These pages list all Issues published since 2011. Issues are raised where problems or potential improvements to the current arrangements have been identified, but it’s not known how best they should be resolved. Once raised Issues will be discussed by an Issue Group to consider possible solutions, requirements or to define the scope and issue further.

(Showing items 1-112 of 112)

Show 5 | 10 | 20 | All

Issue 112 ‘Clarifying Half Hourly Data Collector (HHDC) obligations within BSCP502 regarding the fault investigation process.’

At the May 2023 Performance Assurance Board (PAB) meeting, Elexon presented the findings report for an Assurance Information Request (AIR) on SVA Risk 005 (Fault Resolution). The PAB responded with questions around some of these findings, specifically around: The reporting of alarm flags through Hand Held Reads (HHR); Differing approaches to dealing with several types of alarm flags and which alarm flags the Half-Hourly Data Collectors (HHDCs) choose to report on; and General concerns around HHDC non-compliance with the BSC.

Elexon reviewed the findings report for an Assurance Information Request on SVA Risk 005. The Performance Assurance Board (PAB) responded with questions around HHDC obligations and general concerns around HHDC non-compliance. Elexon further reviewed party responses and concluded that three of the five concluded findings were compliant with the BSCP502 but are not adequate for purpose and required an additional review. 

Elexon considers that leaving this issue unresolved could lead to impacts on Settlement, this could lead to a further occurrence of this issue happening and a high materiality impact if left unresolved.

Read More

Issue 111 ‘SMRA Liquidated Damages in MHHS Arrangements’

The Supplier Meter Registration Agent (SMRA) is a vital service under the Market Wide Half Hourly Settlement (MHHS) Target Operation Model (TOM) and the need to process messages and issue notifications within defined timescales is integral to enable downstream activities to take effect.

Service Level Agreements (SLAs) for SMRAs arrangements were added to the BSC as part of version 3.0 of the Retail Energy Code implementation, having originally been a part of the Master Registration Agreement. These SLAs are self-policed with the SMRAs distributing Service Credits to participants if not met and are not part of the BSC Performance Assurance Framework.

Whilst the concept of SLAs is still required, the current mechanism set out in Annex K-1 and
BSCP501 is no longer appropriate due to the implementation of the MHHS Target Operating
Model (TOM), with faster response times required. The MHHSP TOM does not address the concept of SLAs in relation to liquidated damages, therefore, BSCCo has raised Issue 111 to consider the best future approach.

Read More

Issue 110 ‘Modernising ECVN/MVRN submission and acknowledgement processes’

The method of Energy Contract Volume Notification (ECVN) submission has remained the same since New Electricity Trading Arrangements (NETA) go-live in March 2001 with Section P of the BSC allowing for 20 minutes from submission to acknowledgement (after which an ECVAA System Failure is declared). The current practice of notification can put Trading Parties and their counterparties at financial risk, particularly when notifying close to the Submission Deadline. This is because the rejection feedback can be close to or after the Submission Deadline leaving insufficient time to make a correction.

The current solution is underpinned by ageing technology from submission, authentication, acknowledgment and reporting. Elexon operates to a 15 minutes service level rather than the 20 minutes ECVAA System Failure point for acknowledgement, this service level has been met in eight of the past 12 months. Customer feedback has indicated a preference for a reduced service level that is relevant to trading in real time and therefore requiring immediate acknowledgement of their trades. This may increase competition by increasing liquidity in trades closer to the Submission Deadline.

Read More

Issue 109 ‘Treatment of domestic solar self-consumption within Settlement’

Many domestic customers are installing solar photovoltaics (PV) in their homes, allowing them to both consume the energy generated and export excess energy to the grid. However, the current Boundary Point Settlement metering system measures electricity Import and Export on an instantaneous basis. This means that even if a household generates and consumes equal amounts of energy over a period, they can still incur charges due to momentary imbalances between generation and consumption. As a result, customers may face higher bills and complexities in energy management. The current system also poses challenges in accurately reflecting the true energy surplus or deficit over a given settlement period.

Read More

Issue 108 ‘Further Extension of RTS Cost Recovery Arrangements Under the BSC’

The contract between Elexon and the Energy Networks Association (ENA) to pass the operational costs for the Radio Teleswitch Service (RTS) through the BSC as ‘BSC Costs’ is due to expire on 31 March 2024. The BSC pass-through operational costs are currently circa £5 million and there are circa 1 million RTS devices (Radio Teleswitches and Radio Telemeters) in use.

Read More

Issue 107 ‘Review of BSC Section N’

This Issue sought to review BSC Section N to identify which areas and associated processes are currently pain points experienced by the Industry. It aimed to identify solutions to address these to improve efficiency and the user experience for these processes.

