List of all BSC Change Proposals

(Showing items 41-60 of 1078)

Show 10 | 20 | 50 | 100 | All

CP1555 ‘Consumption data for Measurement Classes G and F’

This CP proposes to update the requirements in BSCP502 to require HHDCs to send D0036 or D0275 for non-Data Communications Company (DCC) enrolled Metering Systems and/or D0380 for DCC enrolled Metering Systems to Licenced Distribution System Operators (LDSOs).

Read More

CP1554 ‘Future proofing the measurement transformer standards’

CP1554 looks to future proof the  measurement transformer standards in Code of Practices 1, 2, 3, 4, 5 and 10

Read More

CP1553: Meters and Current Transformers minimum accuracy classes

This Change proposal looks to tighten the requirements for Meters and Current Transformers in the Code of Practice.

Read More

CP1552 ‘Reflecting BSCP501 timeframes in BSCP520 processes’

CP1552 seeks to provide clarity to market participants about the timeframes for various processes in BSCP520 ‘Unmetered Supplies Registered in SMRS’. 

Read More

CP1551 ‘Measuring Instruments Regulations – updates to BSCP601’

CP1551 seeks to update BSCP601 ‘Metering Protocol Approval and Compliance Testing’ so it aligns with new Government legislation for new Meters being placed on the GB market.

Read More

CP1550: Updates to monitoring of voltage failure alarms requirements

This Change Proposal looks to simplify the management of phase failures and update the requirements of voltage failure alarms.

Read More

CP1549 ‘Amendment of BSCP516 to clarify the criteria for Non-Domestic SVA Metering Systems’

CP1549 seeks to remove the text from BSCP516 ‘Allocation of Profile Classes and SSC’s for Non Half Hourly SVA Metering Systems Registered in SMRS’ that suggests a Change of Measurement Class from HH to NHH Profile Classes 3 or 4 is not possible so that it aligns with the correct interpretation of the rules set out in the BSC.

Read More

CP1548 ‘Remove constraint requiring BMRS to publish data files in a specific CSV format and structure’

This change proposal, CP1548, seeks to remove the specification of particular download formats in NETA IDD Part 1 Document paragraph 4.13 and be housed and maintained in the BMRS API and Data Push User Guide

Read More

CP1547 ‘Clarification on Site Specific LLF Calculation Process for Embedded LDSOs’

CP1547 seeks to provide clarity for Embedded LDSOs that choose to calculate Site Specific Line Loss Factors rather than Mirroring, through updates to BSCP128. 

Read More

CP1546 ‘Introducing DTC flows to transfer UMS Summary Inventories and Control files’

Read More

CP1545 ‘Introducing Technical Assurance of Metering (TAM) Central Volume Allocation (CVA) Specific Sample audits’

Read More

CP1544 ‘BSCCo Approved EFR Representative sign-off required for any EFR plan following escalation’

Read More

CP1543 ‘Use of DTC dataflow D0051 in the Half Hourly sector’

Read More

CP1542 ‘Transfer the obligation to visit de-energised sites annually from Data Collector to Supplier’

Read More

CP1541 ‘Use of D0004 in BSCP502’

Read More

CP1540 ‘Strengthening the Qualification – Change of Ownership Process’

Strengthening the Qualification - Change of Ownership Process
Read More

CP1539 ‘Inclusion of LCCC as an Affected party in Metering Dispensation applications’

Read More

CP1538 Correct Specification of TERRE Tibco messages

The Assessment Report for CP1538 was presented to the  ISG on 2 February 2021, where it was approved for implementation in the April 2021 ad-hoc BSC release

Read More

CP1537 ‘Extending the Timescales for agreeing Technical Assurance of Performance Assurance Parties (TAPAP) Findings Reports’

Read More

CP1536 ‘Use of DTC data flow D0379 for submission of unmetered Half Hourly data’

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.