P460 ‘Amend the responsibility to propose and consult on a MHHS Migration Plan’

P460 aims to change responsibility for proposing, consulting on and obtaining approval of the Market-wide Half Hourly Settlement (MHHS) Migration Plan from BSCCo to the Market-wide Half Hourly Settlement Programme (MHHSP).

Read More

P459 ‘Allowing different Supplier Agents to be appointed to Import and Export MSIDs’

This Modification would allow Suppliers to appoint different Supplier Volume Allocation (SVA), Meter Operator Agents (MOAs) and Data Collectors (DCs) for the Import and Export Metering System Identifiers (MSIDs) where Data Communications Company (DCC) adopted smart meters are installed. Being able to appoint different Supplier Agents across Import/Export MSIDs will remove a barrier preventing the use of Export MSIDs for small-scale micro-generation, which currently disbenefits Suppliers, sales and operators of micro-generation, and electricity consumers.

Read More

P458 ‘Introducing Data Controller and Processor Obligations in the BSC for MHHS Testing’

The purpose of this Modification is to address the need for personal information sharing in the Balancing and Settlement Code (BSC), specifically in the context of the Market-wide Half Hourly Settlement (MHHS) testing. The current BSC General Data Protection Regulation (GDPR) and data protection provisions were not designed to allow the sharing of personal information, which has now become necessary for the planned MHHS testing.

Read More

P457 ‘Replace the Electricity Arbitration Association with the London Court of International Arbitration’

P457 proposes to remove the Electricity Arbitration Association (EAA) from the BSC and replace with the London Court of International Arbitration (LCIA) to deliver better value for money and service.

Read More

P456 ‘Enable Elexon to procure ancillary Technology Services for use by BSC Agents’

Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.

Read More

P455 ‘On-Site Aggregation as a method to facilitate Third Party Access’

This Modification seeks to establish a more cost effective and efficient method for delivering Third Party Access on private networks that include domestic and small business customers. It does so by enabling aggregated meter data from sub meters on private networks to be submitted into Settlement in lieu of data from Settlement meters installed at the Boundary Point.

Read More

P454 ‘Removal of BSC obligations to provide BMRS Data via TIBCO and the High Grade Service’

This Modification would remove the existing requirement within BSC Section V ‘Reporting’ for the Balancing Mechanism Reporting Agent (BMRA) to provide BMR Service (BMRS) data via the legacy High Grade Service, otherwise referred to as the TIBCO service.

P454 is a recommendation from BSC Issue 95, which considered the impacts associated with maintaining the legacy TIBCO service.

Read More

P453 ‘Metering Dispensation process improvements and clarification to the CoPs’

This Modification seeks to progress two recommendations from Issue 93 ‘Review of the BSC metering Codes of Practice’. The first recommendation clarifies the relevant Code of Practice (CoP) for circuits embedded behind the Boundary Point Metering System or Defined Metering Point (DMP). The second recommendation eliminates the need for Metering Dispensations when the Actual Metering Point (AMP) does not coincide with the DMP, but there is no impact on Settlement accuracy.

Read More

P452 ‘Replacement of the Energy Bill Relief Scheme for non-domestic customers with the Energy Bill Discount Scheme’

This Modification seeks to enable Elexon as the Balancing and Settlement Code Company (BSCCo) to act as the payment provider for the Government’s Energy Bill Discount (EBD) Scheme for non-domestic electricity customers. This scheme will replace the existing Energy Bill Relief (EBR) Scheme.

Read More

P451 ‘Updating BSC Black Start provisions and compensation arrangements’

P451 seeks to facilitate the implementation of NGESO’s new approach to Black Start, termed System Restoration. In doing so, it proposes to update all BSC references to “Black Start” to “System Restoration”, and enable contracted Restoration Service Providers who are non-BSC parties to claim BSC Black Start compensation.