List of all BSC Modifications

These pages list all Modifications issued since 2010. Modification are raised to introduce changes that would alter any part of the BSC or any CSDs or BSC Systems impacted by the proposed changes.

(Showing items 201-300 of 422)

Show 10 | 20 | 50 | 100 | All

P222

Provision of EAC and AA data to Distributors
Read More

P221

Amendments to the Balancing and Settlement Code to reflect changes to the Fuel Security Code
Read More

P220

Provision of New Data Items for Improving Market Information
Read More

P219

Consistency between Forecast and Outturn Demand
Read More

P218

Facilitating Microgeneration within the BSC
Read More

P217

Revised Tagging Process and Calculation of Cash Out Prices
Read More

P216

Audit of LLF Production
Read More

P215

Revised Credit Cover Methodology for Generating BM Units
Read More

P214

Issue Relating to Funds Administration
Read More

P213

Facilitating microgeneration (Optional Single MPAN)
Read More

P212

Main Imbalance Price based on Market Reference Price
Read More

P211

Main imbalance price based on ex-post unconstrained schedule
Read More

P210

Revisions to the Text in Section P related to Single Notifications of Energy Contract Volumes and Metered Volume Reallocations
Read More

P209

Housekeeping Modification - Change of Code references from BSCP531 to BSCP537
Read More

P208

Housekeeping Modification
Read More

P207

Introduction of a new governance regime to allow a risk based Performance Assurance Framework (PAF) to be utilised and reinforce the effectiveness of the current PAF
Read More

P206

Publication of BSC Panel Election Results
Read More

P205

Increase in PAR level from 100MWh to 500MWh
Read More

P204

Scaled Zonal Transmission Losses
Read More

P203

Introduction of a seasonal Zonal Transmission Losses scheme
Read More

P202

Energy Imbalance Incentive Band
Read More

P201

Energy Imbalance Tolerance Band
Read More

P200

Introduction of a Zonal Transmission Losses scheme with Transitional Scheme
Read More

P199

Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code
Read More

P198

Introduction of a Zonal Transmission Losses scheme
Read More

P197

SVA Qualification Processes Review
Read More

P196

Treatment of Long Term Vacant Sites in Settlements
Read More

P195

Neutrality for CCGT BMUs Switching Between Gas and Distillate
Read More

P194

Revised Derivation of the 'Main' Energy Imbalance Price
Read More

P193

Improved Arrangements for Modification Proposals raised by the BSC Panel
Read More

P192

Change of Name of the Transmission Company
Read More

P191

Revised definition of Balancing Mechanism Unit to include Power Park Module
Read More

P190

Removal of the obligation on the CDCA to provide a witnessing and sealing service in respect of all Metering Equipment associated with CVA Metering Systems
Read More

P189

Clarification to Fulfil the Intent of P174
Read More

P188

Revision of Credit Default Provisions
Read More

P187

Introducing the ability for a BSC Party to request urgent status and for it to be considered by the Authority
Read More

P186

Rationalising the criteria for the submission and redeclaration of Demand & Generation Capacities
Read More

P185

Redrafting of BSC Sections U and W in relation to clauses pertaining to the processing and rectification of Trading Queries/Disputes
Read More

P184

Clarification of BSC Section W in relation to the application of the Query Deadline to Trading Queries/Disputes
Read More

P183

Additional Mechanisms for Obtaining a valid Change of Supplier Read
Read More

P182

Review and redefinition of the Non Half Hourly Settlement performance measures
Read More

P181

NGC Emergency Instruction re Damhead Creek 19.5.04: Deferral of Settlement Process
Read More

P180

Revision to BSC Modification implementation dates, where an Authority decision is referred to Appeal or Judicial Review
Read More

P179

Housekeeping Modification
Read More

P178

Reduction in the BSC withdrawal timescale for parties who have settled the vast majority of their trading debts
Read More

P177

Removal of Intertrip provisions from the BSC
Read More

P176

Clarification of the Requirements for Estimation/Deeming of Meter Readings/Advances in Certain Circumstances to Facilitate Correction of Anomalies in Settlement Consumption
Read More

P175

Development of provisions related to certain bid offer acceptances issued pursuant to the Grid Code (e.g. BC2.9 and BC2.10).
Read More

P174

Provision for Users of an Interconnector with a single Boundary Point connection to form a Trading Unit amongst themselves and with other BM Units at the same site
Read More

