List of all BSC Change Proposals
CP1400 – Amendment of the System Energy flag via BSCP18
Amendment of the System Energy flag via BSCP18
CP1399 – Business Process Operations (BPO) Service rebranding
Business Process Operations (BPO) Service rebranding
CP1398 – Clarifications to BSCP520 ‘Unmetered Supplies registered in SMRS’
Clarifications to BSCP520 ‘Unmetered Supplies registered in SMRS’
CP1397 – Improvements to the Balancing Mechanism Reporting System (BMRS) Electricity Summary Page – Indicative Triad Demand Information tables
Improvements to the Balancing Mechanism Reporting System (BMRS) Electricity Summary Page – Indicative Triad Demand Information tables
CP1396 – Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process
Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process
CP1395 – Distribution of Configuration Details for Smart Meters
Distribution of Configuration Details for Smart Meters
CP1394 – Use of SMETS compliant Meters for Profiling
Use of SMETS compliant Meters for Profiling
CP1393 – Technical Assurance – CDC Check
Technical Assurance - CDC Check
CP1392 – BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method (BMRA-I002) instead of manual Email method (SAA-I033).
BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method (BMRA-I002) instead of manual Email method (SAA-I033).
CP1391 – Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures
Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures
CP1390 – New MDD Entity for SMETS Version
New MDD Entity for SMETS Version
CP1389 – Removal of Lux Meter Requirement for PECU Arrays
Removal of Lux Meter Requirement for PECU Arrays
CP1388 – Meter Technical Details for Smart Meters
Meter Technical Details for Smart Meters
CP1387 – Clarifications to BSCP533 and Appendices
Clarifications to BSCP533 and Appendices
CP1386 – Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent
Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent
CP1385 – Notification of NHH Energisation Status Change by LDSO
Notification of NHH Energisation Status Change by LDSO
CP1384 – Clarification on disconnection and associated processes
Clarification on disconnection and associated processes
CP1383 – Upgrade of NHHDA and EAC/AA systems to Oracle 11g
Upgrade of NHHDA and EAC/AA systems to Oracle 11g
CP1382 – Clarification of IDD rules for leading zeroes
Clarification of IDD rules for leading zeroes
CP1381 – Negative Wind Generation Forecast on BMRS
Negative Wind Generation Forecast on BMRS
CP1380 – Removing Agent Restrictions for Appointment of PRA Agent
Removing Agent Restrictions for Appointment of PRA Agent
CP1379 – Service Review of the Technical Assurance of Metering Systems
Service Review of the Technical Assurance of Metering Systems
CP1378 – Alternative to CP1377 – Clarifying rules on Third Party Access on Licence Exempt Distribution Network
Alternative to CP1377 - Clarifying rules on Third Party Access on Licence Exempt Distribution Network
CP1377 – Clarifying rules on Third Party Access on Licence Exempt Distribution Network
Clarifying rules on Third Party Access on Licence Exempt Distribution Network
CP1376 – Issues with Reporting Failed Instructions (D0023) Flows
Issues with Reporting Failed Instructions (D0023) Flows
CP1375 – Increasing Material Impact Threshold
Increasing Material Impact Threshold
CP1374 – Pre-site audit visits – Technical Assurance of Metering
Pre-site audit visits - Technical Assurance of Metering
CP1373 – Uploading multiple ECVNs/MVRNs via the EWS
Uploading multiple ECVNs/MVRNs via the EWS
CP1372 – Housekeeping Change to Demand BM Unit Example in BSCP75
Housekeeping Change to Demand BM Unit Example in BSCP75
CP1371 – Removing requirements for Line Loss Factor Audit to be performed at the LDSO offices
Removing requirements for Line Loss Factor Audit to be performed at the LDSO offices
CP1370 – Revised rules for default LLF values
Revised rules for default LLF values
CP1369 – Increased Flexibility in BSCP550 Data Splitting Algorithms
Increased Flexibility in BSCP550 Data Splitting Algorithms
CP1368 – Clarify/Resolve Operational Issues Related to Unmetered Supplies in SMRS
Clarify/Resolve Operational Issues Related to Unmetered Supplies in SMRS
CP1367 – Reporting Data relating to the East-West Interconnector on the BMRS
Reporting Data relating to the East-West Interconnector on the BMRS
CP1366 – Data Quality Obligations for Outgoing Supplier Agents
Data Quality Obligations for Outgoing Supplier Agents
CP1365 – Shortening Profile Production Timescales
Shortening Profile Production Timescales
CP1364 – Remove BSC Systems constraint on maximum negative CALF values
