Showing 10-18 out of 25

Clarifying restrictions on the role of AgentRead More

A proposal to amend Rule 3.3.5 for greater clarity, to ensure that those with the ability to bid in the CM auctions are acting independently so that the market remains competitive.
Date Raised: 05 December 2023
Reference number: CP376
Category: Governance

Merging Capacity Market UnitsRead More

This amendment would allow Capacity Market Unit (CMU) to be merged after Prequalification, facilitating greater commercial flexibility and efficiency and helping to manage Capacity Market costs.
Date Raised: 15 November 2023
Reference number: CP375
Category: Assurance

Splitting Capacity Market UnitsRead More

This amendment would allow Capacity Market Units (CMUs) to be split after Prequalification, subject to the total Connection Capacity and Generating Technology Class being unchanged.
Date Raised: 15 November 2023
Reference number: CP374
Category: Assurance

Process Transfer from EMR Delivery Body to CM Settlement BodyRead More

A proposal to transfer roles and responsibilities from the EMR Delivery Body (EMR DB) to the CM Settlement Body (CMSB) for Metering Aggregation, Metering Assessment, Metering Test and DSR Component reallocation. This could reduce complexity and cost.
Date Raised: 09 August 2023
Reference number: CP373
Category: Governance

Change to Rule 4.4.4Read More

A proposal to amend Rule 4.4.4 to allow a Capacity Market Unit to change its configuration after prequalification, so long as it does not lower its derated capacity, and continues to meet its Auction Acquired Capacity Obligation (AACO).
Date Raised: 18 July 2023
Reference number: CP372
Category: Assurance

Protection from Very Late Network ConnectionsRead More

A proposal to amend Capacity Market Rules in situations where a Transmission Licensee (TL)/Distribution Network Operator (DNO) delays a connection date by over 1 year.
Date Raised: 07 June 2023
Reference number: CP371
Category: Assurance

Changes to Extended Performance TestRead More

This Change Proposal seeks to amend the methodology for Extended Performance Test, to better reflect the ability of storage assets to meet its contracted volume and duration.
Date Raised: 13 March 2023
Reference number: CP370
Category: Assurance

Secondary Trading with CMU Metering Aggregation RulesRead More

A proposed change to the legal text of Capacity Market Rule 9.2.5(b) to prevent Secondary Trading where Capacity Market Units (CMUs) do not have metering aggregation rules set up and approved.
Date Raised: 01 December 2022
Reference number: CP369
Category: Metering

CVR Publication and CMVRN Submission DeadlineRead More

This proposal seeks to amend Rule 10.5.1 to allow an extension of 30 minutes to the CVR publication time, proposing a new time of 5:30pm, to account for the additional time required by CMSB for calculating and processing the CVR prior to publishing.
Date Raised: 23 November 2022
Reference number: CP368
Category: Reporting