Change consultations

This page lists all Change Consultations which are opened when we need to obtain feedback from the industry on potential Modifications, Change Proposals and Issues. The page also includes Change consultations which have ceased to be active as they have reached their closed date.

(Showing items 1-5 of 174)

Show 5 | 10 | 20 | All

P367 Report Phase Consultation

Summary

P367 proposes to remove all obsolete Supplemental Balancing Reserve (SBR) and Demand Side Balancing Reservice (DSBR) requirements, definitions, and references from the BSC and subsidiary documents. Further information can be found on the P367 webpage.

This is the P367 Report Phase Consultation, whereby industry views are requested in respect of the BSC Panel’s initial recommendations on the Modification.

P359 Report Phase Consultation

Summary

P359 seeks to introduce a new mechanised process for Generation Capacity (GC) and Demand Capacity (DC) re-declarations following a ‘GC/DC breach’. More details on the P359 page.

P344 Report Phase Consultation

Summary

P344 seeks to align the Balancing and Settlement Code (BSC) with the European Balancing Project TERRE (Trans European Replacement Reserves Exchange) requirements. This is in order to allow the implementation of the TERRE balancing product at national level and hence ensure compliance with the European Electricity Balancing Guideline (EB GL).

This is the P344 Report Phase Consultation, whereby industry views are requested in respect of the BSC Panel’s initial recommendations on the Modification.

P362 second Assessment Procedure Consultation

Summary

At its meeting on 23 April 2018, the Workgroup, in response to the first Assessment Consultation responses, decided to raise an Alternative Modification. This requires second Assessment Procedure Consultation. The Proposed Solution is identical to the Proposed Modification, except that the Alternative allows the Transmission Company (TC) to apply for, and be granted, BSC Derogations.

P362 seeks to enable BSC Parties to be derogated against specific BSC obligations in order to trial pre-competitive and innovative products and services. Ofgem will act as the point of entry to co-ordinate applications across the industry. This is designed to improve the customer experience and reduce the burden for applicants, particularly where applications require derogation from more than one industry code

P361 Assessment Procedure Consultation

Summary

Under the EU Third Package (Article 2 of Regulation 714/2009) Interconnector flows should be treated as part of the Transmission System and not as Production or Consumption. The current BSC charging arrangements are not aligned with the EU Third Package. This Modification Proposal seeks to exclude Interconnector Balancing Mechanism (BM) Units from the Main Funding Share and SVA (Production) Funding Share BSC Charges, in order to better facilitate the EU Third Package.

The intent of the Proposed solution is that the excluded BSC Charges will be recalculated and re-billed from the implementation date back to the start of the previous financial year (1 April). The effects of this will be that any BSC Charges in the current financial year to date, will be recalculated and re-billed as one lump sum payment, subject to P361 approval.

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.