Remove BSC Systems constraint on maximum negative CALF values
CP1363 – Addressing Settlement Data Adjustments in a Balanced Manner
Addressing Settlement Data Adjustments in a Balanced Manner
CP1362 – Removal of Residual Negative EACs
Removal of Residual Negative EACs
CP1361 – Removal of Extreme EACs
Removal of Extreme EACs
CP1360 – Inclusion of Audit Records for Gross Volume Correction and Dummy Meter Exchanges
Inclusion of Audit Records for Gross Volume Correction and Dummy Meter Exchanges
CP1359 – Introducing new products into the Market Index Definition Statement
Introducing new products into the Market Index Definition Statement
CP1358 – Change to timeband weightings in the Market Index Definition Statement
Change to timeband weightings in the Market Index Definition Statement
CP1357 – Correction to MSID Allocation Process
Correction to MSID Allocation Process
CP1356 – Demand BM Unit Aggregation Rule Example for BSCP75
Demand BM Unit Aggregation Rule Example for BSCP75
CP1355 – Update to BSCP537 Qualification Appendix 2: Testing Requirements
Update to BSCP537 Qualification Appendix 2: Testing Requirements
CP1354 – Clarifying commissioning requirements of BSCP537 Qualification Appendix 1: Self Assessment Document (SAD)
Clarifying commissioning requirements of BSCP537 Qualification Appendix 1: Self Assessment Document (SAD)
CP1353 – Including the ECOES Meter Information flow (D0312) in BSCP514
Including the ECOES Meter Information flow (D0312) in BSCP514
CP1352 – Remove option of postal FAA invoices
Remove option of postal FAA invoices
CP1351 – Improving Half Hourly Metering Equipment commissioning and storage of associated commissioning data
Improving Half Hourly Metering Equipment commissioning and storage of associated commissioning data
CP1350 – Clarifying Meter Technical Details relating to Metering Systems that can be read remotely
Clarifying Meter Technical Details relating to Metering Systems that can be read remotely
CP1349 – Changes to accommodate EU metering standards
Changes to accommodate EU metering standards
CP1348 – Supplier Charges following implementation of CP1334 ‘New PARMS Serials’
Supplier Charges following implementation of CP1334 'New PARMS Serials'
CP1347 – Enhancements to SVAA Process for Distribution of Consumption Data for Embedded Networks
Enhancements to SVAA Process for Distribution of Consumption Data for Embedded Networks
CP1346 – Proving tests shall not be based on verbal Meter Technical Details
Proving tests shall not be based on verbal Meter Technical Details
CP1345 – Migration of interface between National Grid and BMRA/SAA/ECVAA from CSV to XML file format
Migration of interface between National Grid and BMRA/SAA/ECVAA from CSV to XML file format
CP1344 – New PARMS Serials: Further Amendments to BSCP533 and BSCP533 Appendices
New PARMS Serials: Further Amendments to BSCP533 and BSCP533 Appendices
CP1343 – Appropriate Line Loss Factors for High Voltage Customers metered at primary substations
Appropriate Line Loss Factors for High Voltage Customers metered at primary substations
CP1342 – House Keeping Change to correct a Manifest Error in CoP9
House Keeping Change to correct a Manifest Error in CoP9
CP1341 – Unmetered Supplies: Accommodating Multi-Level Static Dimming Devices in Half-Hourly and Non-Half-Hourly Settlement
Unmetered Supplies: Accommodating Multi-Level Static Dimming Devices in Half-Hourly and Non-Half-Hourly Settlement
CP1340 – Changes to BSCP537 Appendix 1 – Self Assessment Document (SAD) to better reflect the BSC Obligations
Changes to BSCP537 Appendix 1 - Self Assessment Document (SAD) to better reflect the BSC Obligations
CP1339 – Amendments to BSCP533 to enable changes to the hosting and operation of the PARMS system
Amendments to BSCP533 to enable changes to the hosting and operation of the PARMS system
CP1338 – Guidance for Complex Sites – Network Flows affecting Settlement Meter Readings
Guidance for Complex Sites - Network Flows affecting Settlement Meter Readings
CP1337 – Improvements to the BSC Trading Disputes Process
Improvements to the BSC Trading Disputes Process
CP1336 – UMSO Adjustment of EACs and Pseudo HH Units based on Physical Audit Findings
UMSO Adjustment of EACs and Pseudo HH Units based on Physical Audit Findings
CP1335 – Mandating use of Auxiliary Meter Technical Details Data flow
Mandating use of Auxiliary Meter Technical Details Data flow
CP1334 – New PARMS Serials
New PARMS Serials
CP1333 – Improved Reporting of Prices for SO – SO Trades
Improved Reporting of Prices for SO - SO Trades
CP1332 – Addition of examples for Offshore generator Aggregation Rules to BSCP75
