List of all BSC Modifications

(Showing items 51-100 of 472)

Show 10 | 20 | 50 | 100 | All

P422 ‘Reflecting NCER Rules in the BSC’

Read More

P421 ‘Align BSC with Grid Code for TERRE Market Suspension’

This Modification aligns the BSC with the provisions introduced into the Grid Code under GC0144 ‘Alignment of Market Suspension Rights to the EU Emergency and Restoration Code Article 35.1(b)’.

Read More

P420 ‘Retail Code Consolidation Significant Code Review’

Read More

P419 ‘Extension of P383 to include non-final Demand’

This Modification seeks to enable BSC Systems to aggregate the Import data of all non-Final Demand sites for exclusion from Balancing Services and Use of System (BSUoS) charges.

Read More

P418 ‘Amendments to the P383 legal text for Additional BM Units’

P418 aims to ensure the Legal Text for approved BSC Modification P383 properly reflects the approved solution, business requirements, and is aligned with the BSC baseline introduced by P344, P354 and P388. In particular, it will clarify that the solution being delivered by P383 is applicable to both Supplier Base Balancing Mechanism (BM) Units and Additional BM Units.

Read More

P417 ‘Move the Letter of Credit templates and Approved Insurance Product requirements to the BSC Website’

Read More

P416 Introducing a route of appeal for the Annual Budget in line with the proposals for the Retail Energy Code

P416 seeks to amend the BSC to include an appeals mechanism that BSC Parties could use to challenge items in the Annual Budget.

Read More

P415 ‘Facilitating access to wholesale markets for flexibility dispatched by Virtual Lead Parties’

P415 seeks to amend the BSC to allow Virtual Lead Parties (VLPs) to participate in the GB wholesale market. 

Read More

P414 ‘Allowing a Party to Withdraw from the BSC and transfer outstanding liabilities to another Party’

Read More

P413 ‘Market-wide Half Hourly Settlement Programme Manager’

Read More

P412 ‘Ensuring non-BM Balancing Services providers pay for non-delivery imbalances at a price that reflects the real-time value of energy’

This Modification will introduce imbalance charges for non-Balancing Mechanism (BM) Balancing Services providers, where their delivery does not match instructed volumes. This will mean the GB market more effectively meets the requirements of the Clean Energy Package.

Read More

P411 ‘Including new LDSOs in Qualification to mitigate potential risks to Settlement’

P411 aims to improve the effectiveness of the Qualification Performance Assurance Technique (PAT) by requiring new Licensed Distribution System Operators (LDSOs) to undergo Qualification in this role. 

Read More

P410 ‘Changing imbalance price calculations to comply with the Imbalance Settlement Harmonisation regulations’

P410  sought to introduce changes to the imbalance price calculations to ensure BSC compliance with the European Imbalance Settlement Harmonisation regulations.

Read More

P409 ‘Aligning BMRS Reporting Requirements with the Clean Energy Package’

Read More

P408 ‘Simplifying the Output Usable Data Process’

P408 is being raised as a consequential BSC Modification to Grid Code Modification GC0130.

The Modification aims to deliver:

  • Continued alignment of the Grid Code and BSC processes; and
  • Improved market transparency and efficiency through provision of additional Output Usable, Margin and Surplus data in the two to three year ahead timescale.
Read More

P407 ‘Project MARI’

Read More

P406 ‘Temporary disapplication of Supplier Charge Serials SP08 and SP04 due to COVID-19’

Read More

P405: Allow notices via email where currently prohibited

P405 will allow notices that the BSC currently requires to be sent by post or fax to be sent by email.

Read More

P404 ‘Moving the SAD to a Category 3 BSC Configurable Item’

Moving the Self Assessment Document and associated documents from BSCP537 and making them a Category 3 BSC Configurable Item
Read More

P403: BSC Arrangements in the event that the TERRE Market is suspended by National Grid ESO

Read More

P402 ‘Enabling reform of residual network charging as directed by the Targeted Charging Review’

Following the conclusion of its Targeted Charging Review Significant Code Review , Ofgem directed National Grid and certain LDSOs to make changes to how residual revenues are recovered through Distribution Use of System (DUoS) and Transmission Network Use of System (TNUoS) demand charges.

Read More

P401: Governance arrangements for BSC Panel Alternates

To clarify the governance arrangements for BSC Panel Alternates in respect of their contribution to quoracy and voting at BSC Panel meetings. This will help to address ambiguity within the existing arrangements.

Read More

P400: BSC Panel Modification Business via Video/Teleconference

BSC Panel Modification Business via Video/Teleconference
Read More

P399 – BSAD Identity Visibility

P399 seeks to include additional information in the Balancing Services Adjustment Data (BSAD) to identify the assets involved in bilateral trades.

Read More

P398 ‘Increasing access to BSC Data’

P398 seeks to increase accessibility to data held by Elexon and BSC Agents. It will better align the BSC with the United Kingdom’s Industrial Strategy.

