List of all BSC Change Proposals
CP1575 ‘Permitting the use of busbar voltage transformers within metering Codes of Practice 1 and 2’
This CP seeks to implement the recommendation from the Issue 87 ‘Busbar voltage transformer (VT) metering for Offshore wind farms under OFTO arrangements’ Workgroup by updating Code of Practice 1 and Code of Practice 2 to allow busbar VTs to be used at Offshore and onshore wind farms.
CP1574 ‘Improving the use of the D0215 data flow in the relevant industry processes’
This CP seeks to implement the recommendation from the Issue 99 Workgroup, which involves updating Balancing and Settlement Code Procedure (BSCP) 515 ‘Licensed Distribution’ and the Retail Energy Code (REC) Meter Operator Schedule 14 documents to streamline the use of the D0215 flow in its associated processes.
CP1573 ‘Amendments to the IDD Pt 1 Spreadsheet, SVA DC and REC EMAR Data Specification for P376’
This Change Proposal seeks to amend the IDD Part 1 Spreadsheet, SVA Data Catalogue Volume 2 and the Retail Energy Code’s’ EMAR Data Specification to ensure that the BSC Configurable Items accurately reflect the P376 solution.
CP1572 ‘Specifying the requirements to provide SLDs for HV and EHV sites’
Currently there is no requirement in the BSC to produce SLDs despite a number of BSC processes requiring one to be submitted. Without the requirement to produce SLDs being specified, some Parties have not felt incentivised to create them.
CP1571 ‘Clarify the number of Meter measuring elements and measurement transformers’
The Metering Codes of Practice (CoPs) specify the number of measuring elements required to be metered in relation to the number of primary system conductors. However, the requirements don’t appear to be sufficiently clear or are not being complied with.
CP1570 ‘Housekeeping amendments to include reference to ‘Asset Metering Virtual Lead Party’’
CP1570 is a Housekeeping change seeking to correct minor errors identified during the preparation for implementation of Approved Modification P375 ‘Settlement of Secondary Balancing Mechanism (BM) Units using metering behind the site Boundary Point’ as part of the June 2022 BSC Release.
CP1569 ‘Amendments to the IDD documentation to align with SAA migration’
This Change Proposal will seek to amend the IDD documentation to reflect SAA no longer having access to a shared database with CRA and CDCA plus will document the interface ‘BM Unit Period Metered Volume’.
CP1568 ‘Inclusion of new LDSO-mastered SMRS data items’
This Change Proposal will include new LDSO-mastered SMRS data items in the SVA Data Catalogue, the REC EMAR Data Specification and BSCP604.
CP1567 ‘New BSC Procedure (BSCP) for Assurance Information Requests (AIRs)’
The AIR is a Performance Assurance Technique (PAT) which was introduced in May 2022. Currently there is no related BSCP for an AIR, therefore when issuing an AIR, there is no written obligation on Parties to adhere to the request.
CP1566 ‘Introducing the CVA Commissioning End to End Check (CEEC) process’
CP1566 seeks to formalise the Central Volume Allocation (CVA) Commissioning End to End Check (CEEC) process in BSCP02, BSCP20, BSCP38, CoP4 and CDCA Service Description for new and existing CVA Metering Systems.