Change Consultations
List of Change Consultations
P451 Report Phase Consultation
P451 seeks to facilitate the implementation of NGESO’s new approach to Black Start, termed System Restoration. In doing so, it proposes to update all BSC references to “Black Start” to “System Restoration”, and enable contracted Restoration Service Providers who are non-BSC parties to claim BSC Black Start compensation.
P442 Assessment Procedure Consultation
P442 seeks to allow correct reporting of chargeable volumes to the Electricity Market Reform (EMR) Settlement Services Provider (SSP) for Supplier Volume Allocation (SVA) Metering Systems that record both exempt supply and licensed supply through the addition of a new Party Agent role, the Exempt Supply Notification Agent.
P454 Assessment Procedure Consultation
This Modification would remove the existing requirement within BSC Section V ‘Reporting’ (and facilitate potential future changes as explained in the report) for the Balancing Mechanism Reporting Agent (BMRA) to provide BMR Service (BMRS) data via the legacy on premise High Grade Service, otherwise referred to as the TIBCO service. This will align with the principle to make the BSC technology and vendor agnostic while not imposing infrastructure or vendor-tied solution to BSC Parties.
P456 Report Phase Consultation
Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.
Informal Consultation on the BSC changes needed to enable Elexon’s ownership change
Elexon were seeking views from industry on the proposed changes to the BSC to enable Elexon’s ownership change, as part of a process led by the Department for Energy Security and Net Zero (DESNZ) and Ofgem. The purpose of this informal consultation was to confirm that the proposed changes to the BSC meet the policy intent, as published by DESNZ and Ofgem.
This consultation was running in tandem with an Ofgem consultation on new electricity supply and generation licence conditions to implement the new ownership arrangements for Elexon.