Read More

Issue 106 ‘Review of BSC Credit Cover Arrangements’

The Credit Committee has requested that Elexon review the Credit Cover arrangements with industry experts through an Issue Group. This is in response to key concerns about credit being sufficient to protect the market from Supplier Failure while also not being an onerous burden on market participants. 

Read More

Issue 105 ‘Further considerations following implementation of BSC Modification P448′

Issue 105 was raised to explore the consequential impacts of the P448 Alternative Modification and make a recommendation as to whether further industry change is required.

Read More

Issue 104 ‘Extending RTS Cost Recovery Arrangements’

The contract between Elexon and the Energy Networks Association (ENA) to pass the operational costs for the Radio Teleswitch Service (RTS) through the BSC as ‘BSC Costs’ is due to expire on 31 March 2023. The BSC pass-through operational costs are expected to rise from c.£1.5m to c.£5m. Therefore, Elexon wishes to re-establish industry support for passing RTS costs through the BSC from April 2023 onwards, and confirm how the costs should be apportioned (for example Suppliers/Generators). It’s worth mentioning that since the BSC acts as a pass-through intermediary, Elexon has no control over the RTS cost, which is set through an ENA/BBC contract.

Read More

Issue 103 ‘Meter Registrants and Settlement Risk’

The Proposer believes that there would be value in reviewing existing controls for Settlement error prevention. It is critical to the Proposer that we address these problems prior to the Settlement timetable being shortened by Market-wide Half Hourly Settlement (MHHS) as the opportunities to readdress will be reduced thereafter.

Read More

Issue 102 ‘BSC Change Process Review’

A stakeholder survey conducted by Elexon identified a number of key issues/possible areas for improvement in the BSC Change process. The Issue Group  reviewed the BSC Change process to identify possible ways in which these key issues could be addressed or the BSC Change Process could be improved.

CP1584 ‘Allow non-BSC Parties to raise Change Proposals, add a CP withdrawal process and remove BCA/PACA concept’ was raised by Elexon on 1 August 2023 as a result of Issue 102.

Read More

Issue 101 ‘Ongoing Governance, Funding and Operation of the DIP’

Issue 101 intends to define the requirements and principles for the on-going Data Integration Platform (DIP) arrangements that can be included in a subsequent BSC Modification, including the ongoing governance, funding and operation of the DIP.

Read More

Issue 100 ‘Assessing BSC Black Start processes to support NGESO’s Distributed ReStart project’

National Grid Electricity System Operator’s Distributed ReStart project seeks to enable distribution-connected Plant to participate in an updated version of Electricity System Restoration (currently defined as Black Start in the BSC). 

Read More

Issue 99 ‘Review the use of the D0215 flow’

Issue 99 will review the use of the D0215 ‘Provision of Site Technical Details’ and its associated processes, to identify the areas of improvement.

Read More

Issue 98 ‘Review of the current practice of setting Dynamic Parameters’

Strict compliance with the market manipulation rules following Ofgem’s ‘Open letter on
dynamic parameters and other information submitted by generators in the Balancing
Mechanism’ may lead to a less economic/efficient outcome than what some generating
plant was doing prior Ofgem’s open letter being published. There is a concern around the
distinction between technical and economic dispatch of parameters.

Read More

Issue 97 ‘CT Meter stock shortage on the BSC following COVID-19 pandemic’

Due to a global shortage of materials and the on-going impacts of COVID-19 on global supply chains, there is a shortage of semi-conductors among other crucial components, which impacts the ability of Meter manufacturers to produce Meters. This shortage of Settlement Meters could impact on a number of BSC processes.

Read More

Issue 96 ‘Reporting to EMRS of chargeable volumes for SVA Metering Systems’

 This Issue seeks to explore enduring solutions which allow correct reporting to EMRS of chargeable volumes for Supplier Volume Allocation (SVA) Metering Systems that record both exempt supply and licensed supply. 

Read More

Issue 95 ‘Assessing the continued use of TIBCO service as a source of data for market participants’

This Issue seeks to establish the future of the TIBCO messaging service with the migration of BMRS as part of Elexon’s transformation programme.

Read More

Issue 94

Read More

Issue 93

Issue 93 will review the BSC metering Codes of Practice (CoPs), which have not been reviewed in totality before.

Read More

Issue 92

Reserve Scarcity Pricing Review

Read More

Issue 91

Read More

Issue 90

Read More

Issue 89

Read More

Issue 88

Read More

Issue 87

Read More

Issue 86

Issue 86 will review several processes relating to switching, Change of Supplier and Change of Agent. It will be of interest to Data Aggregators (DAs), Data Collectors (DCs), Meter Operator Agents (MOAs) and Suppliers.

