Change Consultations

List of Change Consultations 

(Showing items 11-15 of 316)

Show 5 | 10 | 20 | All
View P465 Report Phase Consultation

P465 Report Phase Consultation

This Modification is required to correct an error in the approved legal drafting for P415. This Proposal will ensure that Credit Cover requirements for Virtual Trading Parties (VTPs) correctly take into account the energy volumes (‘Deviation Volumes’) that VTPs trade in wholesale markets, which was the intention of the P415 Workgroup.

View P451 Report Phase Consultation

P451 Report Phase Consultation

P451 seeks to facilitate the implementation of NGESO’s new approach to Black Start, termed System Restoration. In doing so, it proposes to update all BSC references to “Black Start” to “System Restoration”, and enable contracted Restoration Service Providers who are non-BSC parties to claim BSC Black Start compensation.

View P442 Assessment Procedure Consultation

P442 Assessment Procedure Consultation

P442 seeks to allow correct reporting of chargeable volumes to the Electricity Market Reform (EMR) Settlement Services Provider (SSP) for Supplier Volume Allocation (SVA) Metering Systems that record both exempt supply and licensed supply through the addition of a new Party Agent role, the Exempt Supply Notification Agent.

View P454 Assessment Procedure Consultation

P454 Assessment Procedure Consultation

This Modification would remove the existing requirement within BSC Section V ‘Reporting’ (and facilitate potential future changes as explained in the report) for the Balancing Mechanism Reporting Agent (BMRA) to provide BMR Service (BMRS) data via the legacy on premise High Grade Service, otherwise referred to as the TIBCO service. This will align with the principle to make the BSC technology and vendor agnostic while not imposing infrastructure or vendor-tied solution to BSC Parties.

View P456 Report Phase Consultation

P456 Report Phase Consultation

Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.