Addition of examples for Offshore generator Aggregation Rules to BSCP75
CP1331 – Streamlining the Party & CVA Party Agent Registration Processes within BSCP65 and BSCP71
Streamlining the Party & CVA Party Agent Registration Processes within BSCP65 and BSCP71
CP1330 – Streamlining Elexon’s role in the delivery of the Registration Processes
Streamlining Elexon's role in the delivery of the Registration Processes
CP1329 – Amendment to the administration of the CVA Qualification process
Amendment to the administration of the CVA Qualification process
CP1328 – Changes to the ECVAA Web Service (EWS) request process
Changes to the ECVAA Web Service (EWS) request process
CP1327 – Inclusion of a new MDD Entity 27 (Clock Interval) form in BSCP509
Inclusion of a new MDD Entity 27 (Clock Interval) form in BSCP509
CP1326 – Update to BSCP128 from lessons learnt exercise carried out with LDSOs
Update to BSCP128 from lessons learnt exercise carried out with LDSOs
CP1325 – Removal of Obsolete PARMS Serials
Removal of Obsolete PARMS Serials
CP1324 – Access Requirements for Offshore Metering Installations at 132kV or Above
Access Requirements for Offshore Metering Installations at 132kV or Above
CP1323 – Review of the Qualification Self Assessment Document
Review of the Qualification Self Assessment Document
CP1322 – Review of the CSD Architectural Principles Document
Review of the CSD Architectural Principles Document
CP1321 – Housekeeping Change to correct a manifest error in BSCP301 and NETA IDD Part 2
Housekeeping Change to correct a manifest error in BSCP301 and NETA IDD Part 2
CP1320 – Replacement of erroneous Change of Supplier Readings
Replacement of erroneous Change of Supplier Readings
CP1319 – Correction to table B4 of Appendix B in Code of Practice 4
Correction to table B4 of Appendix B in Code of Practice 4
CP1318 – Minor changes to BSCP601
Minor changes to BSCP601
CP1317 – Removal of requirement for NHHMOAs to notify NHHDCs of metering work before the event
Removal of requirement for NHHMOAs to notify NHHDCs of metering work before the event
CP1316 – Removal from BSCP536 of obligation to attach a copy of Form 536/01 to BSCCo Bill
Removal from BSCP536 of obligation to attach a copy of Form 536/01 to BSCCo Bill
CP1315 – Maintenance of Outstation Types as part of Compliance and protocol approval
Maintenance of Outstation Types as part of Compliance and protocol approval
CP1314 – Housekeeping change to SAA Service Description
Housekeeping change to SAA Service Description
CP1313 – Remove Elexon from the Minimum Eligible Amount (MEA) request process
Remove Elexon from the Minimum Eligible Amount (MEA) request process
CP1312 – Use of Gross Volume Correction in Post Final Settlement Runs
Use of Gross Volume Correction in Post Final Settlement Runs
CP1311 – Replacing Erroneous Forward Looking EAC
Replacing Erroneous Forward Looking EAC
CP1310 – Clarifications to Gross Volume Correction Process
Clarifications to Gross Volume Correction Process
CP1309 – Include reference to D0303 in BSCP514 and circumstances in which its use is mandatory
Include reference to D0303 in BSCP514 and circumstances in which its use is mandatory
CP1308 – Changes to Long Term Vacant Site process where a reading is obtained via a warrant
Changes to Long Term Vacant Site process where a reading is obtained via a warrant
CP1307 – Minor Changes to the Long Term Vacant Site Process
Minor Changes to the Long Term Vacant Site Process
CP1306 – Removal of second criterion for identifying a site as a Long Term Vacant (LTV)
Removal of second criterion for identifying a site as a Long Term Vacant (LTV)
CP1305 – Use of Site Visit Check Code (SVCC) 20 with additional information in the Long Term Vacant (LTV) process
Use of Site Visit Check Code (SVCC) 20 with additional information in the Long Term Vacant (LTV) process
CP1304 – Exclusion of certain Site Visit Check Codes (SVCC) within the Long Term Vacant (LTV) site process
Exclusion of certain Site Visit Check Codes (SVCC) within the Long Term Vacant (LTV) site process
CP1303 – Requirement on Half Hourly Data Collectors to Estimate Missing Reactive Power Demand Values
Requirement on Half Hourly Data Collectors to Estimate Missing Reactive Power Demand Values
CP1302 – Requirement on Half Hourly Data Collectors to Validate Reactive Power Demand Values
Requirement on Half Hourly Data Collectors to Validate Reactive Power Demand Values
CP1301 – Registration Requirements for System Connection Points Between Onshore Distribution Systems and Offshore Transmission Systems
Registration Requirements for System Connection Points Between Onshore Distribution Systems and Offshore Transmission Systems