Read More

Issue 85

Read More

Issue 84

Read More

Issue 83

Read More

Issue 82

Read More

Issue 81

Read More

Issue 80

Read More

Issue 79

Read More

Issue 78: Measurement and monitoring of Settlement performance

Read More

Issue 77

Read More

Issue 76

Read More

Issue 75

Read More

Issue 74

Read More

Issue 73: Review of fault management and resolution timescales

The Review of fault management and resolution timescales was introduced when a report from (TAPAP) found that the timescales for fixing faults were unclear; and insufficient guidance was provided on which party involved in the faults process was responsible for each step.

Read More

Issue 72

Read More

Issue 71

Read More

Issue 70

Read More

Issue 69: The Performance Assurance Framework Review

After 10 years of live operations and some significant industry changes such as smart metering and innovative business models, at its meeting on March 2017 the BSC Panel (264/07) approved the Performance Assurance Framework (PAF) review which Elexon is currently undertaking. The BSC Panel also approved Issue 69 to be formed to support the PAF review. 

Read More

Issue 68

Read More

Issue 67

Read More

Issue 66

Read More

Issue 65

Read More

Issue 64

Read More

Issue 63

Read More

Issue 62

Read More

Issue 61

Read More

Issue 60: Project TERRE

Read More

Issue 59

Read More

Issue 58

Read More

Issue 57

Read More

Issue 56

Read More

Issue 55

Read More

Issue 54

Read More

Issue 53

Read More

Issue 52

Read More

Issue 51

Read More

Issue 50

Read More

Issue 49: Change of Measurement Class (CoMC) process for Advanced Meters

Read More

Issue 48: SMETS & Codes of Practice (CoPs)

Read More

Issue 47: GB Implementation of the European Transparency Regulation

Read More

Issue 46: Non Half Hourly Interoperability

Read More

Issue 45: Introduction of Change of Supply Agreed Read Principle to correct all errors in Settlements

Read More

Issue 44: Balancing Mechanism Pricing

Read More

Issue 43: On-site Generation during Planned Outages

Read More

Issue 42: Black Start Generator – Defining a ‘Local Shutdown’

Read More

Issue 41: Improving the Quality and Accuracy of Data Flows

Read More

Issue 40: Review of Elexon Governance and Funding Arrangements for New Business Opportunities

Read More

Issue 39: Unrecorded Units identified by Revenue Protection Services

Read More

Issue 38: Potential Improvements to Credit Checking Rules to Support High Levels of Embedded Generation in North Scotland

Read More

Issue 37: Boundary Point Metering and BM Unit Issues in Section K

Read More

Issue 36: Party Failure and Default

Read More

Issue 35: Timing of Gate Closure and Related Matters

Read More

Issue 34: Distribution Losses

Read More

Issue 33: Fuel Security Code (FSC) Guidance

Read More

Issue 32: Black Start

Read More

Issue 31: Provision of Annualised Advance and Estimated Annual Consumption Data to LDSO

Read More

Issue 30: Cash Out Review

Read More

Issue 29: Profile Administration (PrA) Model

Read More

Issue 28: Further Considerations on Section P

Read More

Issue 27: Funds Administration

Read More

Issue 26: Issues Arising from Elexon PAB interpretation

Read More

Issue 25: Governance Issues related to PAB determination

Read More

Issue 24: Impact of BSC on Reactive Power Charging

Read More

Issue 23: Apparent Tendency for EAC Values to Under-Estimate Consumption

Read More

Issue 22: Indebtedness

Read More

Issue 21: Scope of Profile Administration

Read More

Issue 20: Fuel Security Code

Read More

Issue 19: PARMS – the way forward

Read More

Issue 18: Sleeper Bids

Read More

Issue 17: Review of Electricity Market Information (REMI)

Read More

Issue 16: Credit Default and the Default provisions in Section H of the BSC

Read More

Issue 15: Review of Trading Query Deadlines

Read More

Issue 14

Read More

Issue 13: Codes of Practice applicable to Metering Systems

Read More

Issue 12: Timescales for Withdrawal from the BSC

Read More

Issue 11: Performance Targets and Monitoring

Read More

Issue 10: Implementation Dates

Read More

Issue 09: Review of Aspects of the Modification Process

Read More

Issue 08: Apparent inconsistency between requirements for rectifying NHH meter reading his

Read More

Issue 07: Potential anomaly in respect of Bid Offer Acceptance (BOA) volume

Read More

Issue 06: Appropriateness of the Current Supplier Charging Mechanism

Read More

Issue 05: Treatment of Parties going directly into Level 2 Credit Default

Read More

Issue 04: Periodic Reviews of the BSC

Read More

Issue 03: Credit Cover for Interconnector Users

Read More

Issue 02: Credit Indebtedness Calculation During Holiday Periods

Read More

Issue 01: Credit Cover Provisions for BSC Signatories Withdrawing from the Market

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.