Glossary
List of all BSC Modifications
P222 – Provision of EAC and AA data to Distributors
Provision of EAC and AA data to Distributors
P221 – Amendments to the Balancing and Settlement Code to reflect changes to the Fuel Security Code
Amendments to the Balancing and Settlement Code to reflect changes to the Fuel Security Code
P220 – Provision of New Data Items for Improving Market Information
Provision of New Data Items for Improving Market Information
P219 – Consistency between Forecast and Outturn Demand
Consistency between Forecast and Outturn Demand
P218 – Facilitating Microgeneration within the BSC
Facilitating Microgeneration within the BSC
P217 – Revised Tagging Process and Calculation of Cash Out Prices
Revised Tagging Process and Calculation of Cash Out Prices
P216 – Audit of LLF Production
Audit of LLF Production
P215 – Revised Credit Cover Methodology for Generating BM Units
Revised Credit Cover Methodology for Generating BM Units
P214 – Issue Relating to Funds Administration
Issue Relating to Funds Administration
P213 – Facilitating microgeneration (Optional Single MPAN)
Facilitating microgeneration (Optional Single MPAN)
P212 – Main Imbalance Price based on Market Reference Price
Main Imbalance Price based on Market Reference Price
P211 – Main imbalance price based on ex-post unconstrained schedule
Main imbalance price based on ex-post unconstrained schedule
P210 – Revisions to the Text in Section P related to Single Notifications of Energy Contract Volumes and Metered Volume Reallocations
Revisions to the Text in Section P related to Single Notifications of Energy Contract Volumes and Metered Volume Reallocations
P209 – Housekeeping Modification – Change of Code references from BSCP531 to BSCP537
Housekeeping Modification - Change of Code references from BSCP531 to BSCP537
P208 – Housekeeping Modification
Housekeeping Modification
P207 – Introduction of a new governance regime to allow a risk based Performance Assurance Framework (PAF) to be utilised and reinforce the effectiveness of the current PAF
Introduction of a new governance regime to allow a risk based Performance Assurance Framework (PAF) to be utilised and reinforce the effectiveness of the current PAF
P206 – Publication of BSC Panel Election Results
Publication of BSC Panel Election Results
P205 – Increase in PAR level from 100MWh to 500MWh
Increase in PAR level from 100MWh to 500MWh
P204 – Scaled Zonal Transmission Losses
Scaled Zonal Transmission Losses
P203 – Introduction of a seasonal Zonal Transmission Losses scheme
Introduction of a seasonal Zonal Transmission Losses scheme
P202 – Energy Imbalance Incentive Band
Energy Imbalance Incentive Band
P201 – Energy Imbalance Tolerance Band
Energy Imbalance Tolerance Band
P200 – Introduction of a Zonal Transmission Losses scheme with Transitional Scheme
Introduction of a Zonal Transmission Losses scheme with Transitional Scheme
P199 – Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code
Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code
P198 – Introduction of a Zonal Transmission Losses scheme
Introduction of a Zonal Transmission Losses scheme
P197 – SVA Qualification Processes Review
SVA Qualification Processes Review
P196 – Treatment of Long Term Vacant Sites in Settlements
Treatment of Long Term Vacant Sites in Settlements
P195 – Neutrality for CCGT BMUs Switching Between Gas and Distillate
Neutrality for CCGT BMUs Switching Between Gas and Distillate
P194 – Revised Derivation of the ‘Main’ Energy Imbalance Price
Revised Derivation of the 'Main' Energy Imbalance Price
P193 – Improved Arrangements for Modification Proposals raised by the BSC Panel
Improved Arrangements for Modification Proposals raised by the BSC Panel
P192 – Change of Name of the Transmission Company
Change of Name of the Transmission Company
P191 – Revised definition of Balancing Mechanism Unit to include Power Park Module
Revised definition of Balancing Mechanism Unit to include Power Park Module
P190 – Removal of the obligation on the CDCA to provide a witnessing and sealing service in respect of all Metering Equipment associated with CVA Metering Systems
Removal of the obligation on the CDCA to provide a witnessing and sealing service in respect of all Metering Equipment associated with CVA Metering Systems
P189 – Clarification to Fulfil the Intent of P174
Clarification to Fulfil the Intent of P174
P188 – Revision of Credit Default Provisions
Revision of Credit Default Provisions
P187 – Introducing the ability for a BSC Party to request urgent status and for it to be considered by the Authority
Introducing the ability for a BSC Party to request urgent status and for it to be considered by the Authority
P186 – Rationalising the criteria for the submission and redeclaration of Demand & Generation Capacities
Rationalising the criteria for the submission and redeclaration of Demand & Generation Capacities
P185 – Redrafting of BSC Sections U and W in relation to clauses pertaining to the processing and rectification of Trading Queries/Disputes
Redrafting of BSC Sections U and W in relation to clauses pertaining to the processing and rectification of Trading Queries/Disputes
P184 – Clarification of BSC Section W in relation to the application of the Query Deadline to Trading Queries/Disputes
Clarification of BSC Section W in relation to the application of the Query Deadline to Trading Queries/Disputes
P183 – Additional Mechanisms for Obtaining a valid Change of Supplier Read
Additional Mechanisms for Obtaining a valid Change of Supplier Read
P182 – Review and redefinition of the Non Half Hourly Settlement performance measures
Review and redefinition of the Non Half Hourly Settlement performance measures
P181 – NGC Emergency Instruction re Damhead Creek 19.5.04: Deferral of Settlement Process
NGC Emergency Instruction re Damhead Creek 19.5.04: Deferral of Settlement Process
P180 – Revision to BSC Modification implementation dates, where an Authority decision is referred to Appeal or Judicial Review
Revision to BSC Modification implementation dates, where an Authority decision is referred to Appeal or Judicial Review
P179 – Housekeeping Modification
Housekeeping Modification
P178 – Reduction in the BSC withdrawal timescale for parties who have settled the vast majority of their trading debts
Reduction in the BSC withdrawal timescale for parties who have settled the vast majority of their trading debts
P177 – Removal of Intertrip provisions from the BSC
Removal of Intertrip provisions from the BSC
P176 – Clarification of the Requirements for Estimation/Deeming of Meter Readings/Advances in Certain Circumstances to Facilitate Correction of Anomalies in Settlement Consumption
Clarification of the Requirements for Estimation/Deeming of Meter Readings/Advances in Certain Circumstances to Facilitate Correction of Anomalies in Settlement Consumption
P175 – Development of provisions related to certain bid offer acceptances issued pursuant to the Grid Code (e.g. BC2.9 and BC2.10).
Development of provisions related to certain bid offer acceptances issued pursuant to the Grid Code (e.g. BC2.9 and BC2.10).
P174 – Provision for Users of an Interconnector with a single Boundary Point connection to form a Trading Unit amongst themselves and with other BM Units at the same site
Provision for Users of an Interconnector with a single Boundary Point connection to form a Trading Unit amongst themselves and with other BM Units at the same site
P173 – Revised Settlement Arrangements for Emergency Instructions
Revised Settlement Arrangements for Emergency Instructions