View P449 Urgent Modification Consultation on Energy Bill Relief Scheme

P449 Urgent Modification Consultation on Energy Bill Relief Scheme

This Modification seeks to enable Elexon (BSCCo) to act as the payment provider for the Government’s Energy Bill Relief Scheme for non-domestic electricity customers. The intention of the subsidy would be to reduce non-domestic consumer tariffs in light of the recent rises in energy costs.

View P448 Urgent EBGL Consultation

P448 Urgent EBGL Consultation

This Modification would enable Generators to continue generating during a Network Gas Supply Emergency, if it occurs.

The proposed solution would require changes to below BSC documents to create a mechanism in the BSC that allows Load Shedding instructions issued during a Stage 2+ Network Gas Supply Emergency to be treated as Accepted Bids for BSC purposes. The generator will be protected from BSC Imbalance Charges if the Load Shedding prevents them from delivering contracted positions agreed prior to receipt of the Load Shedding instruction:

  • BSC Sections B, G, M, Q, T and X;
  • Balancing and Settlement Code Procedure (BSCP)18;
  • Interface Definition and Design (IDD) Part 2 Document;
  • Settlement Administration Agent (SAA) Service Description; and
  • Settlement Administration Agent User Requirements Specification.
View P434 Report Phase Consultation

P434 Report Phase Consultation

This Modification will require a period of mandatory Change of Measurement Class (CoMC) activity for all Non-Half Hourly (NHH) Unmetered Supplies (UMS) Metering Systems to complete before the Market Wide Half Hourly Settlement (MHHS) migration to the Target Operating Model (Milestone 11 (M11) in the MHHS Timetable). At the time of writing, this would need to complete by October 2024. It will also require all new UMS connections to be settled Half Hourly (HH) from 12 months prior to M11, currently October 2023.

View P432 Send Back Consultation

P432 Send Back Consultation

This Modification proposes to align the BSC definition of an Advanced Meter with that in the Standard License Conditions (SLC) and to set explicit Half Hourly (HH) Settlement obligations for Current Transformer (CT) Advanced Meters ahead of the migration to Market-wide Half-Hourly Settlement (MHHS). 

View P448 Urgent Modification Consultation

P448 Urgent Modification Consultation

This Modification would enable Generators to continue generating during a Network Gas Supply Emergency, if it occurs.

View P447 Urgent Modification Consultation

P447 Urgent Modification Consultation

This Modification would prevent negative impacts to the cash-out price if NGESO’s Winter Contingency service is used.

 

View P446 Urgent Modification Consultation

P446 Urgent Modification Consultation

This Modification seeks to enable Elexon (BSCCo) to implement and administer the payment scheme for Suppliers as part of the Government’s Energy Price Guarantee (EPG) scheme for domestic electricity customers. The intention of the subsidy would be to reduce consumer tariffs in light of the recent rises in energy costs.

View P437 Report Phase Consultation

P437 Report Phase Consultation

This Modification proposes to introduce a provision in Section L ‘Metering’ to allow the relevant Meter Operator Agent to apply for Metering Dispensations on behalf of a non-BSC Party.

The solution will see non-BSC Parties being able to request Metering Dispensations for the relevant MOA (Supplier Volume Allocation (SVA) for SVA sites, Central Volume Allocation (CVA) for CVA sites) to apply on their behalf.

View P445 Report Phase Consultation

P445 Report Phase Consultation

This Modification seeks to allow the Funds Administration Agent (FAA) to process a Default Funding Share for unpaid Trading Charges earlier to reduce the cost of the borrowing facility and reduce the risk of shortfall. The Modification will also allow the Panel to instruct the FAA to release Trading Charges where the default relates to an Energy Supply Company Administration (ESCA).

View P427 Report Phase Consultation

P427 Report Phase Consultation

This Modification seeks to amend BSC Section Z to allow the Performance Assurance Board (PAB) to recommend that the Panel publish notices to industry in respect of Performance Assurance Parties’ (PAPs’) contribution to Settlement Risk along with relevant risk data.

This will increase the effectiveness of all detective and investigative Performance Assurance Techniques (PATs) including Error and Failure Resolution (EFR) through greater incentives. Improved efficiency of Performance Assurance Framework (PAF) with swifter resolution rates to EFR plans and any other significant issues that impact Settlement is expected.

  • BSC Section Z – Performance Assurance

 

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.