Read More

P397 Assessing the costs and benefits of adjusting Parties’ Imbalances following a demand disconnection

P397 seeks to introduce a mechanism through which the Balancing and Settlement Code Company (BSCCo) determines whether certain Parties should carry out the Settlement Adjustment Processes following a DCE.

Read More

P396 ‘Revised treatment of BSC Charges for Lead Parties of Interconnector BM Units’

Revised treatment of BSC Charges for Lead Parties of Interconnector BM Units
Read More

P395 ‘Aligning BSC Reporting with EMR Regulations – an enduring solution’

P395 seeks to introduce new and amended processes so that the BM Unit Gross Demand Report to the EMR Settlement limited (EMRS) only includes electricity ‘supplied’ to premises by Suppliers. 

Read More

P394 ‘Removal of Unused BSC Provisions’

Removal of Unused BSC Provisions
Read More

P393 ‘Disapplication of Supplier Charge SP01’

Disapplication of Supplier Charge SP01
Read More

P392 Amending BSC Change Process for EBGL Article 18

This Modification will ensure the process and responsibilities for amending BSC provisions constituting EBGL Article 18 terms and conditions reflect delegations made by NGESO in favor of the BSCCo and BSC Panel, to ensure a unified market change process.

Read More

P391 ‘Introducing Desktop Audits’

Introducing Desktop Audits
Read More

P390 ‘Allowing extensions to Elexon’s business and activities, subject to additional conditions’

P390 seeks to introduce a framework into the BSC that allows the Elexon Board to determine whether Elexon can undertake additional activities provided certain conditions are met, and with the consent of the Authority.

Read More

P389 Resolution of Capacity Market and Balancing Mechanism registration conflicts

P389 will delete BSC Section K paragraph 3.1.8(b) in order to remove conflict between the BSC and Capacity Market rules

Read More

P388 ‘Aligning the P344 and P354 Solutions’

'Aligning the P344 and P354 Solutions'
Read More

P387 ‘Allowing email communications for the BSC Panel Elections process’

This Modification Proposal aims to amend the Balancing and Settlement Code (BSC) Panel Elections process to allow communications between parties via email. Other communication methods could be approved by the BSC Panel on a case-by-case basis.

Read More

P386 Corrections to P344 legal text

Corrections and clarifications to the P344 ‘Project TERRE’ legal text
Read More

P385 ‘Improving the efficacy and efficiency of the Section H Default provisions’

Improving the efficacy and efficiency of the Section H Default provisions
Read More

P384: The publication of European Electricity Balancing Guideline (EB GL) balancing data by BMRS

P384 'The publication of European Electricity Balancing Guideline (EB GL) balancing data by BMRS'
Read More

P383 ‘Enhanced reporting of demand data to the NETSO to facilitate CUSC Modifications CMP280 and CMP281’

Enhanced reporting of demand data to the NETSO to facilitate CUSC Modifications CMP280 and CMP281
Read More

P382 – Amendments to the BSC in the event of no-deal Brexit

The Balancing and Settlement Code (BSC) contains multiple references to European Union (EU) legislation and bodies. Additionally, it also contains text introduced as a result of implementing various EU legislation. Retaining these references and text following the United Kingdom’s (UK’s) withdrawal from the EU without a deal (‘no-deal Brexit’) would have meant that the BSC would have been technically inaccurate but would have remained operable because of the European Union Withdrawal Act 2018.

Read More

P381: Removal of Quarterly Reports

P381 proposes to remove Section C3.9.1 of the BSC in respect of ‘quarterly reports’. 

Read More

P380 ‘Revision to Replacement Reserve Bid Data submission deadline requirements’

Modifying the P344 wording of BSC Section Q ‘Balancing Services Activities’ to ensure National Grid ESO’s continued compliance with the Balancing and Settlement Code (BSC) and the Replacement Reserve Implementation Framework (RRIF).

Read More

P379 ‘Multiple Suppliers through Meter Splitting’

Enabling consumers to buy and sell electricity from/to multiple providers through Meter Splitting
Read More

P378 ‘Introduction of a CM Supplier Interim Charge’

Introduction of a CM Supplier Interim Charge
Read More

P377: Amending Gate Closures in Market Index Data

Amending Gate Closure references in Market Index Data to include trades up to the Submission Deadline in the Market Index Data Calculations
Read More

P376 ‘Utilising a Baselining Methodology to set Physical Notifications’

Utilising a Baselining Methodology to set Physical Notifications for Settlement of Applicable Balancing Services
Read More

P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’

P375 will allow Metering Equipment situated ‘behind’ the defined Boundary Point to be used for Settlement purposes in place of the Boundary Point Meter. Primarily, this will allow balancing-related services on-site from smaller assets to be separated from current imbalance-related activities, more accurately reflecting the balancing-energy volumes provided by the Balancing Service Provider (BSP).

Read More

P374: Aligning the BSC with EBGL

Aligning the BSC with the EBGL change process and derogation approach
Read More

P373: Reversal of P297

Reversing the changes relating to Approved Modification P297
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.