The CMAG Change Log spreadsheet contains an up-to-date high level overview of Capacity Market Rules change proposals. The Change Log contains the following information on each proposal:

  • The Proposer
  • A brief description of the issue and solution
  • The current stage
  • Whether an Ofgem decision has been made for a proposal
  • Whether any CMAG consultations have been carried out
  • The dates of the statutory consultation for each proposal (if applicable)
  • Which CMAG meetings the proposal was discussed at
  • The date the CMAG report was sent to Ofgem.

Further guidance is available in the guidance tab of the Change Log.

An updated copy of the Change Log is published as part of the Forward Work Plan.