’

This Change Proposal seeks to amend BSCP70 to remove the statement excluding  Interconnector Administrator (IA) and Interconnector Error Administrator (IEA) roles from the requirement to undergo CVA Qualification Testing.

Read More

CP1520 Clarification to ‘Change of Ownership’ process in BSCP537

Clarification to 'Change of Ownership' process in BSCP537
Read More

CP1519 ‘Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations’

Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations
Read More

CP1518: Housekeeping change to address errors in the approved changes to BSCP514 for CP1515

Housekeeping change to address errors in the approved changes to BSCP514 for CP1515
Read More

CP1517: Changes to BSC Configurable Items for the TERRE Final Implementation Date

Changes to BSC Configurable Items for the TERRE Final Implementation Date
Read More

CP1516: New Interconnector Fuel Type Categories: ElecLink & IFA2

New Interconnector Fuel Type Categories: ElecLink & IFA2
Read More

CP1515: Faster Switching

Meter Operator Agents to send Metering System Data to SMRS instead of ECOES for the Faster Switching Programme
Read More

CP1514: Number of register digits for smart Meters

Number of register digits for smart Meters
Read More

CP1513: Inconsistencies in BSCP601, CoP3 and CoP5

Updates removing inconsistencies within and between BSCP601, CoP3 and CoP5
Read More

CP1512: Improving the format of BSCP11 forms

Improving the format of BSCP11 forms
Read More

CP1511: Configurable Items

Clarification of BSCP40 definitions and processes
Read More

CP1510: Allow the online management of registrations, Market Entry and Market Exit

Allow the online management of registrations, Market Entry and Market Exit
Read More

CP1509: Amend BSCP503 to add new recipients of the D0355 data flow

Amend BSCP503 to add new recipients of the D0355 data flow
Read More

CP1508: Updating standards in the CoPs and BSCP601

Updating references to the British and International Standards within the relevant Code Subsidiary Documents.
Read More

CP1507: Updates to BSCP520 to align with working practices

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1506: New Interconnector fuel type

New Interconnector fuel type
Read More

CP1505: Off site Commissioning of current transformers

Allowing ‘off site’ Commissioning of current transformers preinstalled in cut outs or switchgear at manufacture for use in low voltage (LV) installations
Read More

CP1504: amend BSCP201’s references to dual/single pricing

Amend BSCP201’s references to dual/single pricing following implementation of P305
Read More

CP1503: Changes to European Transparency Regulation data

Changes to European Transparency Regulation data to align with latest ENTSO-e Manual of Procedures
Read More

CP1502: Removal of Profile Classes 5-8 sampling data requirement

Removal of the requirement to submit sampling data for Profile Classes 5-8 following the implementation of P272
Read More

CP1501: Clarification of change of Supplier process

Correction to P302 footnote in BSCP504
Read More