P173

Revised Settlement Arrangements for Emergency Instructions
Read More

P172

Removal of Emergency Instructions taken for System reasons from Imbalance Price
Read More

P171

Retrospective removal of Emergency Instructions taken for System reasons from Imbalance Price
Read More

P170

Amendments to the Balancing and Settlement Code (Code), and to the systems and processes that support it, to allow compliance with the changed application of VAT to Trading Charges
Read More

P169

Publication of BMU names on Elexon website
Read More

P168

Publication of BMU GC and DC values on Elexon website
Read More

P167

Erroneous Calculation of Bid Offer Acceptance (BOA) Volume
Read More

P166

Removal of unintentional effects of P123 to allow Supplier BM unit DC values to be revised downwards during a BSC Season
Read More

P165

Housekeeping Modification - Removal of Approved Modification P125
Read More

P164

Housekeeping Modification
Read More

P163

Clarification of the circumstances in which paragraph 6.5 of Section P (calculation of Error Correction Payment) should apply
Read More

P162

Changes to the definition of Imports and Exports
Read More

P161

Enhancement of BSCCo Board Structure
Read More

P160

Removal of the Anomalous Effect of the Error Correction Payment (ECP) for Multiple Claims Affecting the same Settlement Period and Energy Account
Read More

P159

Extending the scope of e-mail communications under the Code
Read More

P158

Introducing the ability to lodge a consolidated Letter of Credit (LoC)
Read More

P157

Replacement of current Supplier Charges rules
Read More

P156

Suspending the implementation of the zonal allocation of transmission losses
Read More

P155

Appeal Mechanism for Panel and Panel Committee Decisions
Read More

P154

Rectification of Inconsistencies in the Application of BSC Change Management Processes
Read More

P153

Additional Requirements to Support Competition in New and ‘Out-of-Area’ Distribution Networks
Read More

P152

Reduction of Credit Cover for a Trading Party in Default which has ceased trading and which has paid all accrued Trading Charges
Read More

P151

Housekeeping Modification
Read More

P150

Targeting excess costs of PNE appeals process at unsuccessful appellants
Read More

P149

Delay to the invoicing of the Past Notification Error (PNE) claims fee
Read More

P148

Revision of the claims fee to avoid undue discrimination between classes of Party in their funding of the PNE claims process
Read More

P147

Introduction of a Notified Contract Capacity to limit Party liability in event of erroneous contract notifications
Read More

P146

New Participation Capacity to the BSC – Clearing House
Read More

P145

Cost reflective mechanism to allocate any deficit arising from the application of the PNE claims fee
Read More

P144

Removal of CADL from the BSC
Read More

P143

Revision of P99 to Halt the Progression of the PARMS Serials, Standards and Supplier Charge Elements
Read More

P142

Minor Refinement to Allow a Level 2 Default Cure Period in Defined Circumstances
Read More

P141

Removal of Unintentional Effects of Approved Modification P106 on Supplier Charges
Read More

P140

Revised Credit Cover Methodology for Interconnector BM Units
Read More

P139

Removal of Trading Unit Restriction on Interconnector Users
Read More

P138

Contingency arrangements in relation to the implementation of Demand Control
Read More

P137

Revised Calculation of System Buy Price and System Sell Price
Read More

P136

Marginal Definition of the 'main' Energy Imbalance Price
Read More

P135

Marginal System Buy Price During Periods of Demand Reduction
Read More

P134

The Halting of Unnecessary and Inefficient Work and Expenditure Associated with
Read More

P133

Facility to permit BSCCo to undertake the role of the Profile Administrator
Read More

P132

Redefinition of Credit Cover Requirements to account for Reconciliation Charges
Read More

P131

Introduction of further provisions relating to the determination of Trading Disputes
Read More

P130

Clarification of the treatment of Non Half Hourly Export Consumption within PARMS performance Serial 1.
Read More

P129

Changes to Panel Determination Process and Panel Election Procedures
Read More

P128

Correction of Erroneous Energy Contract Volume Notification Errors in specifically defined limited circumstances
Read More

P127

Optional de-registration by insolvent Party
Read More

P126

Housekeeping Modification
Read More

P125

Apportionment of the Scottish Interconnector flows to the Northern and North Western GSP Groups for the purposes of calculating losses.
Read More

P124

Revision of mandatory half-hour metering criteria
Read More

P123

Assessment of Credit Cover following a Change in a Party's Portfolio
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

BSC training services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or